ENS 48823: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/14/2013 18:00 CDT | | event date = 03/14/2013 18:00 CDT | ||
| last update date = 03/15/2013 | | last update date = 03/15/2013 | ||
| title = Partial Loss | | title = Partial Loss of Offsite Communications | ||
| event text = On 03/14/2013 at 1800 CDT, Browns Ferry Nuclear Plant experienced a partial loss of offsite communication to include the Emergency Notification System to the NRC and normal phone communication to offsite. This loss of communications appears to be the result of an unplanned degraded voltage condition on the 48VDC Telephone Battery supplying power to the communications network. Main Control Room indications and assessment capability were not affected. The Nextel cellular phone system, the satellite phones in the Control Rooms, and the Health Physics Radio Network were available onsite to communicate offsite. The plant radio system was also unaffected. Required corrective maintenance is being evaluated. Communication capability is being periodically restored during maintenance troubleshooting, but has not yet been permanently corrected. Operation of Unit 1, Unit 2, and Unit 3 was not affected by the event. | | event text = On 03/14/2013 at 1800 CDT, Browns Ferry Nuclear Plant experienced a partial loss of offsite communication to include the Emergency Notification System to the NRC and normal phone communication to offsite. This loss of communications appears to be the result of an unplanned degraded voltage condition on the 48VDC Telephone Battery supplying power to the communications network. Main Control Room indications and assessment capability were not affected. The Nextel cellular phone system, the satellite phones in the Control Rooms, and the Health Physics Radio Network were available onsite to communicate offsite. The plant radio system was also unaffected. Required corrective maintenance is being evaluated. Communication capability is being periodically restored during maintenance troubleshooting, but has not yet been permanently corrected. Operation of Unit 1, Unit 2, and Unit 3 was not affected by the event. | ||
At 2145 CDT, the NRC Operations Center was notified of alternate contact numbers for [Browns Ferry] until the Telephone Battery is fully restored. | At 2145 CDT, the NRC Operations Center was notified of alternate contact numbers for [Browns Ferry] until the Telephone Battery is fully restored. |
Latest revision as of 22:01, 1 March 2018
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+2.8 h0.117 days <br />0.0167 weeks <br />0.00384 months <br />) | |
Opened: | Tim Taylor 01:48 Mar 15, 2013 |
NRC Officer: | Vince Klco |
Last Updated: | Mar 15, 2013 |
48823 - NRC Website
| |