ML20154D497: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:- _ _   . _ .
{{#Wiki_filter:- _ _
                                                                                        .PC S February 28, 1986 EN 86-10 0FFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION                             -
.PC S February 28, 1986 EN 86-10 0FFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Commonwealth Edison Company Docket No. 50-454
Licensee: Commonwealth Edison Company Docket No. 50-454


==Subject:==
==Subject:==
PROPOSED IMPOSITION OF CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of Fifty Thousand Dollars will be issued on or about March 5,1986 to Commonwealth Edison Company.             This action is based on failure to control access to a vital area, in that a breach in the barrier existed which would have allowed unauthorized, undetected access.
PROPOSED IMPOSITION OF CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of Fifty Thousand Dollars will be issued on or about March 5,1986 to Commonwealth Edison Company.
It should be noted that the licensee has not been specifically informed of the enforcement action. The Regional Administrator has been authorized by the Director, Office of Inspection and Enforcement, to sign this action.             The schedule of issuance and notification is:
This action is based on failure to control access to a vital area, in that a breach in the barrier existed which would have allowed unauthorized, undetected access.
Mailing of Notice                                     March 5, 1986 Telephone Notification of Licensee                     March 5, 1986 A news release has been prepared and will be issued on the day after the mailing of the Notice to the licensee.     The State of Illinois will be notified.
It should be noted that the licensee has not been specifically informed of the enforcement action.
The Regional Administrator has been authorized by the Director, Office of Inspection and Enforcement, to sign this action.
The schedule of issuance and notification is:
Mailing of Notice March 5, 1986 Telephone Notification of Licensee March 5, 1986 A news release has been prepared and will be issued on the day after the mailing of the Notice to the licensee.
The State of Illinois will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
The licensee has thirty days from the date of the Notice in which to respond.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.


==Contact:==
==Contact:==
P. Robinson, IE 29583                               J. Axelrad, IE 24909 Distribution:
P. Robinson, IE 29583 J. Axelrad, IE 24909 Distribution:
H Street /036         MNBB y         Phillips/r:s7             EW Willste /]_s)f Chairman Palladino ED0                 NRR                       IE         NMSS Comm. Roberts         DED/ROGR                                 OIA         RES Comm. Asselstine       PA                                       01 Com. Bernthal         ELD                                       AE00 Comm. Zech             RM
Willste /]_s)f H Street /036 MNBB y Phillips/r:s7 EW Chairman Palladino ED0 NRR IE NMSS Comm. Roberts DED/ROGR OIA RES Comm. Asselstine PA 01 Com. Bernthal ELD AE00 Comm. Zech RM
( ACRS I SECY                   Air Rights y os     Regional Offices           MAIL CA                     SP                   RI g g RIV /o ','4'         ADM: Doc. Mgt. Br.
(
PE                                         RII aig, t RV lo : s/<     POR RIII , a PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL MARCH 5, 1986 0603060119 060220 PDR h[-06     0 Y   o I}}
ACRS I
SECY Air Rights y os Regional Offices MAIL CA SP RI g g RIV /o ','4' ADM: Doc. Mgt. Br.
PE RII aig, RV lo : s/<
POR t
RIII, a PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL MARCH 5, 1986 0603060119 060220 h[-06 0
PDR Y o I}}

Latest revision as of 01:15, 11 December 2024

EN-86-010:on 860305,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued to Util Based on Failure to Control Access to Vital Area
ML20154D497
Person / Time
Site: Byron 
Issue date: 02/28/1986
From: Axelrad J, Robinson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
EN-86-010, EN-86-10, NUDOCS 8603060119
Download: ML20154D497 (1)


Text

- _ _

.PC S February 28, 1986 EN 86-10 0FFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Commonwealth Edison Company Docket No. 50-454

Subject:

PROPOSED IMPOSITION OF CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of Fifty Thousand Dollars will be issued on or about March 5,1986 to Commonwealth Edison Company.

This action is based on failure to control access to a vital area, in that a breach in the barrier existed which would have allowed unauthorized, undetected access.

It should be noted that the licensee has not been specifically informed of the enforcement action.

The Regional Administrator has been authorized by the Director, Office of Inspection and Enforcement, to sign this action.

The schedule of issuance and notification is:

Mailing of Notice March 5, 1986 Telephone Notification of Licensee March 5, 1986 A news release has been prepared and will be issued on the day after the mailing of the Notice to the licensee.

The State of Illinois will be notified.

The licensee has thirty days from the date of the Notice in which to respond.

Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or imposed by Order.

Contact:

P. Robinson, IE 29583 J. Axelrad, IE 24909 Distribution:

Willste /]_s)f H Street /036 MNBB y Phillips/r:s7 EW Chairman Palladino ED0 NRR IE NMSS Comm. Roberts DED/ROGR OIA RES Comm. Asselstine PA 01 Com. Bernthal ELD AE00 Comm. Zech RM

(

ACRS I

SECY Air Rights y os Regional Offices MAIL CA SP RI g g RIV /o ','4' ADM: Doc. Mgt. Br.

PE RII aig, RV lo : s/<

POR t

RIII, a PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL MARCH 5, 1986 0603060119 060220 h[-06 0

PDR Y o I