o..' -                                                          Date:           SEP 2 91978 SeH al ~ No. :       IE:ROI: 78-10 TRANSFER OF LEAD RESPONSIBILITY 0
o..'
                  .T,0,:
Date:
B. K. Grimes, Assistant Director for Engineering and Projects, NRR
SEP 2 91978 SeH al ~ No. :
IE:ROI: 78-10 TRANSFER OF LEAD RESPONSIBILITY
.T,0,:
B. K. Grimes, Assistant Director for Engineering and Projects, NRR 0


==SUBJECT:==
==SUBJECT:==
SAFE ENDS FOR RECIRCULATION N0ZILES _
SAFE ENDS FOR RECIRCULATION N0ZILES _
RESPONSIBLE ASSISTANT DIRECTOR:   E. L. Jordan DESCRIPTION OF ITEM RE00 IRING' RESOLUTION:
RESPONSIBLE ASSISTANT DIRECTOR:
With regard to operating BWR's,1has identified five types of                              s afe ends which have been used to connect recircuTation inlet 11nes (to fEactor vessel nozzles.Four cf these types include thermal sleeves which are welded to the safe ends. The material is inconel for Type 1 safe ends and stainless steel for Types 2, 3, and 4 saf~e ends. The design of Tvoes 1 and 3 safe ends includes a crevice at the thermal sleeve to safe end joint. The design of Types 2 and 4 safe ends preciuoes the crevice at the joint,~ but does include stagnant water.*
E. L. Jordan DESCRIPTION OF ITEM RE00 IRING' RESOLUTION:
_nunne Arnold has Type 1 safe ends. All of them have cracked and one crack extendLthru_ the_ safe _end wall. The safe ends have been Mand are being rsplaced witn otners of modified design.
With regard to operating BWR's,1has identified five types ofs afe ends which have been used to connect recircuTation inlet 11nes (to fEactor vessel nozzles.Four cf these types include thermal sleeves which are welded to the safe ends. The material is inconel for Type 1 safe ends and stainless steel for Types 2, 3, and 4 saf~e ends.
Metallographic examination of the cracked safe ends is in progress'                       M-to detemine the cause of cracking. This work is being performed                           6 O, by independent laboratories under contract to the licensee and IE.
The design of Tvoes 1 and 3 safe ends includes a crevice at the thermal sleeve to safe end joint. The design of Types 2 and 4 safe ends preciuoes the crevice at the joint,~ but does include stagnant water.*
Two other units, Brunswick 1 and 2, have Type 1 safe ends. Based on preliminary metalTogr5phic resiiTts from Duane Arnold, an imediate action letter has been sent to the licensee for Brunswick specifyina
_nunne Arnold has Type 1 safe ends.
                    .y.olmet ri c namination of the safe ends in the vicinity of the .
All of them have cracked and one crack extendLthru_ the_ safe _end wall. The safe ends have been Mand are being rsplaced witn otners of modified design.
                                                            ~
Metallographic examination of the cracked safe ends is in progress' M-to detemine the cause of cracking. This work is being performed by independent laboratories under contract to the licensee and IE.
N" thermal sleeve to safe end wetos.                                   (/v Preliminary metallographic results obtained for Duan Arnold safe ends indicate that the cause of cracking may be str ss corrosion at the tip of the crevice. Nevertheless, vibration induced fatione originating from the jet pump riser may be 'a contributing factor.
6 O, Two other units, Brunswick 1 and 2, have Type 1 safe ends.
Based on preliminary metalTogr5phic resiiTts from Duane Arnold, an imediate action letter has been sent to the licensee for Brunswick specifyina
.y.olmet ri c namination of the safe ends in the vicinity of the.
N" thermal sleeve to safe end wetos.
(/v
~
Preliminary metallographic results obtained for Duan Arnold safe ends indicate that the cause of cracking may be str ss corrosion at the tip of the crevice.
Nevertheless, vibration induced fatione originating from the jet pump riser may be 'a contributing factor.
Because of the presence of crevices and stagnant water in the Type 3 design, NRR and IE do have some concern for the long term integrity l
Because of the presence of crevices and stagnant water in the Type 3 design, NRR and IE do have some concern for the long term integrity l
                      *See Enclosure for identity of safe ends at each operating plant.
*See Enclosure for identity of safe ends at each operating plant.
CONTACT:   W. J. Collins, TP 49-28180 7 7 p rc o q q 3
CONTACT:
\
W. J. Collins, TP 49-28180
\\
7 7 p rc o q q 3


l     .
l
:      ' , B. K. Grimes                                                         2             SEP 2 81978 l     -
', B. K. Grimes 2
t of these safe ends.                               Type 4 safe ends have a more complex geometry which eliminatu the crevice or locates it away from the safe end wall, but does not eliminate stagnant water.
SEP 2 81978 l
t of these safe ends.
Type 4 safe ends have a more complex geometry which eliminatu the crevice or locates it away from the safe end wall, but does not eliminate stagnant water.
For BWR's operating and under construction which have Type 1, 2, 3 or 4 safe ends, resolution is needed in the areas of inservice inspection, me.iification, and design qualification.
For BWR's operating and under construction which have Type 1, 2, 3 or 4 safe ends, resolution is needed in the areas of inservice inspection, me.iification, and design qualification.
RECOMMENDATRNS AND PROPOSED COURSE OF ACTION:
RECOMMENDATRNS AND PROPOSED COURSE OF ACTION:
1.
1.
                                                  'NRR will evaluate the basis for continued operation of affected plants including assurance that appropriate interim actions are taken.
'NRR will evaluate the basis for continued operation of affected plants including assurance that appropriate interim actions are taken.
2.
2.
NRR will evaluate on a priority basis the need for installing
NRR will evaluate on a priority basis the need for installing
                        @celeromegd on a safe end at Duane Arnold and other units.
@celeromegd on a safe end at Duane Arnold and other units.
3.
3.
IE will obtain refueling outage schedules from Type 3 plants and other plants as requested by NRR.
IE will obtain refueling outage schedules from Type 3 plants and other plants as requested by NRR.
[4'.~ 'IE wi i nfom NRR and the NRC Pipe C c
[4'.~ 'IE wi i nfom NRR and the NRC Pipe C c
              \                                   results of safe end inspections and metallographic examinations 7 q _they                                 are obtained.
\\
: 5.                               E inspect for compliance with any requirements established CONCURRENCE:
results of safe end inspections and metallographic examinations 7 q _they are obtained.
Edward L. Jordan, Assistavit Director hr                    S[LL[76 Date for Technical Programs, DROI                               IE 9
5.
e5. K. Grimes, Assistant Director                                                       j/ 7ky Date for t.:.cineering and Projecte . 10R, NRR 4
E inspect for compliance with any requirements established CONCURRENCE:
                                                            ~           * *'
hr S[LL[76 Edward L. Jordan, Assistavit Director Date for Technical Programs, DROI IE 9
n'       e   .                        .      ,
e5. K. Grimes, Assistant Director j/ 7ky Date for t.:.cineering and Projecte. 10R, NRR 4
~
n' e
e
e


