{{#Wiki_filter:i 4
{{#Wiki_filter:i 4
      $VL
$VL
      'Af ouquesne umt                                                                 .. _ . .,e ,., _
'Af ouquesne umt
Nuclear Group skpIn'gport. PA 15077 0004                                           #
.. _..,e,., _
U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, DC 20555
Nuclear Group skpIn'gport. PA 15077 0004 U.
S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555


==Reference:==
==Reference:==
Beaver Valloy Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 145/1 Gentlemen:
Beaver Valloy Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 145/1 Gentlemen:
Enclosed are:
Enclosed are:
: 1.       One     (1)     original and thirty-seven (37) copie.= of an Application for Amendment to the above operating Licenses to incorporate       the chanqcs   recommended in accordance with Generic Letter 87-09         to more   cicarly define the intent and resolve         impicmentation       problems       associated       with specifications 3.0.4, 4.0.3 and 4.0.4.
1.
Th!;     change   was reviewed by the OSC and ORC and determined to be safe         and does not   involve an unreviewed safety question.
One (1) original and thirty-seven (37) copie.=
: 2.       Thirty-eight (38) copics of documents designated Attachments A,     B     and   C which   setforth the change in Technical Specifications, the safety analysis and the no significant hazards evaluation.
of an Application for Amendment to the above operating Licenses to incorporate the chanqcs recommended in accordance with Generic Letter 87-09 to more cicarly define the intent and resolve impicmentation problems associated with specifications 3.0.4, 4.0.3 and 4.0.4.
A     check in the amount of $150.00 is attached as payment of the license amendment application fee in accordance with 10 CFR 170.
Th!;
change was reviewed by the OSC and ORC and determined to be safe and does not involve an unreviewed safety question.
2.
Thirty-eight (38) copics of documents designated Attachments A,
B and C
which setforth the change in Technical Specifications, the safety analysis and the no significant hazards evaluation.
A check in the amount of $150.00 is attached as payment of the license amendment application fee in accordance with 10 CFR 170.
Very truly yours,
Very truly yours,
                                                            /   ,
/
k
,k bl
                                                              . D.
. D. SIcher
bl SIcher
[VicePresident, Nuclear cc:
[VicePresident, Nuclear cc:     Mr. J. Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator                                 4 gl Mr. P. Tam, Project Manager                                                 /I Director, Safety Evaluation & Control (VEPCC)
Mr.
Mr. T. M. Gerusky, Director BRP/ DER                                           I 31  ph 8802050107 080125                                                                 i    b PDR       ADOCK 05000334                                                     y j(C(o P                       PDR
J. Beall, Sr. Resident Inspector Mr.
                                                                                    $\50'yd a}}
W. T.
Russell, NRC Region I Administrator 4 gl Mr.
P. Tam, Project Manager
/I Director, Safety Evaluation & Control (VEPCC)
I 31 ph Mr. T. M. Gerusky, Director BRP/ DER b
8802050107 080125 PDR ADOCK 05000334 j(C(o i
y P
PDR
$\\50'yd a}}

Latest revision as of 17:34, 10 December 2024

Forwards Proposed OL Change Request 145/1 for Licenses DPR-66 & NPF-73 Clearly Defining Intent & Resolving Implementation Problems Associated W/Tech Specs 3.0.4,4.0.3 & 4.0.4.Fee Paid
ML20196A857
Person / Time
Site: Beaver Valley
Issue date: 01/25/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20196A862 List:
References
GL-87-09, GL-87-9, NUDOCS 8802050187
Download: ML20196A857 (1)


Text

i 4

$VL

'Af ouquesne umt

.. _..,e,., _

Nuclear Group skpIn'gport. PA 15077 0004 U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valloy Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 145/1 Gentlemen:

Enclosed are:

1.

One (1) original and thirty-seven (37) copie.=

of an Application for Amendment to the above operating Licenses to incorporate the chanqcs recommended in accordance with Generic Letter 87-09 to more cicarly define the intent and resolve impicmentation problems associated with specifications 3.0.4, 4.0.3 and 4.0.4.

Th!;

change was reviewed by the OSC and ORC and determined to be safe and does not involve an unreviewed safety question.

2.

Thirty-eight (38) copics of documents designated Attachments A,

B and C

which setforth the change in Technical Specifications, the safety analysis and the no significant hazards evaluation.

A check in the amount of $150.00 is attached as payment of the license amendment application fee in accordance with 10 CFR 170.

Very truly yours,

/

,k bl

. D. SIcher

[VicePresident, Nuclear cc:

Mr.

J. Beall, Sr. Resident Inspector Mr.

W. T.

Russell, NRC Region I Administrator 4 gl Mr.

P. Tam, Project Manager

/I Director, Safety Evaluation & Control (VEPCC)

I 31 ph Mr. T. M. Gerusky, Director BRP/ DER b

8802050107 080125 PDR ADOCK 05000334 j(C(o i

y P

PDR

$\\50'yd a