COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT l | |||
DOCKET NO. | |||
50-445 UNIT: | |||
CPSES 1 DATE: | |||
1/ 8/99 COMPLETED BY: | |||
Bob Reible TELEPHONE: | |||
254-897-0449 i | |||
OPERATING STATUS 1. | |||
REPORTING PERIOD: | |||
DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD: | |||
744 2. | |||
CURRENTLY AUTHORIZED POWER LEVEL (MWt): | |||
: 10. GROSS ELECTRICAL ENERGY GENERATED (ifWH) | 3411 MAX. DEPEND. CAPACITY (Mwe-Net): | ||
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) | 1150 DESIGN ELECTRICAL RATING (MWe-Net): | ||
: 12. REACTOR SERVICE FACTOR | 1150 3. | ||
: 13. REACTOR AVAILABILITY FACTOR | POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): | ||
: 14. UNIT SERVICE FACTOR | NONE i | ||
: 15. UNIT AVAILABILITY FACTOR | 4, REASON FOR RESTRICTION (IF ANY): | ||
: 16. UNIT CAPACITY FACTOR (USING MDC) | THIS MONTH YR TO DATE CUMULATIVE 5. | ||
: 17. lMIT CAPACITY FACTOR (USING DESIGN MWe) | NUM8ER OF HOURS REACTOR WAS CRITICAL 744 7.874 62.635 6. | ||
: 18. UNIT FORCED OUTAGE RATE | REACTOR RESERVE SHUTDOWN HOURS 0 | ||
0 2.632 7. | |||
HOURS GENERATOR ON LINE 744 7.874 61.959 8. | |||
UNIT RESERVE SHUTDOWN HOURS 0 | |||
0 0 | |||
9. | |||
GROSS THERMAL ENERGY GENERATED (MWH) 2.532.480 26.460.660 203.240.444 i | |||
: 10. GROSS ELECTRICAL ENERGY GENERATED (ifWH) 854.737 8.878.517 67.950.477 j | |||
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) 821.809 8.505.963 64.908.275 | |||
: 12. REACTOR SERVICE FACTOR 100.0 89.9 85.2 | |||
: 13. REACTOR AVAILABILITY FACTOR 100.0 89.9 88.8 | |||
: 14. UNIT SERVICE FACTOR 100.0 89.6 84.3 | |||
: 15. UNIT AVAILABILITY FACTOR 100.0 89.6 84.3 | |||
: 16. UNIT CAPACITY FACTOR (USING MDC) 96.2 84.4 76.8 | |||
: 17. lMIT CAPACITY FACTOR (USING DESIGN MWe) 96.2 84.4 76.8 | |||
: 18. UNIT FORCED OUTAGE RATE 0.0 0.0 3.7 l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH): | |||
: 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP: | : 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP: | ||
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
COMMERCIAL OPERATION | ACHIEVED COMMERCIAL OPERATION 900813 l | ||
l | l ESTIMATED 9901210168 990114 PDR ADOCK 05000445 L R | ||
PDR l | |||
Attachment,to TXX-99008 | Attachment,to TXX-99008 | ||
,Page 2'of 8 4 | ,Page 2'of 8 4 | ||
AVERAGE dally UNIT POWER LEVEL DOCKET NO..: | AVERAGE dally UNIT POWER LEVEL DOCKET NO..: | ||
50-445 UNIT: | |||
DATE: | CPSES 1 | ||
~ | |||
3 | DATE: | ||
1/ 8/99 COMPLETED BY: | |||
Bob Reible TELEPHONE: | |||
254-897 0449 MONTH: | |||
DECMEBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) | |||
DAY (MWe-Net) 1 1106 17 1106 2 | |||
1105 18 1108 l | |||
3 1105 19 1107 4 | |||
1099 20 1107 5 | |||
1058 21 1107 6 | |||
1104 22 1107 7 | |||
1103 23 1107 8 | |||
1106 24 1107 9 | |||
1105 25 1107 10 1106 26 1107 11 1107 27 1107 12 1108 28 1105 13 1108 29 1106 14 1107 30 1107 i | |||
15 11.07 31 1107 16 1107 i | |||
I | |||
m.____ | |||
