| event date = 03/11/2013 00:43 EDT
| event date = 03/11/2013 00:43 EDT
| last update date = 05/09/2013
| last update date = 05/09/2013
| title = Invalid Actuation Of The Auxiliary Feedwater System
| title = Invalid Actuation of the Auxiliary Feedwater System
| event text = This 60-day telephone notification is provided in accordance with 10 CFR 50.73(a)(1) to report an invalid actuation of the Unit 3 Auxiliary Feedwater (AFW) System reportable in accordance with 10 CFR 50.73(a)(2)(iv)(A).
| event text = This 60-day telephone notification is provided in accordance with 10 CFR 50.73(a)(1) to report an invalid actuation of the Unit 3 Auxiliary Feedwater (AFW) System reportable in accordance with 10 CFR 50.73(a)(2)(iv)(A).
On March 11,2013 at approximately 0043 [EDT], while starting the 3B Steam Generator Feed Pump (SGFP) for a one minute run, both trains of AFW started. Operators then manually closed the AFW flow control valves. AFW Trains 2 and 1 were restored to operable standby status at approximately 0112 [EDT] and 0117 [EDT], respectively.
On March 11,2013 at approximately 0043 [EDT], while starting the 3B Steam Generator Feed Pump (SGFP) for a one minute run, both trains of AFW started. Operators then manually closed the AFW flow control valves. AFW Trains 2 and 1 were restored to operable standby status at approximately 0112 [EDT] and 0117 [EDT], respectively.

Latest revision as of 22:01, 1 March 2018

ENS 49017 +/-
Where
Turkey Point NextEra Energy icon.png
Florida (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1427.45 h59.477 days <br />8.497 weeks <br />1.955 months <br />)
Opened: Paul Czaya
16:10 May 9, 2013
NRC Officer: John Shoemaker
Last Updated: May 9, 2013