ENS 51189: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 06/19/2015 CDT | | event date = 06/19/2015 CDT | ||
| last update date = 06/29/2015 | | last update date = 06/29/2015 | ||
| title = Lost Shipment | | title = Lost Shipment of I-123 | ||
| event text = On 06/8/15, a shipment of I-123, 1.4 mCi, used for diagnostic imaging, was shipped from the Mallinckrodt Maryland Heights, MO facility for overnight delivery via highway carrier to a company located in Baltimore, MD. The material was not received in Maryland as scheduled. The shipper, carrier and customer performed searches. The shipper concluded that the material was missing as of 6/19/15. | | event text = On 06/8/15, a shipment of I-123, 1.4 mCi, used for diagnostic imaging, was shipped from the Mallinckrodt Maryland Heights, MO facility for overnight delivery via highway carrier to a company located in Baltimore, MD. The material was not received in Maryland as scheduled. The shipper, carrier and customer performed searches. The shipper concluded that the material was missing as of 6/19/15. | ||
The half-life of I-123 is 13.3 hours. | The half-life of I-123 is 13.3 hours. |
Latest revision as of 21:47, 1 March 2018
Where | |
---|---|
Mallinckrodt Pharmaceuticals Maryland Heights, Missouri (NRC Region 3) | |
License number: | 24-04206-01 |
Organization: | Mallinckrodt Pharmaceuticals |
Reporting | |
10 CFR 20.2201(a)(1)(ii) | |
Time - Person (Reporting Time:+249.75 h10.406 days <br />1.487 weeks <br />0.342 months <br />) | |
Opened: | Manuel Diaz 14:45 Jun 29, 2015 |
NRC Officer: | Steve Sandin |
Last Updated: | Jun 29, 2015 |
51189 - NRC Website | |