| title = Technical Support Center Emergency Power Supply Removed From Service For Planned Maintenance
| title = Technical Support Center Emergency Power Supply Removed from Service for Planned Maintenance
| event text = A planned maintenance evolution at the Duane Arnold Energy Center (DAEC) has removed the emergency power supply to the TSC from service as of 0900 EDT. If a loss of the normal power supply to the TSC were to occur during this period, the TSC would be rendered non-functional. The repair to the power supply is expected to last 6 hours. If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures. Maintenance will be expedited to restore the emergency power supply to service. This notification is being made in accordance with 10 CFR 50.72(b)(3)(xiii) due to the loss of an Emergency Response Facility (ERF). An update will be provided once the TSC emergency power supply has been restored to normal operation.
| event text = A planned maintenance evolution at the Duane Arnold Energy Center (DAEC) has removed the emergency power supply to the TSC from service as of 0900 EDT. If a loss of the normal power supply to the TSC were to occur during this period, the TSC would be rendered non-functional. The repair to the power supply is expected to last 6 hours. If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures. Maintenance will be expedited to restore the emergency power supply to service. This notification is being made in accordance with 10 CFR 50.72(b)(3)(xiii) due to the loss of an Emergency Response Facility (ERF). An update will be provided once the TSC emergency power supply has been restored to normal operation.
The licensee has notified the NRC Resident Inspector.
The licensee has notified the NRC Resident Inspector.

Latest revision as of 22:00, 1 March 2018

ENS 49092 +/-
Where
Duane Arnold NextEra Energy icon.png
Iowa (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-3.55 h-0.148 days <br />-0.0211 weeks <br />-0.00486 months <br />)
Opened: Stephen Speirs
09:27 Jun 6, 2013
NRC Officer: Howie Crouch
Last Updated: Jun 6, 2013