                          -B. K. Grimes                     3     SEP 2 9 p l
-B. K. Grimes 3
SEP 2 9 p l


==Enclosures:==
==Enclosures:==
: 1. Recirc Inlet Nozzle Sutms:y
1.
: 2. PNO-78-163 cc:   R. S. Boyd, DPM -
Recirc Inlet Nozzle Sutms:y 2.
V. Stello, D0R D. G. Eisenhut, DDR R. W. Reid, DDR W. S. Hazelton, DDR V. S. Noonan, DDR R. W. Klecker, DDR M. B. Fairtile, DDR J. G. Davis, IE N. C. Moseley, IE H. D. Thornburg, IE J. H. Sniezek, IE G. W. Reinmuth', IE B. H. Grier, RI J. P. O'Reilly, RII J. G. Keppler, RIII           "
PNO-78-163 cc:
K. V. Seyfrit, RIV R. H. Engelken, RV K. Terney, MPA S. H. Hanauer, EDO R. J. Mattson, DSS
R. S. Boyd, DPM -
[MThao, RES                                   -
V. Stello, D0R D. G. Eisenhut, DDR R. W. Reid, DDR W. S. Hazelton, DDR V. S. Noonan, DDR R. W. Klecker, DDR M. B. Fairtile, DDR J. G. Davis, IE N. C. Moseley, IE H. D. Thornburg, IE J. H. Sniezek, IE G. W. Reinmuth', IE B. H. Grier, RI J. P. O'Reilly, RII J. G. Keppler, RIII K. V. Seyfrit, RIV R. H. Engelken, RV K. Terney, MPA S. H. Hanauer, EDO R. J. Mattson, DSS
e 1
[MThao, RES e
p .
1 p


i                       .
i i
i I
I e
*'.G" W
.'.l e
.s e,.<r..., f %:. m. a
.m,..- )
t *-- -a.
: m. w,, m...r.a.
e.w s
m.Z~I c,
a
=
v S.
T -t 9 & * - - * = =.
M. > i 1
* E
'sk t.=>.?%.f..==** ~a 7..L " an D' *"g.~
* 7*#~"'"'W '** ** * * * * * * - * ? ** *
).
A*.*.=u.a i.=.= ca 9 1 m is.
n.AA w3 5
g.
'.'*.*"":".r *)
T.'".".# T *
* L
.+.=== a &....
C= e - -*.N.., u* M
,"g* *,*;,'*, ";*
",,,;.W..,LT e a aD w
--r,-.w=>
.c.
: r. r, f.
e
e
              *'.G"
%..:r.=**=.==
                ..      W.      .'.l e
: r. w'''ve 9 e e
: m. a a .s .e, .<r. . . ,e.w
: k..v.
                                                                                                        .- .m,                          s            t *--
am
                                                                                                                          ..- )
: v. c.%"G.
f %: .                              =                                                   -a.
g y
                                                                                                                                                                    ..      m. w , , m. ..r.a. m.Z~I      v      ,  c ,
L
M. > i            S.
* _s m.C.'-
1 T -t 9 & * - - * = = ..
2.* f..t.3 *-..==v,
t .=>.?%.f.*              E ~a 7. .L'sk" an D' *"g.~
.e - *
* 7*#~"'"'W '** ** * * * * * * - * ? **
* v.
* A*        .*.=u. a .i.=.= nca.AA
re-==> v
                                                              .                      91m      w3            is .                            .==**
.,r
                                                                                                                                                                            . , <. .                  5              .                .
* 8 eat
                                                                                                                                                                                                                                                                                                      ).
,r-_.,==.-,
                                                                                                                                .                                      ..            g.
M w.
                                *)
v
              '.'*.*"":".r T.'".".# -T        * *# L            e.+. a  === aD a &. . . .              C= e - -*
.,,.,, ;,. ;,,,-m C".>.';"*
                                                                                                                        ..              .N.. , u* w      M ",,,;.W. ;;-        . ,LT ,"g*
e.*==w.m'"...".*==i. *%
                                          --r,-.w=>                      .c. r. r ,            ;  f ...
*w
e
/. e = pr g r==. t=.-
* am                    g
r=
                                                    %. .:r.=**=.==
s..k C.
                                                            -          r. w'''ve 9 e e y          k. .v.               .        v. c.%"G.
?.
_s  .: L *.*
\\ 4y
            .        -                  m* .C.'- 2.* v              f. .t .3 *- ..==v,       :
).
                                                                                                              .eM- *w.
'B.*.*"."w'".''".".*.*.
* v. re-==>
t
v .,r   .* 8, ,
*!..i.*.9.,
eat
S. T..'.3.?."" t. am...%.. ;, S e gap a
                                                                                                                                                                        . ,, ;,. ;,, ,-m         ,r-_.,==.-,
%y e
C".> .';"*               ;*                      --
.4., v. %,. r-
r ==. t=.-          r=
~ s. *s
e.*==w.m'".           .." .* ==i. *%                     *w s..k             C.         ?.     / . e4y= pr g).
,,_ A,;,,
                                                                                                                                          \
r at ag..:
                                                    'B.*.*"."w'".''".".*.*.*!..i.*.9.,
g, p.
t                                                                                                                  a        -
g.,
                                                                                                                                                                                                                    %y e r    S. T. .'.3.?."" t. am.     .      . .%. . ;,. S   . .e .gap
: a.,
                                                                                                                                                                                            .4.,~v s.
<==*w
                                                                                                                                                                                                    . %, *s
-3 g wsw w..
                                                                                                                                                                                                          . r-  ,,_ A ,;, ,
.,. e a :.' L **
at           ag . .:                         g,       p.                         .      g .,      ,,
y*r.".'L"".'.:"a
: a. ,         <==*w -3                 g wsw           w..                             . . . . ,
(.*4* / *b%) "i -,,.s
                        .,. e a : .' L **                                                                                                                                                                                                                   .
.v
                                                                                                                                                * ==== .,: g y*r.".'L"".'.:"a
**""'.*..Va-
                                                        -=            **""'.*..Va-w            #            .O.*--'""*                 ( .*4*    / *b%)        "i - ,,.s .v        .g
.O.*--'""*
                                                                                                                                                                                .e3g,,,,,,,,,.   .;,
*====.,: g
7Q c,y,q ,,,,;g ; , ,,,; ,
.g
                                                        ****                                  *: e
.e3g,,,,,,,,,.
* 9
7Q c,y,q,,,,;g
                                        "'%"".".".*."".J, s                                '..'r"".".
.w
                                                                                  .          .a.~ .C. r.. 'Ta 7.".Ts ..
-=
                                                                                                                ~~'            *                                            *
"'%"".".".*."".J,
                                                    ".* 7 *""'----%      ~%           r * *'Q.                                                         'y =.m*='l:                se g      w'% *''!".~'"".*.',
'..'r"".".
                                                                                                                                            .                        w..    . 41Q         .n. ,
*: e *
                                                                                        =~*r.L ..r4 f*.l w>         7. E e., .c...
.C. r. 'Ta 7.".Ts.
                  .t
9 s
                              't
.a.~
: y. .s-.-w ~'- .c                                 . i . (. .c >.         .        .n. . .- v. ~., r= j=           ws..
".* 7 *""' ~%
                                                                                                                                                                              .v.. .c. y>.. :.a. zmm.       ;, .
r * *'Q.
                                                                                                                                    !?      ".>.'',a*.'*      8,        @*aw P yJ Qg  ~.*            ===n e.
~~'
9'e".7.'"e
w'% *''!".~'"".*.', 'y =.m*='l:
* 9                      % V'3 . . A ; ***".'~e.~.
41Q
                                                                                  . = . -            * .                 %.
.n.,
* _                                . ,,                ..              =. t,,.. :.
se g
                                                        ,."./..:."."**."'."               .(,=/
w..
                                                                                              * **?.*,%                                               *'
f*.l w> 7. E e.,.c....L..r
                                                          .i.         .          ".!
=~*r 4
't
.t
: y. s-w ~'-.c. i. ( c >.
.n...- v. ~., r= j= w
.v...c. y>...a.
mm.
z ;,.
s..
9'e".7.'"e *
% V'3.. A ;
***".'~e.~.%. *
".>.'',a*.'* 8,
@*aw yJ ~.*
!?
P
=. t,===n e.
Qg 9
. =. -
,."./..:."."**."'."
. * **?.*,%
.i.
(,=/
O e
O e
S #I*.'.,y 9~ / e .t
I*
  ...es.=
9~
S #.'. y / e.t
...es.=
Nm
Nm


