                                      Decenber 5,1996
6
        Georgia Power Com)any
Decenber 5,1996
        ATTN: Mr. C. K. icCoy .
Georgia Power Com)any
                Vice President
ATTN: Mr. C. K.
        Vogtle Electric Generating Plant
icCoy .
Vice President
Vogtle Electric Generating Plant
P. O. Box 1295
4
4
        P. O. Box 1295
Birmingham, AL 35201
        Birmingham, AL 35201
SUBJECT:
        SUBJECT:     NRC INTEGRATED INSPECTION REPORT 50-424/96-11, 50-425/96-11 AND
NRC INTEGRATED INSPECTION REPORT 50-424/96-11, 50-425/96-11 AND
                      NOTICE OF VIOLATION
NOTICE OF VIOLATION
        Dear Mr. McCoy:
Dear Mr. McCoy:
        On November 9, 1996, the NRC completed an inspection at your Vogtle Units 1             l
On November 9, 1996, the NRC completed an inspection at your Vogtle Units 1
        and 2 reactor facilities. The enclosed report presents the results of that
and 2 reactor facilities. The enclosed report presents the results of that
        inspection.
inspection.
        During the six-week period covered by this inspection report, your conduct of
During the six-week period covered by this inspection report, your conduct of
        activities at the Vogtle facility was generally characterized by safety-
activities at the Vogtle facility was generally characterized by safety-
        conscious operations, sound engineering and maintenance practices and
conscious operations, sound engineering and maintenance practices and
        appropriate radiological work controls. However, two violations were
appropriate radiological work controls.
        identified. We are particularly concerned with the violation regarding the
However, two violations were
        inadequately performed containment exit inspection involving Unit 2. Based on
identified. We are particularly concerned with the violation regarding the
        the quantity of debris removed from inside containment and the results of your
inadequately performed containment exit inspection involving Unit 2.
        engineering evaluation it was determined that residual heat removal train B
Based on
        would have been ino)erable in the event of an accident. Further, loose debris
the quantity of debris removed from inside containment and the results of your
        in containment has ]een the subject of previout NRC findings documented in NRC
engineering evaluation it was determined that residual heat removal train B
        inspection reports 94-25, 96-02, and 96-05.
would have been ino)erable in the event of an accident.
        You are required to respond to this letter and should follow the instructions
Further, loose debris
        specified in the enclosed Notice when preparing your response. The NRC will
in containment has ]een the subject of previout NRC findings documented in NRC
        use your response, in part, to determine whether further enforcement action is
inspection reports 94-25, 96-02, and 96-05.
        necessary.to ensure compliance with regulatory requirements.
You are required to respond to this letter and should follow the instructions
        In addition one apparent violation was identified and is being considered for
specified in the enclosed Notice when preparing your response.
        escalated enforcement action in accordance with the " General Statement of
The NRC will
        Policy and Procedure for NRC Enforcement Actions" (Enforcement PolicyL
use your response, in part, to determine whether further enforcement action is
        NUREG-1600.   This involved the Unit 1 safety injection ) ump train B motor
necessary.to ensure compliance with regulatory requirements.
        cooler maintenance.   The lack of specific guidance in t1e maintenance work
In addition one apparent violation was identified and is being considered for
        instruction resulted in the loss of that pump's intended safety function.
escalated enforcement action in accordance with the " General Statement of
        Accordingly, no Notice of Violation is presently being issued for these
Policy and Procedure for NRC Enforcement Actions" (Enforcement PolicyL
        inspection findings. In addition, please be advised that the number and
NUREG-1600.
        characterization of apparent violations described in the enclosed inspection
This involved the Unit 1 safety injection ) ump train B motor
        report may change as a result of further NRC review.
cooler maintenance.
        A predecisional enforcement conferr ce to discuss this apparent violation has
The lack of specific guidance in t1e maintenance work
        been scheduled for December 19. 1996. The decision to hold a predecisional
instruction resulted in the loss of that pump's intended safety function.
        enforcement conference does not mean that the NRC has determined that a
Accordingly, no Notice of Violation is presently being issued for these
        violation has occurred or that enforcement action will be taken. This
inspection findings.
                                                                                                l
In addition, please be advised that the number and
                                    *
characterization of apparent violations described in the enclosed inspection
      9612170274 961205
report may change as a result of further NRC review.
      PDR   ADOCK 05000424                                                           \
A predecisional enforcement conferr ce to discuss this apparent violation has
      o                   PDR                                                     \   \
been scheduled for December 19. 1996.
                                                                                          g CI J
The decision to hold a predecisional
enforcement conference does not mean that the NRC has determined that a
violation has occurred or that enforcement action will be taken.
This
*
9612170274 961205
PDR
ADOCK 05000424
\\
o
PDR
\\
\\
g CI J


