ENS 49083: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 05/31/2013 EDT | | event date = 05/31/2013 EDT | ||
| last update date = 05/31/2013 | | last update date = 05/31/2013 | ||
| title = Part-21 Interim Report - Incorrect Pressurizer Support Loads | | title = Part-21 Interim Report - Incorrect Pressurizer Support Loads for Ap1000 | ||
| event text = The deviation being evaluated is an identified inconsistency between the applied design loads for the AP1000 plant pressurizer support columns and embedments and the calculated actual loads. As a result, certified for construction drawings have been delivered to customers of the AP 1000 plant new build projects with an incorrect pressurizer support column embedment design configuration. The planned changes to the embedments to correct this deviation for the pressurizer support columns will be reflected on revised certified for construction drawings but do not require changes to the current licensing basis. The certified for construction drawings have been delivered to U.S. AP1000 plant new build customers, V.C. Summer Units 2 and 3, and A.W. Vogtle Units 3 and 4. | | event text = The deviation being evaluated is an identified inconsistency between the applied design loads for the AP1000 plant pressurizer support columns and embedments and the calculated actual loads. As a result, certified for construction drawings have been delivered to customers of the AP 1000 plant new build projects with an incorrect pressurizer support column embedment design configuration. The planned changes to the embedments to correct this deviation for the pressurizer support columns will be reflected on revised certified for construction drawings but do not require changes to the current licensing basis. The certified for construction drawings have been delivered to U.S. AP1000 plant new build customers, V.C. Summer Units 2 and 3, and A.W. Vogtle Units 3 and 4. | ||
| URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2013/20130603en.html#en49083 | | URL = http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2013/20130603en.html#en49083 |
Latest revision as of 21:00, 1 March 2018
Where | |
---|---|
Westinghouse Electric Company Cranberry Township, Pennsylvania (NRC Region 1) | |
Organization: | Westinghouse Electric Company |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
Time - Person (Reporting Time:+8.15 h0.34 days <br />0.0485 weeks <br />0.0112 months <br />) | |
Opened: | James Gresham 12:09 May 31, 2013 |
NRC Officer: | Mark Abramovitz |
Last Updated: | May 31, 2013 |
49083 - NRC Website | |