                  .                                                                              ~
~
s-                                                                                                             '
s-PRELIMINARY NOTIFICATION i
PRELIMINARY NOTIFICATION
September 14, 1978 O
                ,-                                                  .            September 14, 1978 i
PRELIMINARY NOT;FICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-163 This oreliminary notification constitutes EARLY notice of an event of POSSIELE safety or oubiic interest sien1ficance.
O          PRELIMINARY NOT;FICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-163 This oreliminary notification constitutes EARLY notice of an event of POSSIELE safety or oubiic interest sien1ficance. The information presentec is as initially receivec witncut verification or evaiuation and u casicaily ali inat is known ov IE staff on this cate.
The information presentec is as initially receivec witncut verification or evaiuation and u casicaily ali inat is known ov IE staff on this cate.
Facility:   Iowa Electric Light & Power Company, Duane Amold (DN 50-331), Palo, IA
Facility:
Iowa Electric Light & Power Company, Duane Amold (DN 50-331), Palo, IA


==Subject:==
==Subject:==
JET PUMP RISER CRACK The jet pump riser crack problem at Iowa Electric Light and Power Company's Duane Arnold facility has been previously reported by PNO-78-125 and 12EA,                       ,
JET PUMP RISER CRACK The jet pump riser crack problem at Iowa Electric Light and Power Company's Duane Arnold facility has been previously reported by PNO-78-125 and 12EA, dated June 19 and 20, 1978, respectively.
dated June 19 and 20, 1978, respectively. Metallographic samples were ._. .___
Metallographic samples were._..___
taken from the nozzles and sent to Battelle-Columbus and Southwest Research for examination. Preliminary results obtained to date indicate that the cracks are inter-granular in nature and initiate in the area of the crevice formed by the thermal sleeve and inconel transition piece.
taken from the nozzles and sent to Battelle-Columbus and Southwest Research for examination.
l' Carolina Power and Light Company's (CPLL) Brunswick Nuclear Plants i and 2 are similar in design and material fabrication to the Duane Arnold
Preliminary results obtained to date indicate that the cracks are inter-granular in nature and initiate in the area of the crevice formed by the thermal sleeve and inconel transition piece.
            .        plant. Due o the similarity, plans have been made for CP&L to concuct nondestructive examination of a selective number of nozzles for crack indications. Brunswick Unit 2 is presently shutdown, and' testing will be conducted prior to its return to power.
Carolina Power and Light Company's (CPLL) Brunswick Nuclear Plants i and l'
There is some potential for the crack' problem to exist at other similar plants. Th : probicm is currently being reviewed by the NRC staff.
2 are similar in design and material fabrication to the Duane Arnold plant.
These plants are:   Browns Ferry Units 1, 2, & 3 Dresden Units 2 & 3 Peach Bottom Units 2 & 3 ..
Due o the similarity, plans have been made for CP&L to concuct nondestructive examination of a selective number of nozzles for crack indications.
Quad Cities Uryi ts._1 & .2 __ ..
Brunswick Unit 2 is presently shutdown, and' testing will be conducted prior to its return to power.
There is some potential for the crack' problem to exist at other similar plants.
Th : probicm is currently being reviewed by the NRC staff.
These plants are:
Browns Ferry Units 1, 2, & 3 Dresden Units 2 & 3 Peach Bottom Units 2 & 3..
Quad Cities Uryi ts._1 &.2 __..


==Contact:==
==Contact:==
WCollins, IE x2BlBO           RWoodruff, IE 28180 GKlingler, IE x28180 Distribution:     Transmitted H St             b Commissioner Bradford     S. J. Chilk, SECY Chairman Hendrie                                                  C. C. Karrenerer, CA Commissioner Kennedy                  Commissioner Ahearne Comissioner Gilinsky                                             (For Distribution)
WCollins, IE x2BlBO RWoodruff, IE 28180 GKlingler, IE x28180 b
Transmitted: MNBB                      P Bida k                   J. G. Davis, IE L. V. Gossick, ED0 "
Distribution:
                                                  ~
Transmitted H St Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Karrenerer, CA Comissioner Gilinsky (For Distribution)
                                                            ,H. R.'Denton, NRR           Region T 7     Ll M S. H. Hanauer, EDO 3
P Bida k J. G. Davis, IE Transmitted:
J, 3. Fouchard, PA                     SS Bldg g - .,9.q         (p.IL) ry  gg   44:4. 'g$,
MNBB L. V. Gossick, ED0 "
N. M. Haller, MPA                     C. V. Smith, NMSS         .0. G. Abston, DIA p R. G. Ryan, OSP                                                   R. Minooue, SD H. K. Shepar, ELD
,H. R.'Denton, NRR Region T 7 Ll M
                                                ~
~
                                                                                                      %        zl_gl t'RELIMINARY NOTIFICATION
3 (p.IL) ry 44:4. 'g$
                    %l@bM         --
S. H. Hanauer, EDO J, 3. Fouchard, PA SS Bldg g -.,9.q gg N. M. Haller, MPA C. V. Smith, NMSS
d
.0. G. Abston, DIA p R. Minooue, SD%
zl_g R. G. Ryan, OSP l
H. K. Shepar, ELD
~
t'RELIMINARY NOTIFICATION d
%l@bM