                                                                  _- _     _ _
_- _
    e
_
  .       .
_
e
.
.
.
.
GPC
2
conference is being held to obtain information to enable the NRC to make an
i
enforcement decision, such as a common understanding of the facts, root
causes, missed opportunities to identify the apparent violation sooner.
corrective actions, significance of the issues and the need for lasting and
effective corrective action.
In addition, this is an opportunity for you to
point out any errors in our inspection report and for you to provide any
information concerning your perspectives on 1) the severity of the violation,
2) the application of the factors that the NRC considers when it determines
the amount of a civil penalty that may be assessed in accordance with Section
VI.B.2 of the Enforcement Policy, and 3) any other application of the
Enforcement Policy to this case, including the exercise of discretion in
accordance with Section VII.
This conference will be open to public
observation in accordance with the Commission's continuing trial program as
discussed in the enclosed excerpt from the Enforcement Policy (Enclosure 3).
Although not required, we encourage you to provide your comments on how you
believe holding this conference open to Jublic observation affected your
presentation and your communications wit 1 the NRC.
You will be advised by separate correspondence of the results of our
j
deliberations on this matter.
No response regarding the apparent violation is
'
required at this time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter, its enclosures, and your response will be placed n the NRC Public
Document Room (PDR).
Sincerely.
(Original signed by Pierce H. Skinner)
Pierce H. Skinner, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50-424 and 50-425
License No. NPF-68 and NPF-81
Enclosures: 1.
Notice of Violation
2.
Inspection Report 50-424/96-11, 50-425/96-11
3.
Enforcement Policy
cc w/encls:
J. D. Woodard
Senior Vice President
Georgia Power Company
P. O. Box 1295
Birmingham. AL 35201
cc w/encls cont'd:
(See Page 3)
.
.
      .
        GPC                                        2
        conference is being held to obtain information to enable the NRC to make an                i
        enforcement decision, such as a common understanding of the facts, root
        causes, missed opportunities to identify the apparent violation sooner.
        corrective actions, significance of the issues and the need for lasting and
        effective corrective action. In addition, this is an opportunity for you to
        point out any errors in our inspection report and for you to provide any
        information concerning your perspectives on 1) the severity of the violation,
        2) the application of the factors that the NRC considers when it determines
        the amount of a civil penalty that may be assessed in accordance with Section
        VI.B.2 of the Enforcement Policy, and 3) any other application of the
        Enforcement Policy to this case, including the exercise of discretion in
        accordance with Section VII. This conference will be open to public
        observation in accordance with the Commission's continuing trial program as
        discussed in the enclosed excerpt from the Enforcement Policy (Enclosure 3).
        Although not required, we encourage you to provide your comments on how you
        believe holding this conference open to Jublic observation affected your
        presentation and your communications wit 1 the NRC.
        You will be advised by separate correspondence of the results of our                        j
        deliberations on this matter. No response regarding the apparent violation is                '
        required at this time.
        In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
        this letter, its enclosures, and your response will be placed n the NRC Public
        Document Room (PDR).
                                                            Sincerely.
                                                            (Original signed by Pierce H. Skinner)
                                                            Pierce H. Skinner, Chief
                                                            Reactor Projects Branch 2
                                                            Division of Reactor Projects
        Docket Nos. 50-424 and 50-425
        License No. NPF-68 and NPF-81
        Enclosures: 1.    Notice of Violation
                      2.  Inspection Report 50-424/96-11, 50-425/96-11
                      3.  Enforcement Policy
        cc w/encls:
        J. D. Woodard
        Senior Vice President
        Georgia Power Company
        P. O. Box 1295
        Birmingham. AL 35201
        cc w/encls cont'd:      (See Page 3)
                          .


