ENS 48628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/27/2012 14:45 CST
| event date = 12/27/2012 14:45 CST
| last update date = 04/12/2013
| last update date = 04/12/2013
| title = Scheduled Operations Support Center (Osc) Outage For Equipment Upgrade
| title = Scheduled Operations Support Center (Osc) Outage for Equipment Upgrade
| event text = Fort Calhoun Station (FCS) will be implementing a scheduled modification to renovate and upgrade the interior configuration of the site's Operational Support Center (OSC).  The OSC is located within the Technical Support Center (TSC). The TSC will remain fully operable. Due to the construction, beginning on December 27, 2012 with a planned completion date of February 27, 2013, the OSC will be inoperable.  An alternate OSC has been established on-site and is fully operable.
| event text = Fort Calhoun Station (FCS) will be implementing a scheduled modification to renovate and upgrade the interior configuration of the site's Operational Support Center (OSC).  The OSC is located within the Technical Support Center (TSC). The TSC will remain fully operable. Due to the construction, beginning on December 27, 2012 with a planned completion date of February 27, 2013, the OSC will be inoperable.  An alternate OSC has been established on-site and is fully operable.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 22:01, 1 March 2018

ENS 48628 +/-
Where
Fort Calhoun Omaha Public Power District icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.98 h-0.208 days <br />-0.0296 weeks <br />-0.00682 months <br />)
Opened: Michael Peak
15:46 Dec 27, 2012
NRC Officer: Pete Snyder
Last Updated: Apr 12, 2013
48628 - NRC Website
Loading map...