I Ferry Pester Than Browns A 270* crack in ils reactor piping may have brought the Duane Arnold Nuclear Pla meltdown accident than did the renowned fire at the Browns Ferry Nuclear Plan                                                                                                     '
I Pester Than Browns Ferry A 270* crack in ils reactor piping may have brought the Duane Arnold Nuclear Pla meltdown accident than did the renowned fire at the Browns Ferry Nuclear Plan' et by David Dinsmore Comey Electric will probably spen more than Until recently, the March 22,1975, fire.
et by David Dinsmore Comey                                                                                                   Electric will probably spen more than panying photo.) As a result, the reactor                                                                                     '
panying photo.) As a result, the reactor
Until recently, the March 22,1975, fire.                                                                                  $15 million to purchase power liom at the Browns Ferry Nuclear Power Plant            was cooled down and the fuelin the re-                                 other utilities while the plant is shut                ,
$15 million to purchase power liom was cooled down and the fuelin the re-at the Browns Ferry Nuclear Power Plant actor core was removed to the spent other utilities while the plant is shut ntar Decatur, Alabama, was the closest Radiographic and ultrasonic down.The Commission's chairman.Mor.
actor core was removed to the spent ntar Decatur, Alabama, was the closest                             Radiographic and ultrasonic                           down.The Commission's chairman.Mor.                   ,
fuel po ris Van Nostrand, says he expects the i the American nuclear industry had come testing showed that, although the visible to a major accident at a civilian nuclear crack was four inches long, this crack utihty to make an " aggressive" attempt-i power plant. The fire destroyed the re-extended approximately 270 to recover repair costs from General cctor coritrol circuits, starting a "boit-
fuel po the American nuclear industry had come                                                                                    ris Van Nostrand, says he expects the i testing showed that, although the visible to a major accident at a civilian nuclear                                                                                 utihty to make an " aggressive" attempt-crack was four inches long, this crack                                                                                      i power plant. The fire destroyed the re-                                                                                   to recover repair costs from General actuatl, extended approximately 270 cctor coritrol circuits, starting a "boit-                                                                                 Electric.                                           '
: actuatl, Electric.
degree s around the circumference of off" of primary coolant in the reactor             the pipe. When the other seven recircu-The original safe ends were manutac-core. At the same time,it disabled emer
degree s around the circumference of off" of primary coolant in the reactor the pipe. When the other seven recircu-The original safe ends were manutac-core. At the same time,it disabled emer
* lation pipe safe ends were radrographed                                         tured bv Lanape Forge in Pennsylvania.
* lation pipe safe ends were radrographed tured bv Lanape Forge in Pennsylvania.
psney core coohng systems Fortunate-               and ultrasonically tested, all seven were ly, the " boil-ott" wee halted before a                                                                                   under subcontract to Chicago Bridge found to be cracked to some extent; four                               and iron, which in turn wr,s a subcon-core meltdown began?                               had significant indicahons of intermit-On June 17, 1978, however, the                                                                                       tractor to General Electric, the reacts tent cracking around their entire circum-                             manufacturer. A drawing error ca : sed Duane Arnold Energy Center in Cedar Rapids, Iowa, came closer - according               feiences                                                              machinists at Lanape to cut a groom As of this writing, all eight safe ends                         that was 3/8 of an inch too deep arouno -
psney core coohng systems Fortunate-and ultrasonically tested, all seven were under subcontract to Chicago Bridge ly, the " boil-ott" wee halted before a found to be cracked to some extent; four and iron, which in turn wr,s a subcon-core meltdown began?
to industry experts - to a " loss of-               are scheduled to be replaced by newly coolant" accident than did Browns Ferry                                                                                     each pipe. These grooves were then designed forgings being faM#Cated at in 1975. This incident has received very                                                                                   filled in with weld metal. Recoros at Coulter Steel and Forge Company m                                     Lanape, CB&l, and GE show that these little media attentiert                             Berkeley, California The plant cannot On June 17,1978, reactor operators                                                                                 repairs were approved as meeting re r De restarted before late October, and                                   Quired safety codes.                             !
had significant indicahons of intermit-tractor to General Electric, the reacts On June 17, 1978, however, the tent cracking around their entire circum-manufacturer. A drawing error ca : sed Duane Arnold Energy Center in Cedar feiences machinists at Lanape to cut a groom Rapids, Iowa, came closer - according As of this writing, all eight safe ends that was 3/8 of an inch too deep arouno -
were testing the control valves on the             .ne utility estimates that repair costs Duane Arnold Center, a 538 megawatt                                                                                              An NRC official says,"Ouite obvious.
to industry experts - to a " loss of-are scheduled to be replaced by newly each pipe. These grooves were then coolant" accident than did Browns Ferry designed forgings being faM#Cated at filled in with weld metal. Recoros at in 1975. This incident has received very Coulter Steel and Forge Company m Lanape, CB&l, and GE show that these little media attentiert Berkeley, California The plant cannot repairs were approved as meeting re r On June 17,1978, reactor operators De restarted before late October, and Quired safety codes.
boiling water reactor operated by lowa            will be about $2 million. The Iowa Com-                                 ly we werer 't aware of the repai*s, a'ic Electric Light and Power Company. Sud.             merce Commission eshmates that towa deniy because of problems wsth e(ectri-             ,, ggg ,, ,,,, ,n;, , ,,,,,,, ,, gn, ,,,,g.s first nuclear shower Wa ter spurts from cal relays sn the reactor protection sys'           pipe even after the reactor.has                 been depressursted 3
were testing the control valves on the
tem,the reactor accidentally shut down.                                                                       a                                         '
.ne utility estimates that repair costs An NRC official says,"Ouite obvious.
Only then,when an inspection of the re-                                                                     j                     ,
Duane Arnold Center, a 538 megawatt will be about $2 million. The Iowa Com-ly we werer 't aware of the repai*s, a'ic boiling water reactor operated by lowa merce Commission eshmates that towa Electric Light and Power Company. Sud.
ccior dryweit was made, was it discov-cred that a primary coolant pipe was
deniy because of problems wsth e(ectri-
                                                                                                              ; *j ,                  ,
,, ggg,,,,,,,n;,,,,,,,,,,, gn,,,,,g.s first nuclear shower Wa ter spurts from cal relays sn the reactor protection sys' pipe even after the reactor has been depressursted 3
leaking from a four-inch long crack,                                                           ,
tem,the reactor accidentally shut down.
[%                      ,,.
a Only then,when an inspection of the re-j ccior dryweit was made, was it discov-
The leaking pipe was one of eight 10-                                                   s                                  A inch diameter pipes used to transfer
; *j,
* k>h %                               o cooling water from the recirculation                                                                                           td         '% ,
cred that a primary coolant pipe was
system to the jet pumps inside the reac-
[%
* tor, The crack was located in a section f F, * *Q % \ ', ,                     -l j,'y ',8p \
leaking from a four-inch long crack, The leaking pipe was one of eight 10-A inch diameter pipes used to transfer
of the pipe known as a " safe end forg-                                                                                                       i    ,
* k>h %
: (d ing" that joins the pipe to the inlet nozzle                                                                                   N-      .f g .
s cooling water from the recirculation td o
on the reactor pressure vessel, This                                                                                           ,N         r -:,n.!
system to the jet pumps inside the reac-f F, * *Q % \\ ',,
* sale end," located near the bottom of the reactor core,is a highly undesirable                                                                       j j'/c' b , ..!'5.h[
-l j,'y ',8p \\
e
tor, The crack was located in a section of the pipe known as a " safe end forg-
                                                                                                                                                  # [, O location at which to have a pipe break. A                                                                                                           i
: (d i
                                                                                                                ;.' [. #, . , ' ' e : Dgr                 ,M r /
ing" that joins the pipe to the inlet nozzle
                                                                            .y M.'.[ 'd'y[
.f g.
          " design basis accident" analysis per-                          4       %' :.,,,, ,
N-n.!
lormed by the U.S. Nuclear Regulatory                                                                 .        .
on the reactor pressure vessel, This
                                                                                                                                                    -      F        ]
,N r -:,
Commission (NRC) states that "a com-b      ''e' s,', ,~ 7 7.*d# "I -(*
b,..!'5.h[
                                                                                                                                                          ,T D,,,," ,,"~~~"                                   $.d." /,7'(([,,',N[
* sale end," located near the bottom of
plete circumferentiat break cf one of the                           S , ,,
# [, O the reactor core,is a highly undesirable j j'/c' e
recircutation 1000 pioes" would result in                                 J,                     N          - ?2.Y the worst " loss of coolant" accident                                                                             I '',             .[,
location at which to have a pipe break. A
i possible at a boshng water reactor.'                                       #* h, U g,..g-                    ,,,
;.' [. #,., ' '
The leak continued even after the re-actor was de pressurized. (See accom-
i e : Dgr r /
                                                                                '(.
" design basis accident" analysis per-
l
.y
                                              ,                                    .-                                                                                  n
,M M.'.[ 'd'y[
]
4 F
lormed by the U.S. Nuclear Regulatory
''e' s,',,~ 7 7.*d D,,,,",,"~~~" $.d." /,7'(([,,',N[
# "I -(*
,T Commission (NRC) states that "a com-b plete circumferentiat break cf one of the recircutation 1000 pioes" would result in S,,,
- ?2.Y J,
N the worst " loss of coolant" accident I '',
.[,
possible at a boshng water reactor.'
#* h, g,.
i The leak continued even after the re-
.g-U actor was de pressurized. (See accom-
'(.
l n