            . . -. - - - - - - - . - ... - - .. -                                       _.   _ . - - .- - _ .- - .
. . -. - - - - - - - . - ... - - .. -
                                                                                                                                      .
_.
_ . - - .- - _ .- - .
.
.
;             _.
.
          *                         .
;
f.                                                                                                                                    .
_.
i                                                                                                                                     I
f.
                          .
*
                                                                                                                                      !
.
                                                                                                                                      ~
.
;
I
i
.
!
;
~
#
#
                              GPC                                                     3                                             i
GPC
3
i
I
I
"                                                                                                                                     !
!
                              cc w/encls: Continued                                                                                 .
"
.                              J, B. Beasley                                                                                         l
cc w/encls:
                              General Manager, Plant Vogtle                                                                         ,
Continued
;                             Georgia Power Company                                                                                 i
J, B. Beasley
                                P. O. Box 1600                                                                                       t
.
;                             Waynesboro, GA 30830                                                                                   ;
l
                                                                                                                                      I
.
                                                                                                                                      '
General Manager, Plant Vogtle
                              J. A. Bailey                                                                                           '
,
;                             Manager-Licensing
;
5                              Georgia Power Company
Georgia Power Company
                                P. O. Box 1295
i
-                              Birmingham, AL 35201                                                                                   l
P. O. Box 1600
;                                                                                                                                     i
t
;
Waynesboro, GA 30830
;
I
'
J. A. Bailey
;
Manager-Licensing
'
Georgia Power Company
5
P. O. Box 1295
Birmingham, AL 35201
-
;
i
4
4
                              Jim Hurt, Director                                                                                     i
Jim Hurt, Director
!                             Consumers' Utility Counsel Division                                                                     l
i
;                              Governor's Office of Consumer Affairs
!
j                               2 M. L. King, Jr. Drive
Consumers' Utility Counsel Division
i                               Plaza Level - East: Suite 356
Governor's Office of Consumer Affairs
                              Atlanta, GA 30334-4600
;
j
2 M. L. King, Jr. Drive
i
Plaza Level - East: Suite 356
[
[
Atlanta, GA 30334-4600
-
Office of Planning and Budget
.
.
'
Room 615B
  -
'
                              Office of Planning and Budget
;
                                Room 615B
270. Washington Street, SW
;                               270. Washington Street, SW
!
!                             Atlanta, GA 30334
Atlanta, GA 30334
i
!
Office of the County Commissioner
Burke County Commission
,
i
i
!                              Office of the County Commissioner
l
,                              Burke County Commission                                                                                i
Waynesboro, GA 30830
l                              Waynesboro, GA 30830                                                                                   I
:
Harold Reheis, Director
:
:
:                              Harold Reheis, Director
i
i                              Department'of Natural Resources
Department'of Natural Resources
l                               205 Butler Street, SE, Suite 1252
l
i                             Atlanta, GA 30334                                                                                     j
205 Butler Street, SE, Suite 1252
i
Atlanta, GA 30334
j
'
'
                              Thomas Hill, Manager
Thomas Hill, Manager
:                               Radioactive Materials Program
:
                                Department of Natural Resources
Radioactive Materials Program
                              4244 International Parkway
Department of Natural Resources
l                               Suite 114
4244 International Parkway
;                             Atlanta, GA 30354
l
;                             Attorney. General
Suite 114
:                               Law Department-
;
Atlanta, GA 30354
;
Attorney. General
:
Law Department-
132 Judicial Building
,
,
                                132 Judicial Building                                                                                  l
Atlanta, GA 30334
,
,
                              Atlanta, GA 30334                                                                                        ,
2
2
                                                                                                                                      ;
,
;
1
1
                                cc w/encls cont'd:           (See Page 4)                                                             !
cc w/encls cont'd:
:
(See Page 4)
!
:
1
1
                                                                                                                                        l
I
I
                                                                                                                                      I
$
$
i
i
    . - - , . - - . . ,       ,                 . . ~ . . ,   -,. . , . . , . . - - .     --     .       .-.=- - - .- - .-.
. - - , . - - . . ,
                                                                                                                                  .
,
                                                                                                                              . - - .
. . ~ . .
,
-,. . , . . , . .
- - .
--
.
.-.=- - - .- - .-.
. - - .
.


