ML20138R912: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20138R912 | | number = ML20138R912 | ||
| issue date = 10/21/1985 | | issue date = 10/21/1985 | ||
| title = Forwards Comments on Comanche Peak Review Team Action Plan VII.9.3, Document Control, Inadvertently Omitted from | | title = Forwards Comments on Comanche Peak Review Team Action Plan VII.9.3, Document Control, Inadvertently Omitted from | ||
| author name = Williams N | | author name = Williams N | ||
| author affiliation = CYGNA ENERGY SERVICES | | author affiliation = CYGNA ENERGY SERVICES | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 84056.091, NUDOCS 8511190240 | | document report number = 84056.091, NUDOCS 8511190240 | ||
| title reference date = 10-06-1985 | |||
| document type = CORRESPONDENCE-LETTERS, EXTERNAL CORRESPONDENCE, EXTERNAL LETTERS ROUTED TO NRC | | document type = CORRESPONDENCE-LETTERS, EXTERNAL CORRESPONDENCE, EXTERNAL LETTERS ROUTED TO NRC | ||
| page count = 2 | | page count = 2 | ||
| Line 16: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:i saeveers 101 Cahfornia Street, Suite 1000. San Francisco, CA 94111-5894 | {{#Wiki_filter:i saeveers 101 Cahfornia Street, Suite 1000. San Francisco, CA 94111-5894 415'397-5600 October 21, 1985 84056.091 Mr. W.G. Counsel Executive Vice President Texas Utilities Generating Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, TX 75201 | ||
==Subject:== | ==Subject:== | ||
Additional Cygna Questions / Comments on the CPRT Plan Texas Utilities Generating Company | Additional Cygna Questions / Comments on the CPRT Plan Texas Utilities Generating Company Comanche Peak Steam Electric Station Independent Assessment Program - All Phases | ||
==Reference:== | ==Reference:== | ||
N.H. | N.H. | ||
Williams (Cygna) | |||
Letter to W.G. | |||
Council (TUGCO), | |||
"Cygna Questions / Comments on the CPRT Plan", Letter No. 84056.085, dated October 6, 1985. | |||
==Dear Mr. Counsel:== | ==Dear Mr. Counsel:== | ||
The referenced letter transmitted Cygna's questions and comments on the CPRT Action Plans directly related to Cygna issues. | |||
Attached is a comment on CPRT Action Plan VII.9.3, " Document Control," which was indavertently excluded in the previous letter. | |||
Ve r y ours, b | |||
N.H. Williams Project Mana r Attachment cc: Mr. V. Noonan (USNRC) w/ attachment Ms. A. Vietti-Cook (USNRC) w/ attachment Mr. S. Treby (USNRC) w/ attachment Mr. W. Horin (Bishop, Liberman, et al.) w/ attachment Ms. J. van Amerongen (TUGC0/EBASCO) w/ attachment Mrs. J. Ellis (CASE) w/ attachment Mr. G. Pigott (Orrick, Herrington & Sutcliffe) w/ attachment Mr. F. Dougherty (TENERA) w/ attachment Mr. R. Ballard (Gibbs & Hill) w/ attachment Mr. J. Redding (TUGCO) w/ attachment hl190240851021 A | |||
ADOCK 05000445 f(/ | |||
PDR I | |||
San Francisco Boston Chicago Richlano | |||
CYGNA COMMENTS ON CPRT DESIGN CONTROL ACTION PLAN ITEM NUMBER: Vll.a.3 TITLE: DOCUMENT CONTROL 1. | |||
Areas the Plan Does Not Appear to Address A. | |||
Scope and Methodology Design Control RIL No. 8 CPRT, Appendix C, Action Plan Vll.a.3, Section 4.1 The Plan does not address the effect that historical document control problems may have had on the hardware installation. | |||
CYGNA COMMENTS ON CPRT DESIGN CONTROL ACTION PLAN ITEM NUMBER: Vll.a.3 TITLE: DOCUMENT CONTROL | |||
i 1 | i 1 | ||
l l | l l | ||
l l | l l | ||
l | l Texas Utilities Generating Company I of I (D | ||
Al 23CPRT-DC2 ll111111111111111!Il11111!!l11Project No. 84056 | |||
_ _ _ _ _ _ _ _}} | _ _ _ _ _ _ _ _}} | ||
Latest revision as of 17:40, 11 December 2024
| ML20138R912 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/21/1985 |
| From: | Williams N CYGNA ENERGY SERVICES |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| References | |
| 84056.091, NUDOCS 8511190240 | |
| Download: ML20138R912 (2) | |
Text
i saeveers 101 Cahfornia Street, Suite 1000. San Francisco, CA 94111-5894 415'397-5600 October 21, 1985 84056.091 Mr. W.G. Counsel Executive Vice President Texas Utilities Generating Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, TX 75201
Subject:
Additional Cygna Questions / Comments on the CPRT Plan Texas Utilities Generating Company Comanche Peak Steam Electric Station Independent Assessment Program - All Phases
Reference:
N.H.
Williams (Cygna)
Letter to W.G.
Council (TUGCO),
"Cygna Questions / Comments on the CPRT Plan", Letter No. 84056.085, dated October 6, 1985.
Dear Mr. Counsel:
The referenced letter transmitted Cygna's questions and comments on the CPRT Action Plans directly related to Cygna issues.
Attached is a comment on CPRT Action Plan VII.9.3, " Document Control," which was indavertently excluded in the previous letter.
Ve r y ours, b
N.H. Williams Project Mana r Attachment cc: Mr. V. Noonan (USNRC) w/ attachment Ms. A. Vietti-Cook (USNRC) w/ attachment Mr. S. Treby (USNRC) w/ attachment Mr. W. Horin (Bishop, Liberman, et al.) w/ attachment Ms. J. van Amerongen (TUGC0/EBASCO) w/ attachment Mrs. J. Ellis (CASE) w/ attachment Mr. G. Pigott (Orrick, Herrington & Sutcliffe) w/ attachment Mr. F. Dougherty (TENERA) w/ attachment Mr. R. Ballard (Gibbs & Hill) w/ attachment Mr. J. Redding (TUGCO) w/ attachment hl190240851021 A
ADOCK 05000445 f(/
PDR I
San Francisco Boston Chicago Richlano
CYGNA COMMENTS ON CPRT DESIGN CONTROL ACTION PLAN ITEM NUMBER: Vll.a.3 TITLE: DOCUMENT CONTROL 1.
Areas the Plan Does Not Appear to Address A.
Scope and Methodology Design Control RIL No. 8 CPRT, Appendix C, Action Plan Vll.a.3, Section 4.1 The Plan does not address the effect that historical document control problems may have had on the hardware installation.
i 1
l l
l l
l Texas Utilities Generating Company I of I (D
Al 23CPRT-DC2 ll111111111111111!Il11111!!l11Project No. 84056
_ _ _ _ _ _ _ _