          ,/ l Civil Liberties Confmred from pape 7.             less intrusive, "non-investigative safe-no one here is happy repaired parts                                                                      guard measures which would not under-were used." But an NRC inspector says                 measures would be expensive. But nu-mine the Constitutional rights of nuclear that the repairs would have met even the             clear facilities could be tumed into im-pregnable "tortresses." 11 this were the           industry employees."*
,/ l no one here is happy repaired parts Civil Liberties Confmred from pape 7.
more stringent safety codes in force to-                                                                                                    .I case, there would be no necessity of                     The ACLU position seems to be thatit day.
less intrusive, "non-investigative safe-were used." But an NRC inspector says measures would be expensive. But nu-guard measures which would not under-that the repairs would have met even the clear facilities could be tumed into im-mine the Constitutional rights of nuclear more stringent safety codes in force to-pregnable "tortresses." 11 this were the industry employees."*
Because the three companies in-                 condu,cting Surveillance in order io be               s possible to operate a major nuclear volved in fabricating the safe ends at               aware 'of potential threats; any attack             power program and still protect the ctvil could be repelled.                                 liberties of the people employed in this Duane Arnold manufactured similar fit-lings for the Brunswick Nuclear Plant                                                                     piogram. But i disagree. Only thorough naar Wilmington, North Carolina, which                                                                   investigations will protect against the is owned by Carolina Power and Lighi, "IS it better to torture a                         possibility of sabolage from within a nu-CBE has questioned whether Brunswirt                   suspected terrorist than to                         clear power plant and the loss of might not suffer the same problem as                 ]ct a City 90 Up in flames 7"                       hundreds of thousands of lives. This Du6ne Arnold. Because the safe end                                                                       situation can be described in the sa ne w:lts at Brunswick are approximately                                                                     terms used by Russell Ayres with re-Such measures would not, however, one inch thick, however, while those at                                                                   spect to a plutonium economy: To pro-
.I case, there would be no necessity of The ACLU position seems to be thatit day.
* protect against the possibility that an             lect the public it is necessary to deny Duane Amold are only '/rinch thick, the employee might smuggle in explosives               the civil liberties of a significant seg-NRC believes that Brunswick shows no                   or os orride sately devices in such a way cause for concern. Alt GE nuclear power                                                                   ment of the population.                    -
Because the three companies in-condu,cting Surveillance in order io be s possible to operate a major nuclear volved in fabricating the safe ends at aware 'of potential threats; any attack power program and still protect the ctvil Duane Arnold manufactured similar fit-could be repelled.
as to cause a reactor to melt down or a plants other than Brunswick use a differ,             waste. storage facility to disperse its cnt safe-end design from that at Duane radioactive contents over a wide area.
liberties of the people employed in this lings for the Brunswick Nuclear Plant piogram. But i disagree. Only thorough naar Wilmington, North Carolina, which "IS it better to torture a investigations will protect against the possibility of sabolage from within a nu-is owned by Carolina Power and Lighi, CBE has questioned whether Brunswirt suspected terrorist than to clear power plant and the loss of might not suffer the same problem as
Amold.                                                     in crder to protect against potential         The ACLU Calls the NRC'S But it is worth noting that, at another         sanotage from within the facility, the             security pTOpOSals GE plant, approximately two months be.               NRC recently proposed an " accession               u alar   TTling,"
]ct a City 90 Up in flames 7" hundreds of thousands of lives. This Du6ne Arnold. Because the safe end situation can be described in the sa ne w:lts at Brunswick are approximately terms used by Russell Ayres with re-Such measures would not, however, spect to a plutonium economy: To pro-one inch thick, however, while those at
fore the incident at Duane Arnofd, an un.             authorization program" tot employees at scheduled inspection conducted on                     nuclear power plants. The program April 26,1978, during the romling of                 would include " background investiga.                   Nuclear power thus represents a the Cooper Station of Nebraska Public                 tions as to character, associations, and           threat to our civit liberties as greaf as Power south of Omaha discovered indi.                 loyalty, conducted under standards and             any other this country has faced The cations of cracking on three of the recir.           specifications established by the Com-             many other drawbacks and hazards o!
* protect against the possibility that an lect the public it is necessary to deny Duane Amold are only '/rinch thick, the employee might smuggle in explosives the civil liberties of a significant seg-NRC believes that Brunswick shows no or os orride sately devices in such a way ment of the population.
culation loop pipes where the safe-end               mission." Employees would be subject-               nuclear power have become obvious is welds join the nozzles The delects                   ed to " full field background investiga'           recent years. But on civil fibertieg
cause for concern. Alt GE nuclear power as to cause a reactor to melt down or a plants other than Brunswick use a differ, waste. storage facility to disperse its cnt safe-end design from that at Duane radioactive contents over a wide area.
      'were ground out without violating mini.               tions" by the Federal Bureau of in-                 grounds alone,fiuclear power deservec mal wall thickness codes. W the NRC                   vestigation and other agencies,in which             to be abandoned.
The ACLU Calls the NRC'S Amold.
has acwpted the repairs             atisfacto.
in crder to protect against potential But it is worth noting that, at another sanotage from within the facility, the security pTOpOSals GE plant, approximately two months be.
past fellow employees, landlords, per-ry.                                                   sonal and professional acquaintances,                       ,
NRC recently proposed an " accession alar TTling,"
The NRC still does not know why the heiDhbors, and intimate personal rela-sale ends at Duane Arnold cracked,3                                                                       Footnotes tions would be interviewed.Other meth-even though the repairs made to the im.               ods of investigation being discussed               ' David D. Comey, " Nuclear Power the Uit properly machined piping met both past                 wouto 5clude psychological testing,                 mate intemat Subversion". Decemoer      $$
u fore the incident at Duane Arnofd, an un.
197 c    n add 55 oA       ic and prese'nt code requirements.                       clinical evaluation, and polygraph ex-                                           D Fortunately.neither it'e Duane Amold                                                                   .. Die sonalen Zwknge der Kemenergie ..
authorization program" tot employees at scheduled inspection conducted on nuclear power plants. The program April 26,1978, during the romling of would include " background investiga.
Nuclear power thus represents a the Cooper Station of Nebraska Public tions as to character, associations, and threat to our civit liberties as greaf as Power south of Omaha discovered indi.
loyalty, conducted under standards and any other this country has faced The cations of cracking on three of the recir.
specifications established by the Com-many other drawbacks and hazards o!
culation loop pipes where the safe-end mission." Employees would be subject-nuclear power have become obvious is welds join the nozzles The delects ed to " full field background investiga' recent years. But on civil fibertieg
'were ground out without violating mini.
tions" by the Federal Bureau of in-grounds alone,fiuclear power deservec mal wall thickness codes. W the NRC vestigation and other agencies,in which to be abandoned.
has acwpted the repairs atisfacto.
past fellow employees, landlords, per-ry.
sonal and professional acquaintances, The NRC still does not know why the heiDhbors, and intimate personal rela-sale ends at Duane Arnold cracked,3 tions would be interviewed.Other meth-Footnotes
' David D. Comey, " Nuclear Power the Uit even though the repairs made to the im.
ods of investigation being discussed mate intemat Subversion". Decemoer 19 properly machined piping met both past wouto 5clude psychological testing, c
n add 55 oA ic and prese'nt code requirements.
clinical evaluation, and polygraph ex-D Fortunately.neither it'e Duane Amold
.. Die sonalen Zwknge der Kemenergie..
aminations.
aminations.
or Cooper reactors were operating                         Mr. Shattuck,in his testimony on be-             Kernenerg,e (Frankfurt am Main. Fischer Ve' wt , the cracks were discovered. We                                                                       lag.1976) pp 122-138 half of the ACLU.said that most of these
or Cooper reactors were operating Mr. Shattuck,in his testimony on be-Kernenerg,e (Frankfurt am Main. Fischer Ve' wt, the cracks were discovered. We half of the ACLU.said that most of these lag.1976) pp 122-138
* David D Comey, "The Perlect Tro,a may not be so lucky the next time.                     proposed measures are infringements or             Horse / Buum of W Afornic Sem b                                     violations of protections now 9uaran-               June 1976. p 34.
* David D Comey, "The Perlect Tro,a may not be so lucky the next time.
Details may be found in David D Comer,             teed by the Constitution and by case                 3 Russell W. Ayres, auoted in Chicapo Da "The incident at Browns Ferry,' Not Man                                                                    News. Nov 29,1975, p 3 See atso r.
proposed measures are infringements or Horse / Buum of W Afornic Sem b
Apart. September 1975, reprinted sn. Peter            law. The NRC has estimated that more                 "Pobceng Plutonium The Cml libefUes FC Taulkner (ed ), The S, lent Bomb (N Y., Ran-         than 21,600 people will be subject to               out." Harvard C,vis R,gnts - Curs levert-dom Hm,st 1977)                                       such investigative clearances by 1985'               Law Revoew,Vol 10.No 2 (Soring 197bL t 369 40 morents may be cotained for 53:
violations of protections now 9uaran-June 1976. p 34.
* Pretsminary Salery Analysts Report. Bailly           and Mr. Shattuck characterized this General,np Star,on Nuclear 1.p 14 612.               number as " alarming / He said. "The                 trom W,itiam S Hein. loc.,1285 Main Stre a The NRC has obtained one of the cracked             proposal would set a dangerous prece-                Duffalo. NY 14209).
Details may be found in David D Comer, teed by the Constitution and by case 3 Russell W. Ayres, auoted in Chicapo Da News. Nov 29,1975, p 3 See atso r.
safe ends and sent it to Battene Memorial
"The incident at Browns Ferry,' Not Man law. The NRC has estimated that more "Pobceng Plutonium The Cml libefUes FC Apart. September 1975, reprinted sn. Peter Taulkner (ed ), The S, lent Bomb (N Y., Ran-than 21,600 people will be subject to out." Harvard C,vis R,gnts - Curs levert-dom Hm,st 1977) such investigative clearances by 1985' Law Revoew,Vol 10.No 2 (Soring 197bL t
* Russell W. Ayres Quoted so Wash 4 Laboratory in Columbus. On,o for destructive         dent by extending a security clearance               posf. Nov 17.1975.0 A24 lesting stat may reveal the cause of the                            ,
* Pretsminary Salery Analysts Report. Bailly and Mr. Shattuck characterized this 369 40 morents may be cotained for 53:
* John H F. Shattuck." Testimony of Ames cracking This testing will be an endependent         government positions to an entire indus-             Cmt Liberties Union " June B. 1978 000 check on the testing being performed for lows                                                               No RM.50J. U S Nuclear Regulato y Cc try, thereby broadly affecting the private            mission. Wasnmpen Dr v 555 Electric at Southwest Research an San Anto-           sector." He proposed that the NRC Seek n'o. T e8*s OCTOBER 191 r
General,np Star,on Nuclear 1.p 14 612.
        .- 10                               .
number as " alarming / He said. "The trom W,itiam S Hein. loc.,1285 Main Stre a The NRC has obtained one of the cracked Duffalo. NY 14209).
                                                                                                                                                              "}}
safe ends and sent it to Battene Memorial proposal would set a dangerous prece-
* Russell W. Ayres Quoted so Wash 4 Laboratory in Columbus. On,o for destructive dent by extending a security clearance posf. Nov 17.1975.0 A24
* John H F. Shattuck." Testimony of Ames lesting stat may reveal the cause of the cracking This testing will be an endependent government positions to an entire indus-Cmt Liberties Union " June B. 1978 000 check on the testing being performed for lows try, thereby broadly affecting the private No RM.50J. U S Nuclear Regulato y Cc mission. Wasnmpen Dr v 555 Electric at Southwest Research an San Anto-sector." He proposed that the NRC Seek n'o. T e8*s OCTOBER 191 r
.- 10
.}}