        . . _ _ _ _ . _ .. _ _ . _ _ _ .- _ _ -_ _ . _ . _ _ _. _ _ _ _ _ _ .
. . _ _ _ _ . _ .. _ _ . _ _ _ .- _ _ -_ _ . _ . _ _ _. _ _ _ _ _ _ .
      . .
. .
                                                                                                                                                ,
,
    *                         .                                                                                                                !
*
  ,
                    ,
                                                                                                                                                l
.
.
,
.
,
i
i
i                         GPC                                                                     4
i
l-                                                                                                                                             ,
GPC
;                         cc w/encls:               Continued                                                                                 ,
4
l                       . Thomas P. Mozingo                               .
l-
                                                                                                                                                '
,
j                         Manager of Nuclear Operations                                                                                       i
;
:                          Oglethor)e Power Corporation                                                                                         '
cc w/encls:
                          2100 E. Exchange Place                                                                                               ;
Continued
!                         Tucker, GA 30085-1349
l
!                                                                                                                                              !
. Thomas P. Mozingo
                                                                                                                                                ,
.
,
'
j
Manager of Nuclear Operations
i
Oglethor)e Power Corporation
:
'
2100 E.
Exchange Place
!
Tucker, GA 30085-1349
!
,
a
a
                                                                                                                                                i
i
Charles A. Patrizia. Esq.
:
:
                          Charles A. Patrizia. Esq.                                                                                            I
i
i                          Paul. Hastings, Janofsky & Walker                                                                                   '
Paul. Hastings, Janofsky & Walker
                          10th Floor
'
                          1299 Pennsylvania Avenue
10th Floor
1299 Pennsylvania Avenue
L
L
Washington, D. C.
20004-9500
'l
'l
                          Washington, D. C. 20004-9500
'
'
                          Steven M.. Jackson
Steven M.. Jackson
l                         Senior Engineer - Power Supply
l
                          Municipal Electric Authority                                                                                         l
Senior Engineer - Power Supply
l
Municipal Electric Authority
;
of Georgia
3
1470 Riveredge Parkway NW
:
Atlanta, GA _30328-4684
,
J-
Distribution w/encls:
i
P. Skinner. RII
R. Wright. RII
W. P. Kleinsorge, RII-
.
)
M. E. Ernstes, RII
G. Hallstrom, RII
L. Wheeler, NRR
PUBLIC
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro, GA 30830
l
l
;                              of Georgia
O
3                          1470 Riveredge Parkway NW
err hdd
:                        Atlanta, GA _30328-4684                                                                                              ,
orrier
J-                        Distribution w/encls:
pri opd
i                          P. Skinner. RII
pir ope
                          R. Wright. RII
air opp
                          W. P. Kleinsorge, RII-
ort-opp
                                                                                                                                                .
pir.one
                                                                                                                                                )
stGNATURE
                          M. E. Ernstes, RII
[(
                          G. Hallstrom, RII
b\\
                          L. Wheeler, NRR
'
                          PUBLIC
Ncowar
                          NRC Senior Resident Inspector
4.n
                          U.S. Nuclear Regulatory Commission
Mu.
                          8805 River Road
Crfght
                          Waynesboro, GA 30830                                                                                                  ;
PH$binnef
                                                                                                                                                l
<
                                                                                                                                                !
ac rrion
                                                                                                                                                l
=
                                                                                                                                          O
DATE
                                      orrier      pri opd               pir ope           air opp     ort-opp       pir.one     err hdd
12 /
                                  stGNATURE
/ 96
                                                                              '
I/96
                                                                                                            [(                           b\     l
12 / k/96
                                        =      Ncowar                 <
12 / [ / 96
                                                                        4.n               Mu.         ac rrion      Crfght       PH$binnef
12 / [ M
                                        DATE       12 /       / 96             I/96       12 / k/96   12 / [ / 96 12 / [ M M b / 96
M b / 96
                                        co m       Im           no           us     no     us     no rag       no us     (uv //nsJ     uo
co m
                                      oriIcIAc Rt e u c0FY                   lxXAftNI NAM; A: \ Vito-ll
Im
                                                                                                                                \   G
no
us
no
us
no
rag
no
us
(uv
//nsJ
uo
oriIcIAc Rt e u c0FY
lxXAftNI NAM; A: \\ Vito-ll
\\
G
}}
}}

