| title = Part-21 Notification - Unqualified Material Used In Electrical Penetration Assemblies
| title = Part-21 Notification - Unqualified Material Used in Electrical Penetration Assemblies
| event text = The following information was received via fax:
| event text = The following information was received via fax:
Material supplied to MTCN [Mirion Technologies (Conax Nuclear)] by approved sub-suppliers audited to NCA-3800 by MTCN was considered to be ASME [American Society of Mechanical Engineers] qualified source material for Section II and Section III requirements.  During triennial survey of MTCN by the ASME for renewal of our N Type Certificates of Authorization, it was identified by the ASME survey team that material supplied by two (2) MTCN approved sub-suppliers should be considered unqualified source material.  At that time, MTCN's Quality Program did not include the use of unqualified source material.
Material supplied to MTCN [Mirion Technologies (Conax Nuclear)] by approved sub-suppliers audited to NCA-3800 by MTCN was considered to be ASME [American Society of Mechanical Engineers] qualified source material for Section II and Section III requirements.  During triennial survey of MTCN by the ASME for renewal of our N Type Certificates of Authorization, it was identified by the ASME survey team that material supplied by two (2) MTCN approved sub-suppliers should be considered unqualified source material.  At that time, MTCN's Quality Program did not include the use of unqualified source material.

Latest revision as of 21:51, 1 March 2018

ENS 49301 +/-
Where
Mirion Technologies Conax Nuclear
Buffalo, New York (NRC Region 1)
Organization: Mirion Technologies Conax Nuclear
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+8.9 h0.371 days <br />0.053 weeks <br />0.0122 months <br />)
Opened: John Macdonald
12:54 Aug 23, 2013
NRC Officer: Mark Abramovitz
Last Updated: Feb 5, 2014
49301 - NRC Website