Latest revision as of 03:21, 11 December 2024

Outlines Recommendations & Proposed Course of Action Re Results of Safe End Inspec & Metallographics Exams Relevant to Insvc Inspec, Mod & Design Qual of 4 Types of Safe Ends for Recirculation Nozzles
ML20153A897
Person / Time
Site: Duane Arnold 
Issue date: 09/29/1978
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Grimes B, Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
Shared Package
ML20064F298 List:
References
NUDOCS 7811280493
Download: ML20153A897 (4)


Text

.

+

o..'

Date:

SEP 2 91978 SeH al ~ No. :

IE:ROI: 78-10 TRANSFER OF LEAD RESPONSIBILITY

.T,0,:

B. K. Grimes, Assistant Director for Engineering and Projects, NRR 0

SUBJECT:

SAFE ENDS FOR RECIRCULATION N0ZILES _

RESPONSIBLE ASSISTANT DIRECTOR:

E. L. Jordan DESCRIPTION OF ITEM RE00 IRING' RESOLUTION:

With regard to operating BWR's,1has identified five types ofs afe ends which have been used to connect recircuTation inlet 11nes (to fEactor vessel nozzles.Four cf these types include thermal sleeves which are welded to the safe ends. The material is inconel for Type 1 safe ends and stainless steel for Types 2, 3, and 4 saf~e ends.

The design of Tvoes 1 and 3 safe ends includes a crevice at the thermal sleeve to safe end joint. The design of Types 2 and 4 safe ends preciuoes the crevice at the joint,~ but does include stagnant water.*

_nunne Arnold has Type 1 safe ends.

All of them have cracked and one crack extendLthru_ the_ safe _end wall. The safe ends have been Mand are being rsplaced witn otners of modified design.

Metallographic examination of the cracked safe ends is in progress' M-to detemine the cause of cracking. This work is being performed by independent laboratories under contract to the licensee and IE.

6 O, Two other units, Brunswick 1 and 2, have Type 1 safe ends.

Based on preliminary metalTogr5phic resiiTts from Duane Arnold, an imediate action letter has been sent to the licensee for Brunswick specifyina

.y.olmet ri c namination of the safe ends in the vicinity of the.

N" thermal sleeve to safe end wetos.

(/v

~

Preliminary metallographic results obtained for Duan Arnold safe ends indicate that the cause of cracking may be str ss corrosion at the tip of the crevice.

Nevertheless, vibration induced fatione originating from the jet pump riser may be 'a contributing factor.

Because of the presence of crevices and stagnant water in the Type 3 design, NRR and IE do have some concern for the long term integrity l

  • See Enclosure for identity of safe ends at each operating plant.

CONTACT:

W. J. Collins, TP 49-28180

\\

7 7 p rc o q q 3

l

', B. K. Grimes 2

SEP 2 81978 l

t of these safe ends.

Type 4 safe ends have a more complex geometry which eliminatu the crevice or locates it away from the safe end wall, but does not eliminate stagnant water.

For BWR's operating and under construction which have Type 1, 2, 3 or 4 safe ends, resolution is needed in the areas of inservice inspection, me.iification, and design qualification.

RECOMMENDATRNS AND PROPOSED COURSE OF ACTION:

1.

'NRR will evaluate the basis for continued operation of affected plants including assurance that appropriate interim actions are taken.

2.

NRR will evaluate on a priority basis the need for installing

@celeromegd on a safe end at Duane Arnold and other units.

3.

IE will obtain refueling outage schedules from Type 3 plants and other plants as requested by NRR.

[4'.~ 'IE wi i nfom NRR and the NRC Pipe C c

\\

results of safe end inspections and metallographic examinations 7 q _they are obtained.

5.

E inspect for compliance with any requirements established CONCURRENCE:

hr S[LL[76 Edward L. Jordan, Assistavit Director Date for Technical Programs, DROI IE 9

e5. K. Grimes, Assistant Director j/ 7ky Date for t.:.cineering and Projecte. 10R, NRR 4

~

n' e

e

-B. K. Grimes 3

SEP 2 9 p l

Enclosures:

1.

Recirc Inlet Nozzle Sutms:y 2.

