ENS 48296: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/11/2012 03:08 CDT
| event date = 09/11/2012 03:08 CDT
| last update date = 09/12/2012
| last update date = 09/12/2012
| title = Technical Support Center Non-Functional Due To Planned Maintenance
| title = Technical Support Center Non-Functional Due to Planned Maintenance
| event text = A planned maintenance evolution at the Duane Arnold Energy Center (DAEC) will remove the TSC [Technical Support Center] ventilation system from service.  The TSC would be rendered non-functional with the loss of ventilation.  The repair to the TSC ventilation is expected to last 3 days.
| event text = A planned maintenance evolution at the Duane Arnold Energy Center (DAEC) will remove the TSC [Technical Support Center] ventilation system from service.  The TSC would be rendered non-functional with the loss of ventilation.  The repair to the TSC ventilation is expected to last 3 days.
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures.  Maintenance will be expedited to restore ventilation to the TSC.  
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures.  Maintenance will be expedited to restore ventilation to the TSC.  

Latest revision as of 21:03, 1 March 2018

ENS 48296 +/-
Where
Duane Arnold NextEra Energy icon.png
Iowa (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4 h-0.167 days <br />-0.0238 weeks <br />-0.00548 months <br />)
Opened: Hans Olson
04:08 Sep 11, 2012
NRC Officer: Donald Norwood
Last Updated: Sep 12, 2012
48296 - NRC Website
Loading map...