ENS 48301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/12/2012 08:06 CDT
| event date = 09/12/2012 08:06 CDT
| last update date = 09/13/2012
| last update date = 09/13/2012
| title = Technical Support Center Out Of Service For Planned Maintenance
| title = Technical Support Center Out of Service for Planned Maintenance
| event text = A planned maintenance activity at Cooper Nuclear Station will remove the TSC [Technical Support Center] ventilation system from service. The TSC ventilation system will be rendered non-functional during this maintenance period. The repair to the TSC ventilation is expected to last less than 2 days.
| event text = A planned maintenance activity at Cooper Nuclear Station will remove the TSC [Technical Support Center] ventilation system from service. The TSC ventilation system will be rendered non-functional during this maintenance period. The repair to the TSC ventilation is expected to last less than 2 days.
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless uninhabitable due to ambient temperature, radiological, or other conditions. CNS Station procedures provide appropriate monitoring and compensatory measures to ensure habitability of the TSC and, if necessary, instructions for relocation of TSC personnel should the need arise. In the event of TSC activation, maintenance will be expedited to restore ventilation to service.
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless uninhabitable due to ambient temperature, radiological, or other conditions. CNS Station procedures provide appropriate monitoring and compensatory measures to ensure habitability of the TSC and, if necessary, instructions for relocation of TSC personnel should the need arise. In the event of TSC activation, maintenance will be expedited to restore ventilation to service.

Latest revision as of 21:03, 1 March 2018

ENS 48301 +/-
Where
Cooper Entergy icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-3.55 h-0.148 days <br />-0.0211 weeks <br />-0.00486 months <br />)
Opened: Curtis Martin
09:33 Sep 12, 2012
NRC Officer: Bill Huffman
Last Updated: Sep 13, 2012
48301 - NRC Website
Loading map...