PNO-78-163 cc:

R. S. Boyd, DPM -

V. Stello, D0R D. G. Eisenhut, DDR R. W. Reid, DDR W. S. Hazelton, DDR V. S. Noonan, DDR R. W. Klecker, DDR M. B. Fairtile, DDR J. G. Davis, IE N. C. Moseley, IE H. D. Thornburg, IE J. H. Sniezek, IE G. W. Reinmuth', IE B. H. Grier, RI J. P. O'Reilly, RII J. G. Keppler, RIII K. V. Seyfrit, RIV R. H. Engelken, RV K. Terney, MPA S. H. Hanauer, EDO R. J. Mattson, DSS

[MThao, RES e

1 p

i i

I e

  • '.G" W

.'.l e

.s e,.<r..., f %:. m. a

.m,..- )

t *-- -a.

m. w,, m...r.a.

e.w s

m.Z~I c,

a

=

v S.

T -t 9 & * - - * = =.

M. > i 1

  • E

'sk t.=>.?%.f..==** ~a 7..L " an D' *"g.~

  • 7*#~"'"'W '** ** * * * * * * - * ? ** *

).

A*.*.=u.a i.=.= ca 9 1 m is.

n.AA w3 5

g.

'.'*.*"":".r *)

T.'".".# T *

  • L

.+.=== a &....

C= e - -*.N.., u* M

,"g* *,*;,'*, ";*

",,,;.W..,LT e a aD w

--r,-.w=>

.c.

r. r, f.

e

%..:r.=**=.==

r. wve 9 e e
k..v.

am

v. c.%"G.

g y

L

  • _s m.C.'-

2.* f..t.3 *-..==v,

.e - *

  • v.

re-==> v

.,r

  • 8 eat

,r-_.,==.-,

M w.

v

.,,.,, ;,. ;,,,-m C".>.';"*

e.*==w.m'"...".*==i. *%

  • w

/. e = pr g r==. t=.-

r=

s..k C.

?.

\\ 4y

).

'B.*.*"."w'".".".*.*.

t

  • !..i.*.9.,

S. T..'.3.?."" t. am...%.. ;, S e gap a

%y e

.4., v. %,. r-

~ s. *s

,,_ A,;,,

r at ag..:

g, p.

g.,

a.,

<==*w

-3 g wsw w..

.,. e a :.' L **

y*r.".'L"".'.:"a

(.*4* / *b%) "i -,,.s

.v

    • ""'.*..Va-

.O.*--'""*

  • ====.,: g

.g

.e3g,,,,,,,,,.

7Q c,y,q,,,,;g

.w

-=

"'%"".".".*."".J,

'..'r"".".

  • e *

.C. r. 'Ta 7.".Ts.

9 s

.a.~

".* 7 *""' ~%

r * *'Q.

~~'

w'% *!".~'"".*.', 'y =.m*='l:

41Q

.n.,

se g

w..

f*.l w> 7. E e.,.c....L..r

=~*r 4

't

.t

y. s-w ~'-.c. i. ( c >.

.n...- v. ~., r= j= w

.v...c. y>...a.

mm.

z ;,.

s..

9'e".7.'"e *

% V'3.. A ;

      • ".'~e.~.%. *

".>.,a*.'* 8,

@*aw yJ ~.*

!?

P

=. t,===n e.

Qg 9

. =. -

,."./..:."."**."'."

. * **?.*,%

.i.

(,=/

O e

I*

9~

S #.'. y / e.t

...es.=

Nm

~

s-PRELIMINARY NOTIFICATION i

September 14, 1978 O

PRELIMINARY NOT;FICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-163 This oreliminary notification constitutes EARLY notice of an event of POSSIELE safety or oubiic interest sien1ficance.

The information presentec is as initially receivec witncut verification or evaiuation and u casicaily ali inat is known ov IE staff on this cate.

Facility:

Iowa Electric Light & Power Company, Duane Amold (DN 50-331), Palo, IA

Subject:

JET PUMP RISER CRACK The jet pump riser crack problem at Iowa Electric Light and Power Company's Duane Arnold facility has been previously reported by PNO-78-125 and 12EA, dated June 19 and 20, 1978, respectively.

Metallographic samples were._..___

taken from the nozzles and sent to Battelle-Columbus and Southwest Research for examination.

Preliminary results obtained to date indicate that the cracks are inter-granular in nature and initiate in the area of the crevice formed by the thermal sleeve and inconel transition piece.

Carolina Power and Light Company's (CPLL) Brunswick Nuclear Plants i and l'

2 are similar in design and material fabrication to the Duane Arnold plant.

Due o the similarity, plans have been made for CP&L to concuct nondestructive examination of a selective number of nozzles for crack indications.

Brunswick Unit 2 is presently shutdown, and' testing will be conducted prior to its return to power.

There is some potential for the crack' problem to exist at other similar plants.

Th : probicm is currently being reviewed by the NRC staff.

These plants are:

Browns Ferry Units 1, 2, & 3 Dresden Units 2 & 3 Peach Bottom Units 2 & 3..

Quad Cities Uryi ts._1 &.2 __..

Contact:

WCollins, IE x2BlBO RWoodruff, IE 28180 GKlingler, IE x28180 b

Distribution:

Transmitted H St Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Karrenerer, CA Comissioner Gilinsky (For Distribution)

P Bida k J. G. Davis, IE Transmitted:

MNBB L. V. Gossick, ED0 "

,H. R.'Denton, NRR Region T 7 Ll M

~

3 (p.IL) ry 44:4. 'g$

S. H. Hanauer, EDO J, 3. Fouchard, PA SS Bldg g -.,9.q gg N. M. Haller, MPA C. V. Smith, NMSS

.0. G. Abston, DIA p R. Minooue, SD%

zl_g R. G. Ryan, OSP l

H. K. Shepar, ELD

~

t'RELIMINARY NOTIFICATION d

%l@bM

I Pester Than Browns Ferry A 270* crack in ils reactor piping may have brought the Duane Arnold Nuclear Pla meltdown accident than did the renowned fire at the Browns Ferry Nuclear Plan' et by David Dinsmore Comey Electric will probably spen more than Until recently, the March 22,1975, fire.

panying photo.) As a result, the reactor

$15 million to purchase power liom was cooled down and the fuelin the re-at the Browns Ferry Nuclear Power Plant actor core was removed to the spent other utilities while the plant is shut ntar Decatur, Alabama, was the closest Radiographic and ultrasonic down.The Commission's chairman.Mor.

fuel po ris Van Nostrand, says he expects the i the American nuclear industry had come testing showed that, although the visible to a major accident at a civilian nuclear crack was four inches long, this crack utihty to make an " aggressive" attempt-i power plant. The fire destroyed the re-extended approximately 270 to recover repair costs from General cctor coritrol circuits, starting a "boit-

actuatl, Electric.

degree s around the circumference of off" of primary coolant in the reactor the pipe. When the other seven recircu-The original safe ends were manutac-core. At the same time,it disabled emer

psney core coohng systems Fortunate-and ultrasonically tested, all seven were under subcontract to Chicago Bridge ly, the " boil-ott" wee halted before a found to be cracked to some extent; four and iron, which in turn wr,s a subcon-core meltdown began?

had significant indicahons of intermit-tractor to General Electric, the reacts On June 17, 1978, however, the tent cracking around their entire circum-manufacturer. A drawing error ca : sed Duane Arnold Energy Center in Cedar feiences machinists at Lanape to cut a groom Rapids, Iowa, came closer - according As of this writing, all eight safe ends that was 3/8 of an inch too deep arouno -

to industry experts - to a " loss of-are scheduled to be replaced by newly each pipe. These grooves were then coolant" accident than did Browns Ferry designed forgings being faM#Cated at filled in with weld metal. Recoros at in 1975. This incident has received very Coulter Steel and Forge Company m Lanape, CB&l, and GE show that these little media attentiert Berkeley, California The plant cannot repairs were approved as meeting re r On June 17,1978, reactor operators De restarted before late October, and Quired safety codes.

were testing the control valves on the

.ne utility estimates that repair costs An NRC official says,"Ouite obvious.

