ENS 48652: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
| event date = 01/04/2013 23:37 CST | | event date = 01/04/2013 23:37 CST | ||
| last update date = 01/05/2013 | | last update date = 01/05/2013 | ||
| title = Automatic Reactor Scram Due | | title = Automatic Reactor Scram Due to a Turbine/Generator Trip | ||
| event text = Actuation of RPS with reactor critical. Reactor Scram occurred at 2337 CST 01/04/13 from 94% CTP (Core Thermal Power). The cause of the scram appears to be a Generator/Turbine trip. | | event text = Actuation of RPS with reactor critical. Reactor Scram occurred at 2337 CST 01/04/13 from 94% CTP (Core Thermal Power). The cause of the scram appears to be a Generator/Turbine trip. | ||
Appropriate off normal event procedures were entered to mitigate the transient with all systems responding as designed. No loss of offsite or ESF power occurred. No ECCS initiation signals were reached and no ECCS or Diesel Generator initiation occurred. | Appropriate off normal event procedures were entered to mitigate the transient with all systems responding as designed. No loss of offsite or ESF power occurred. No ECCS initiation signals were reached and no ECCS or Diesel Generator initiation occurred. | ||
Latest revision as of 21:02, 1 March 2018
| Where | |
|---|---|
| Grand Gulf Mississippi (NRC Region 4) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| Time - Person (Reporting Time:+-2.47 h-0.103 days <br />-0.0147 weeks <br />-0.00338 months <br />) | |
| Opened: | Hardy Farris 03:09 Jan 5, 2013 |
| NRC Officer: | Charles Teal |
| Last Updated: | Jan 5, 2013 |
| 48652 - NRC Website
| |