Latest revision as of 09:36, 11 December 2024

Forwards Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109 & Notice of Violation
ML20149M531
Person / Time
Site: Vogtle  
Issue date: 12/05/1996
From: Skinner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccoy C
GEORGIA POWER CO.
Shared Package
ML20149M532 List:
References
NUDOCS 9612170274
Download: ML20149M531 (4)


See also: IR 05000424/1996011

Text

~

l

. -

.

,

6

Decenber 5,1996

Georgia Power Com)any

ATTN: Mr. C. K.

icCoy .

Vice President

Vogtle Electric Generating Plant

P. O. Box 1295

4

Birmingham, AL 35201

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-424/96-11, 50-425/96-11 AND

NOTICE OF VIOLATION

Dear Mr. McCoy:

On November 9, 1996, the NRC completed an inspection at your Vogtle Units 1

and 2 reactor facilities. The enclosed report presents the results of that

inspection.

During the six-week period covered by this inspection report, your conduct of

activities at the Vogtle facility was generally characterized by safety-

conscious operations, sound engineering and maintenance practices and

appropriate radiological work controls.

However, two violations were

identified. We are particularly concerned with the violation regarding the

inadequately performed containment exit inspection involving Unit 2.

Based on

the quantity of debris removed from inside containment and the results of your

engineering evaluation it was determined that residual heat removal train B

would have been ino)erable in the event of an accident.

Further, loose debris

in containment has ]een the subject of previout NRC findings documented in NRC

inspection reports 94-25, 96-02, and 96-05.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

The NRC will

use your response, in part, to determine whether further enforcement action is

necessary.to ensure compliance with regulatory requirements.

In addition one apparent violation was identified and is being considered for

escalated enforcement action in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions" (Enforcement PolicyL

NUREG-1600.

This involved the Unit 1 safety injection ) ump train B motor

cooler maintenance.

The lack of specific guidance in t1e maintenance work

instruction resulted in the loss of that pump's intended safety function.

Accordingly, no Notice of Violation is presently being issued for these

inspection findings.

In addition, please be advised that the number and

characterization of apparent violations described in the enclosed inspection

report may change as a result of further NRC review.

A predecisional enforcement conferr ce to discuss this apparent violation has

been scheduled for December 19. 1996.

The decision to hold a predecisional

enforcement conference does not mean that the NRC has determined that a

violation has occurred or that enforcement action will be taken.

This

9612170274 961205

PDR

ADOCK 05000424

\\

o

PDR

\\

\\

g CI J

_- _

_

_

e

.

.

.

.

GPC

2

conference is being held to obtain information to enable the NRC to make an

i

enforcement decision, such as a common understanding of the facts, root

causes, missed opportunities to identify the apparent violation sooner.

corrective actions, significance of the issues and the need for lasting and

effective corrective action.

In addition, this is an opportunity for you to

point out any errors in our inspection report and for you to provide any

information concerning your perspectives on 1) the severity of the violation,

2) the application of the factors that the NRC considers when it determines

the amount of a civil penalty that may be assessed in accordance with Section

VI.B.2 of the Enforcement Policy, and 3) any other application of the

Enforcement Policy to this case, including the exercise of discretion in

accordance with Section VII.

This conference will be open to public

observation in accordance with the Commission's continuing trial program as

discussed in the enclosed excerpt from the Enforcement Policy (Enclosure 3).

Although not required, we encourage you to provide your comments on how you

believe holding this conference open to Jublic observation affected your

presentation and your communications wit 1 the NRC.

You will be advised by separate correspondence of the results of our

j

deliberations on this matter.

