ML20148J287: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
w | w L | ||
9 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-29 YANKEE ATOMIC ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE c | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-29 YANKEE ATOMIC ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE c | |||
The U.S. Nuclear Regulatory Commission (the Commission) has issued - | The U.S. Nuclear Regulatory Commission (the Commission) has issued - | ||
Amendment No. 37 to Facility Operating License No. DPR-3, issued to Yankee Atomic Electric Company'(the licensee), which_ revised Technical | Amendment No. 37 to Facility Operating License No. DPR-3, issued to Yankee Atomic Electric Company'(the licensee), which_ revised Technical | ||
-Specifications for operation of _ the Yankee Nuclear Power Station (Yankee-Rowe) (the facil'ity) located in Rowe, Franklin County, Massachusetts. | |||
The amendment is effective as of its date of issuance. | The amendment is effective as of its date of issuance. | ||
T;.a' amendment relates to extending the Yankee-Rowe Technical Specifi-cation burnup dependent figures from the present limit of 389 effective full power days (EFPD) to 500 (EFPD). | T;.a' amendment relates to extending the Yankee-Rowe Technical Specifi-cation burnup dependent figures from the present limit of 389 effective full power days (EFPD) to 500 (EFPD). | ||
The application for the amendment complies with the standads and requirements of the Atomic Energy Act of 1954, as amended (the Act), and | The application for the amendment complies with the standads and requirements of the Atomic Energy Act of 1954, as amended (the Act), and r | ||
public notice of this amendment was not required since the amendment does not involve a significant hazards consideraiton. | the Comission's rules and regulations. | ||
The Comission has determined that the issuance of this amendment | The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. | ||
will' not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmenal impact statement or negative declaration 8011240b h | Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideraiton. | ||
The Comission has determined that the issuance of this amendment will' not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmenal impact statement or negative declaration 8011240b h | |||
I!:; | |||
.(. | |||
2 -- | 'l' 2 -- | ||
I and environmental impact appraisal need not be prepared in connection | I and environmental impact appraisal need not be prepared in connection | ||
- with issuance of thistamendment. | |||
For further details with respect to this action, see (1) the | For further details with respect to this action, see (1) the | ||
. application for amendment' dated March 2,1977, - (2) Amendment No.137 to license No. DPR-3, and (3) the Commission's related Safety Evaluation. | |||
. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street,,NW., Washington, D.C. and at the Greenfield Public Library, 422 Main Street, Greenfield, Massachusetts 01581. | |||
to the U.S. Nuclear Regulatory Commission, Washinton, D.C. | ALcopy of items (2) and (3) may be obtained upon request addressed ' | ||
to the U.S. Nuclear Regulatory Commission, Washinton, D.C. | |||
: 20555, Attention: | |||
Director, Division of 0perating Reactors. | |||
Dated at Bethesda, Maryland, this 31st day of March 1977. | Dated at Bethesda, Maryland, this 31st day of March 1977. | ||
FOR THE NUCLEAR REGULATORY COMMISSION | FOR THE NUCLEAR REGULATORY COMMISSION | ||
)? o,. | |||
A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors | 1kwdMSt.- | ||
A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors i | |||
<] | |||
-e- | |||
..v, e - | |||
.r., | |||
, - - - - -. - - - - - - - -.. - - - - - - -}} | |||
Latest revision as of 11:23, 11 December 2024
| ML20148J287 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 03/31/1977 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20148J264 | List: |
| References | |
| NUDOCS 8011210670 | |
| Download: ML20148J287 (2) | |
Text
-
w L
9 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-29 YANKEE ATOMIC ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE c
The U.S. Nuclear Regulatory Commission (the Commission) has issued -
Amendment No. 37 to Facility Operating License No. DPR-3, issued to Yankee Atomic Electric Company'(the licensee), which_ revised Technical
-Specifications for operation of _ the Yankee Nuclear Power Station (Yankee-Rowe) (the facil'ity) located in Rowe, Franklin County, Massachusetts.
The amendment is effective as of its date of issuance.
T;.a' amendment relates to extending the Yankee-Rowe Technical Specifi-cation burnup dependent figures from the present limit of 389 effective full power days (EFPD) to 500 (EFPD).
The application for the amendment complies with the standads and requirements of the Atomic Energy Act of 1954, as amended (the Act), and r
the Comission's rules and regulations.
The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideraiton.
The Comission has determined that the issuance of this amendment will' not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmenal impact statement or negative declaration 8011240b h
I!:;
.(.
'l' 2 --
I and environmental impact appraisal need not be prepared in connection
- with issuance of thistamendment.
For further details with respect to this action, see (1) the
. application for amendment' dated March 2,1977, - (2) Amendment No.137 to license No. DPR-3, and (3) the Commission's related Safety Evaluation.
. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street,,NW., Washington, D.C. and at the Greenfield Public Library, 422 Main Street, Greenfield, Massachusetts 01581.
ALcopy of items (2) and (3) may be obtained upon request addressed '
to the U.S. Nuclear Regulatory Commission, Washinton, D.C.
- 20555, Attention:
Director, Division of 0perating Reactors.
Dated at Bethesda, Maryland, this 31st day of March 1977.
FOR THE NUCLEAR REGULATORY COMMISSION
)? o,.
1kwdMSt.-
A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors i
<]
-e-
..v, e -
.r.,
, - - - - -. - - - - - - - -.. - - - - - - -