ENS 48652: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 01/04/2013 23:37 CST
| event date = 01/04/2013 23:37 CST
| last update date = 01/05/2013
| last update date = 01/05/2013
| title = Automatic Reactor Scram Due To A Turbine/Generator Trip
| title = Automatic Reactor Scram Due to a Turbine/Generator Trip
| event text = Actuation of RPS with reactor critical. Reactor Scram occurred at 2337 CST 01/04/13 from 94% CTP (Core Thermal Power). The cause of the scram appears to be a Generator/Turbine trip.
| event text = Actuation of RPS with reactor critical. Reactor Scram occurred at 2337 CST 01/04/13 from 94% CTP (Core Thermal Power). The cause of the scram appears to be a Generator/Turbine trip.
Appropriate off normal event procedures were entered to mitigate the transient with all systems responding as designed. No loss of offsite or ESF power occurred. No ECCS initiation signals were reached and no ECCS or Diesel Generator initiation occurred.
Appropriate off normal event procedures were entered to mitigate the transient with all systems responding as designed. No loss of offsite or ESF power occurred. No ECCS initiation signals were reached and no ECCS or Diesel Generator initiation occurred.

Latest revision as of 21:02, 1 March 2018

ENS 48652 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-2.47 h-0.103 days <br />-0.0147 weeks <br />-0.00338 months <br />)
Opened: Hardy Farris
03:09 Jan 5, 2013
NRC Officer: Charles Teal
Last Updated: Jan 5, 2013
48652 - NRC Website