{{#Wiki_filter:l'.1,
{{#Wiki_filter:l'.1, JAN 9126 NOTE T0: CRGR MEMBER 5 f
;                                                                JAN 9126 NOTE T0: CRGR MEMBER 5 f
MONTHLY REPORT Enclosed is a copy of the sumary of CRGR activities for the period November 1 - December 31, 1985. The sumary will be inc'luded in the ED0's Weekly Report to the Commission for the week ending January 10, 1986.
MONTHLY REPORT Enclosed is a copy of the sumary of CRGR activities for the period November 1 - December 31, 1985. The sumary will be inc'luded in the ED0's Weekly Report to the Commission for the week ending January 10, 1986.
Walt Schwink
Walt Schwink
Line 23: Line 22:
==Enclosure:==
==Enclosure:==
As stated
As stated
          . Distribution:
. Distribution:
JHSniezek WSchwink
JHSniezek WSchwink
          .DEDR0GR cf ROGR staff Central File PDR(NRG/CRGR)
.DEDR0GR cf ROGR staff Central File PDR(NRG/CRGR)
                                                              ~
~
8601100364 860109 PDR   REV9P NROCRGR GENERAL           PDR
8601100364 860109 PDR REV9P NROCRGR GENERAL PDR
                                                                                  )
)
                                                                                  * \
* \\ htc /
htc /
OFC :ROGR
OFC :ROGR           :ROGR c
:ROGR c
  ...--:--    .-...:...7.....:......--...:......-----:----...-----:---...------:---...---..
.-...:...7.....:......--...:......-----:----...-----:---...------:---...---..
:WSc   'n k   :            :            :          :          :
NAME :BG 1
NAME :BG      1
:WSc
  .--- :..A...---...:....------..:-....-......:-.......--..:..----... --:------------:---.-------
'n k
DATE :1/7/86       :1/1 /86     :            :
:..A...---...:....------..:-....-......:-.......--..:..----...
DATE :1/7/86
:1/1 /86


DEPUTY EXECUTIVE DIRECTOR FOR REGIONAL OPERATIONS AND GENERIC REQUIREMENTS     .
DEPUTY EXECUTIVE DIRECTOR FOR REGIONAL OPERATIONS AND GENERIC REQUIREMENTS (DEDR0GR)
(DEDR0GR)
Week Ending January 10, 1986 CRGR Attached is a summary of the CRGR activities for the period November 1 through December 31, 1985. Background material on topics reviewed by the Committee and the minutes of CRGR meetings are sent to the Commission.
Week Ending January 10, 1986 CRGR Attached is a summary of the CRGR activities for the period November 1 through December 31, 1985. Background material on topics reviewed by the Committee and the minutes of CRGR meetings are sent to the Commission. Copies are provided to the Public Document Room after the NRC has considered (in a public forum) or decided the matter addressed by the documents. Questions concerning this monthly report should be referred to Walt Schwink (492-8639).
Copies are provided to the Public Document Room after the NRC has considered (in a public forum) or decided the matter addressed by the documents. Questions concerning this monthly report should be referred to Walt Schwink (492-8639).


Page 1 cf 1-    -
Page 1 cf 1-
                                                                                                    -Date: January 8,.1986 SUMARY OF CRGR ACTIVITIES (November 1 through December 31,1985)
-Date: January 8,.1986 SUMARY OF CRGR ACTIVITIES (November 1 through December 31,1985)
* Meeting No.
Meeting No.
Meeting Date (Announcement                                         CRGR       CRGR Recommendation Date)                     Agenda               Status'           to EDO                               EDO Action 83             Review, Proposed Rulemaking       Complete CRGR recommended that the pro-       No action necessary at 11/27/85         (10 CFR 30, 40 A 70) Emergency         -
Meeting Date (Announcement CRGR CRGR Recommendation Date)
posed rule be approved for           this time because RES Preparedness for Fuel Cycle                 consideration by the Commission.     has not yet taken a and Other Radioactive Material                                                     position on the CRGR Licenses                                                                           recommendation.
Agenda Status' to EDO EDO Action 83 Review, Proposed Rulemaking Complete CRGR recommended that the pro-No action necessary at 11/27/85 (10 CFR 30, 40 A 70) Emergency posed rule be approved for this time because RES Preparedness for Fuel Cycle consideration by the Commission.
                  -Sponsoring Office - RES                                                                           -
has not yet taken a and Other Radioactive Material position on the CRGR Licenses recommendation.
                  -Category 2 Item
-Sponsoring Office - RES
                  -Issue #130 Review, Proposed Rev. 3 to         Complete CRGR recommended that the             No action necessary at RG 1.63, Electric Penetration               proposed RG be issued for   ~
-Category 2 Item
this time because RES Assen611es~in Containment                   public comment after modifi-         has not yet taken a Structures for Nuclear Power                 cation to reflect comments by         position on the CRGR Plants                                       CRGR.                                 recommendation.
-Issue #130 Review, Proposed Rev. 3 to Complete CRGR recommended that the No action necessary at this time because RES RG 1.63, Electric Penetration proposed RG be issued for
                  -Sponsoring Office - RES
~
                  -Category 2 Item
Assen611es~in Containment public comment after modifi-has not yet taken a Structures for Nuclear Power cation to reflect comments by position on the CRGR Plants CRGR.
                  -Issue #131 Review, Proposed Closeout         Complete CRGR recommended that the             No action necessary at Actions for Resolving Generic               staff move forward with               this time because NRR Issue B-19, Thermal Hydraulic _             issuance of generic letters           has not yet taken a Stability for BWRs                           addressing the closeout of             position on the CRGR B-19 and B_59.                         recommendation.
recommendation.
                  -Sponsoring Office - NRR                                                                   '
-Sponsoring Office - RES
                  -Category 2 Item
-Category 2 Item
                  -Issue #132
-Issue #131 Review, Proposed Closeout Complete CRGR recommended that the No action necessary at Actions for Resolving Generic staff move forward with this time because NRR Issue B-19, Thermal Hydraulic _
                                                  .}}
issuance of generic letters has not yet taken a Stability for BWRs addressing the closeout of position on the CRGR B-19 and B_59.
recommendation.
-Sponsoring Office - NRR
-Category 2 Item
-Issue #132
.}}