No response regarding the apparent violation is

'

required at this time.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter, its enclosures, and your response will be placed n the NRC Public

Document Room (PDR).

Sincerely.

(Original signed by Pierce H. Skinner)

Pierce H. Skinner, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-424 and 50-425

License No. NPF-68 and NPF-81

Enclosures: 1.

Notice of Violation

2.

Inspection Report 50-424/96-11, 50-425/96-11

3.

Enforcement Policy

cc w/encls:

J. D. Woodard

Senior Vice President

Georgia Power Company

P. O. Box 1295

Birmingham. AL 35201

cc w/encls cont'd:

(See Page 3)

.

. . -. - - - - - - - . - ... - - .. -

_.

_ . - - .- - _ .- - .

.

.

_.

f.

.

.

I

i

.

!

~

GPC

3

i

I

!

"

cc w/encls:

Continued

J, B. Beasley

.

l

.

General Manager, Plant Vogtle

,

Georgia Power Company

i

P. O. Box 1600

t

Waynesboro, GA 30830

I

'

J. A. Bailey

Manager-Licensing

'

Georgia Power Company

5

P. O. Box 1295

Birmingham, AL 35201

-

i

4

Jim Hurt, Director

i

!

Consumers' Utility Counsel Division

Governor's Office of Consumer Affairs

j

2 M. L. King, Jr. Drive

i

Plaza Level - East: Suite 356

[

Atlanta, GA 30334-4600

-

Office of Planning and Budget

.

Room 615B

'

270. Washington Street, SW

!

Atlanta, GA 30334

i

!

Office of the County Commissioner

Burke County Commission

,

i

l

Waynesboro, GA 30830

Harold Reheis, Director

i

Department'of Natural Resources

l

205 Butler Street, SE, Suite 1252

i

Atlanta, GA 30334

j

'

Thomas Hill, Manager

Radioactive Materials Program

Department of Natural Resources

4244 International Parkway

l

Suite 114

Atlanta, GA 30354

Attorney. General

Law Department-

132 Judicial Building

,

Atlanta, GA 30334

,

2

,

1

cc w/encls cont'd:

(See Page 4)

!

1

I

$

i

. - - , . - - . . ,

,

. . ~ . .

,

-,. . , . . , . .

- - .

--

.

.-.=- - - .- - .-.

. - - .

.

. . _ _ _ _ . _ .. _ _ . _ _ _ .- _ _ -_ _ . _ . _ _ _. _ _ _ _ _ _ .

. .

,

.

,

.

,

i

i

GPC

4

l-

,

cc w/encls:

Continued

l

. Thomas P. Mozingo

.

,

'

j

Manager of Nuclear Operations

i

Oglethor)e Power Corporation

'

2100 E.

Exchange Place

!

Tucker, GA 30085-1349

!

,

a

i

Charles A. Patrizia. Esq.

i

Paul. Hastings, Janofsky & Walker

'

10th Floor

1299 Pennsylvania Avenue

L

Washington, D. C.

20004-9500

'l

'

Steven M.. Jackson

l

Senior Engineer - Power Supply

l

Municipal Electric Authority

of Georgia

3

1470 Riveredge Parkway NW

Atlanta, GA _30328-4684

,

J-

Distribution w/encls:

i

P. Skinner. RII

R. Wright. RII

W. P. Kleinsorge, RII-

.

)

M. E. Ernstes, RII

G. Hallstrom, RII

L. Wheeler, NRR

PUBLIC

NRC Senior Resident Inspector

U.S. Nuclear Regulatory Commission

8805 River Road

Waynesboro, GA 30830

l

O

err hdd

orrier

pri opd

pir ope

air opp

ort-opp

pir.one

stGNATURE

[(

b\\

'

Ncowar

4.n

Mu.

Crfght

PH$binnef

<

ac rrion

=

DATE

12 /

/ 96

I/96

12 / k/96

12 / [ / 96

12 / [ M

M b / 96

co m

Im

no

us

no

us

no

rag

no

us

(uv

//nsJ

uo

oriIcIAc Rt e u c0FY

lxXAftNI NAM; A: \\ Vito-ll

\\

G