ENS 48894: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/17/2010 EDT
| event date = 11/17/2010 EDT
| last update date = 04/07/2013
| last update date = 04/07/2013
| title = After The Fact Discovery Of An Unusual Event Entry Condition
| title = After the Fact Discovery of an Unusual Event Entry Condition
| event text = During an extent of condition review of past radiological events, it was identified that an event on November 17, 2010 met the E-Plan entry criteria for GU1, 'Unexpected Increase In Plant Radiation Levels'. Due to an equipment deficiency, dose rates in one section of the Radwaste building rose from 0.08 mrem/hr to 80 mrem/hr. This satisfied the E-Plan criteria of a 1000 times change over normal radiation levels. This was initially identified in [Perry] Condition Report 2010-85937.
| event text = During an extent of condition review of past radiological events, it was identified that an event on November 17, 2010 met the E-Plan entry criteria for GU1, 'Unexpected Increase In Plant Radiation Levels'. Due to an equipment deficiency, dose rates in one section of the Radwaste building rose from 0.08 mrem/hr to 80 mrem/hr. This satisfied the E-Plan criteria of a 1000 times change over normal radiation levels. This was initially identified in [Perry] Condition Report 2010-85937.
The licensee notified the NRC Resident Inspector and will notify State and local authorities.
The licensee notified the NRC Resident Inspector and will notify State and local authorities.

Latest revision as of 22:01, 1 March 2018

ENS 48894 +/-
Where
Perry FirstEnergy icon.png
Ohio (NRC Region 3)
Reporting
Other Unspec Reqmnt
Time - Person (Reporting Time:+20942.78 h872.616 days <br />124.659 weeks <br />28.687 months <br />)
Opened: Thomas Morse
17:47 Apr 7, 2013
NRC Officer: Vince Klco
Last Updated: Apr 7, 2013
48894 - NRC Website
Loading map...