Latest revision as of 15:02, 11 December 2024

Forwards Summary of CRGR Activities for 851101-1231. Summary Will Be Included in EDO Weekly Rept to Commission for Wk Ending 860101
ML20141G694
Person / Time
Issue date: 01/09/1986
From: Schwink W
Committee To Review Generic Requirements
To:
Committee To Review Generic Requirements
References
NUDOCS 8601100364
Download: ML20141G694 (3)


Text

l'.1, JAN 9126 NOTE T0: CRGR MEMBER 5 f

MONTHLY REPORT Enclosed is a copy of the sumary of CRGR activities for the period November 1 - December 31, 1985. The sumary will be inc'luded in the ED0's Weekly Report to the Commission for the week ending January 10, 1986.

Walt Schwink

Enclosure:

As stated

. Distribution:

JHSniezek WSchwink

.DEDR0GR cf ROGR staff Central File PDR(NRG/CRGR)

~

8601100364 860109 PDR REV9P NROCRGR GENERAL PDR

)

  • \\ htc /

OFC :ROGR

ROGR c

.-...:...7.....:......--...:......-----:----...-----:---...------:---...---..

NAME :BG 1

WSc

'n k

..A...---...:....------..:-....-......:-.......--..:..----...

DATE :1/7/86

1/1 /86

DEPUTY EXECUTIVE DIRECTOR FOR REGIONAL OPERATIONS AND GENERIC REQUIREMENTS (DEDR0GR)

Week Ending January 10, 1986 CRGR Attached is a summary of the CRGR activities for the period November 1 through December 31, 1985. Background material on topics reviewed by the Committee and the minutes of CRGR meetings are sent to the Commission.

Copies are provided to the Public Document Room after the NRC has considered (in a public forum) or decided the matter addressed by the documents. Questions concerning this monthly report should be referred to Walt Schwink (492-8639).

Page 1 cf 1-

-Date: January 8,.1986 SUMARY OF CRGR ACTIVITIES (November 1 through December 31,1985)

Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation Date)

Agenda Status' to EDO EDO Action 83 Review, Proposed Rulemaking Complete CRGR recommended that the pro-No action necessary at 11/27/85 (10 CFR 30, 40 A 70) Emergency posed rule be approved for this time because RES Preparedness for Fuel Cycle consideration by the Commission.

has not yet taken a and Other Radioactive Material position on the CRGR Licenses recommendation.

-Sponsoring Office - RES

-Category 2 Item

-Issue #130 Review, Proposed Rev. 3 to Complete CRGR recommended that the No action necessary at this time because RES RG 1.63, Electric Penetration proposed RG be issued for

~

Assen611es~in Containment public comment after modifi-has not yet taken a Structures for Nuclear Power cation to reflect comments by position on the CRGR Plants CRGR.

recommendation.

-Sponsoring Office - RES

-Category 2 Item

-Issue #131 Review, Proposed Closeout Complete CRGR recommended that the No action necessary at Actions for Resolving Generic staff move forward with this time because NRR Issue B-19, Thermal Hydraulic _

issuance of generic letters has not yet taken a Stability for BWRs addressing the closeout of position on the CRGR B-19 and B_59.

recommendation.

-Sponsoring Office - NRR

-Category 2 Item

-Issue #132

.