ENS 49415: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 10/07/2013 10:27 CDT
| event date = 10/07/2013 10:27 CDT
| last update date = 10/07/2013
| last update date = 10/07/2013
| title = Planned Maintenance Causing Loss Of Meteorological Tower Data
| title = Planned Maintenance Causing Loss of Meteorological Tower Data
| event text = A planned maintenance evolution at the Duane Arnold Energy Center (DAEC) will de-energize the Meteorological Data Tower. No other indications or annunciators will be unavailable during this maintenance to affect the plant's ability to assess or monitor an accident or transient in progress. National Weather Service data is expected to be available throughout the duration of the planned maintenance. A follow up notification will be provided when power to the Meteorological Data Tower has been restored.
| event text = A planned maintenance evolution at the Duane Arnold Energy Center (DAEC) will de-energize the Meteorological Data Tower. No other indications or annunciators will be unavailable during this maintenance to affect the plant's ability to assess or monitor an accident or transient in progress. National Weather Service data is expected to be available throughout the duration of the planned maintenance. A follow up notification will be provided when power to the Meteorological Data Tower has been restored.
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.

Latest revision as of 21:59, 1 March 2018

ENS 49415 +/-
Where
Duane Arnold NextEra Energy icon.png
Iowa (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-3.72 h-0.155 days <br />-0.0221 weeks <br />-0.0051 months <br />)
Opened: Rob Spading
11:44 Oct 7, 2013
NRC Officer: Daniel Mills
Last Updated: Oct 7, 2013
49415 - NRC Website
Loading map...