Duane Arnold Center, a 538 megawatt will be about $2 million. The Iowa Com-ly we werer 't aware of the repai*s, a'ic boiling water reactor operated by lowa merce Commission eshmates that towa Electric Light and Power Company. Sud.

deniy because of problems wsth e(ectri-

,, ggg,,,,,,,n;,,,,,,,,,,, gn,,,,,g.s first nuclear shower Wa ter spurts from cal relays sn the reactor protection sys' pipe even after the reactor has been depressursted 3

tem,the reactor accidentally shut down.

a Only then,when an inspection of the re-j ccior dryweit was made, was it discov-

*j,

cred that a primary coolant pipe was

[%

leaking from a four-inch long crack, The leaking pipe was one of eight 10-A inch diameter pipes used to transfer

  • k>h %

s cooling water from the recirculation td o

system to the jet pumps inside the reac-f F, * *Q % \\ ',,

-l j,'y ',8p \\

tor, The crack was located in a section of the pipe known as a " safe end forg-

(d i

ing" that joins the pipe to the inlet nozzle

.f g.

N-n.!

on the reactor pressure vessel, This

,N r -:,

b,..!'5.h[

  • sale end," located near the bottom of
  1. [, O the reactor core,is a highly undesirable j j'/c' e

location at which to have a pipe break. A

.' [. #,., ' '

i e : Dgr r /

" design basis accident" analysis per-

.y

,M M.'.[ 'd'y[

]

4 F

lormed by the U.S. Nuclear Regulatory

e' s,',,~ 7 7.*d D,,,,",,"~~~" $.d." /,7'(([,,',N[

  1. "I -(*

,T Commission (NRC) states that "a com-b plete circumferentiat break cf one of the recircutation 1000 pioes" would result in S,,,

- ?2.Y J,

N the worst " loss of coolant" accident I ,

.[,

possible at a boshng water reactor.'

    • h, g,.

i The leak continued even after the re-

.g-U actor was de pressurized. (See accom-

'(.

l n

,/ l no one here is happy repaired parts Civil Liberties Confmred from pape 7.

less intrusive, "non-investigative safe-were used." But an NRC inspector says measures would be expensive. But nu-guard measures which would not under-that the repairs would have met even the clear facilities could be tumed into im-mine the Constitutional rights of nuclear more stringent safety codes in force to-pregnable "tortresses." 11 this were the industry employees."*

.I case, there would be no necessity of The ACLU position seems to be thatit day.

Because the three companies in-condu,cting Surveillance in order io be s possible to operate a major nuclear volved in fabricating the safe ends at aware 'of potential threats; any attack power program and still protect the ctvil Duane Arnold manufactured similar fit-could be repelled.

liberties of the people employed in this lings for the Brunswick Nuclear Plant piogram. But i disagree. Only thorough naar Wilmington, North Carolina, which "IS it better to torture a investigations will protect against the possibility of sabolage from within a nu-is owned by Carolina Power and Lighi, CBE has questioned whether Brunswirt suspected terrorist than to clear power plant and the loss of might not suffer the same problem as

]ct a City 90 Up in flames 7" hundreds of thousands of lives. This Du6ne Arnold. Because the safe end situation can be described in the sa ne w:lts at Brunswick are approximately terms used by Russell Ayres with re-Such measures would not, however, spect to a plutonium economy: To pro-one inch thick, however, while those at

  • protect against the possibility that an lect the public it is necessary to deny Duane Amold are only '/rinch thick, the employee might smuggle in explosives the civil liberties of a significant seg-NRC believes that Brunswick shows no or os orride sately devices in such a way ment of the population.

cause for concern. Alt GE nuclear power as to cause a reactor to melt down or a plants other than Brunswick use a differ, waste. storage facility to disperse its cnt safe-end design from that at Duane radioactive contents over a wide area.

The ACLU Calls the NRC'S Amold.

in crder to protect against potential But it is worth noting that, at another sanotage from within the facility, the security pTOpOSals GE plant, approximately two months be.

NRC recently proposed an " accession alar TTling,"

u fore the incident at Duane Arnofd, an un.

authorization program" tot employees at scheduled inspection conducted on nuclear power plants. The program April 26,1978, during the romling of would include " background investiga.

Nuclear power thus represents a the Cooper Station of Nebraska Public tions as to character, associations, and threat to our civit liberties as greaf as Power south of Omaha discovered indi.

loyalty, conducted under standards and any other this country has faced The cations of cracking on three of the recir.

specifications established by the Com-many other drawbacks and hazards o!

culation loop pipes where the safe-end mission." Employees would be subject-nuclear power have become obvious is welds join the nozzles The delects ed to " full field background investiga' recent years. But on civil fibertieg

'were ground out without violating mini.

tions" by the Federal Bureau of in-grounds alone,fiuclear power deservec mal wall thickness codes. W the NRC vestigation and other agencies,in which to be abandoned.

has acwpted the repairs atisfacto.

past fellow employees, landlords, per-ry.

sonal and professional acquaintances, The NRC still does not know why the heiDhbors, and intimate personal rela-sale ends at Duane Arnold cracked,3 tions would be interviewed.Other meth-Footnotes

' David D. Comey, " Nuclear Power the Uit even though the repairs made to the im.

ods of investigation being discussed mate intemat Subversion". Decemoer 19 properly machined piping met both past wouto 5clude psychological testing, c

n add 55 oA ic and prese'nt code requirements.

clinical evaluation, and polygraph ex-D Fortunately.neither it'e Duane Amold

.. Die sonalen Zwknge der Kemenergie..

aminations.

or Cooper reactors were operating Mr. Shattuck,in his testimony on be-Kernenerg,e (Frankfurt am Main. Fischer Ve' wt, the cracks were discovered. We half of the ACLU.said that most of these lag.1976) pp 122-138

  • David D Comey, "The Perlect Tro,a may not be so lucky the next time.

proposed measures are infringements or Horse / Buum of W Afornic Sem b

violations of protections now 9uaran-June 1976. p 34.

Details may be found in David D Comer, teed by the Constitution and by case 3 Russell W. Ayres, auoted in Chicapo Da News. Nov 29,1975, p 3 See atso r.

"The incident at Browns Ferry,' Not Man law. The NRC has estimated that more "Pobceng Plutonium The Cml libefUes FC Apart. September 1975, reprinted sn. Peter Taulkner (ed ), The S, lent Bomb (N Y., Ran-than 21,600 people will be subject to out." Harvard C,vis R,gnts - Curs levert-dom Hm,st 1977) such investigative clearances by 1985' Law Revoew,Vol 10.No 2 (Soring 197bL t

  • Pretsminary Salery Analysts Report. Bailly and Mr. Shattuck characterized this 369 40 morents may be cotained for 53:

General,np Star,on Nuclear 1.p 14 612.

number as " alarming / He said. "The trom W,itiam S Hein. loc.,1285 Main Stre a The NRC has obtained one of the cracked Duffalo. NY 14209).

safe ends and sent it to Battene Memorial proposal would set a dangerous prece-

  • Russell W. Ayres Quoted so Wash 4 Laboratory in Columbus. On,o for destructive dent by extending a security clearance posf. Nov 17.1975.0 A24
  • John H F. Shattuck." Testimony of Ames lesting stat may reveal the cause of the cracking This testing will be an endependent government positions to an entire indus-Cmt Liberties Union " June B. 1978 000 check on the testing being performed for lows try, thereby broadly affecting the private No RM.50J. U S Nuclear Regulato y Cc mission. Wasnmpen Dr v 555 Electric at Southwest Research an San Anto-sector." He proposed that the NRC Seek n'o. T e8*s OCTOBER 191 r

.- 10

.