Attachn}ent,to TXX-99008 Pag 6 3 of 8 - | Attachn}ent,to TXX-99008 Pag 6 3 of 8 - | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-445 UNIT: | OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. | ||
TELEPHONE: | 50-445 UNIT: | ||
CPSES 1 | |||
DATE: | |||
01/ 8/99 COMPLETED BY: | |||
Bob Reible TELEPHONE: | |||
254-897-0449 r | |||
I r | I r | ||
i MONTH: | i MONTH: | ||
DECEMBER 1998 I | |||
t | |||
. DAY TIME REMARK / MODE l | |||
12/01 0000 Unit began the month at 100% power. | |||
I 12/31 2400 Unit ended the month at 100% power. | |||
t I | t I | ||
t | t | ||
[ | [ | ||
l i | l i | ||
I I | |||
i k | i k | ||
i I | i I | ||
| Line 78: | Line 113: | ||
l | l | ||
Attactynent to TXX-9S008 | Attactynent to TXX-9S008 Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO. | ||
Page 4 of 8 | 50-445 UNIT: | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO. | CPSES 1 | ||
DATE: | |||
1/ 8/99 COMPLETED BY: | |||
Bob Reible TELEPHONE: | |||
254-897-0449 REPORT MONTH: | |||
DECEMBER 1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE 5: SCHEDULED (HOURS) | |||
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE None 1) | |||
REASON 2) | |||
METHOD A: | |||
EQUIPMENT FAILURE (EXPLAIN) | |||
E: | |||
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: | |||
MAINT OR TEST F: | |||
ADMINISTRATIVE 2: MANUAL SCRAM C: | |||
REFUELING G: | |||
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: | |||
REGULATORY RESTRICTION H: | |||
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) f 1 | |||
m | |||
l | l Attachment to TXX-99008 | ||
.Page 5'of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.. | |||
DATE: | 50-446 UNIT: | ||
( | CPSES 2 DATE: | ||
1/ 8/99 | |||
( | |||
COMPLETED BY: | |||
l | Bob Reible TELEPHONE: | ||
254-897-0449 OPERATING STATUS 1. | |||
L | REPORTING PERIOD: | ||
THIS MONTH | DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD: | ||
744 2. | |||
CURRENTLY AUTHORIZED POWER LEVEL (MWt): | |||
3411 MAX. DEPEND. CAPACITY (MWe-Net): | |||
1150 DESIGN ELECTRICAL RATING (MWe-Net): | |||
1150 l | |||
3. | |||
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): | |||
NONE l | |||
L 4. | |||
REASON FOR RESTRICTION (IF ANY): | |||
THIS MONTH YR TO DATE CUMULATIVE t | |||
5. | |||
NUMBER OF HOURS REACTOR WAS CRITICAL 744 8.745 40.849 l | |||
6. | |||
REACTOR RESERVE SHUTDOWN HOURS 0 | |||
15 2.326 7. | |||
HOURS GENERATOR ON LINE 744 8.741 40.530 8. | |||
UNIT RESERVE SHUTDOWN HOURS 0 | |||
0 0 | |||
I 9. | |||
GROSS THERMAL ENERGY GENERATED (MWH) 2.535.523 28.761.127 131.867.01 | |||
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 865.228 9.345.296 44.534.733 1 | |||
l l | |||
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) 831.228 9.733.421 42.636,077 t- | |||
: 12. REACTOR SERVICE FACTOR 100.0 99.8 86.1 | |||
: 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 91.0 l | |||
: 14. UNIT SERVICE FACTOR 100.0 99.8 85.4 | |||
: 15. UNIT AVAILABILITY FACTOR 100.0 99.6 85.4 l | |||
l | l | ||
: | : 16. UNIT CAPACITY FACTOR (USING MDC) 97.2 92.8 78.2 | ||
-17. | |||
UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.2 92.8 78. | |||
: 18. UNIT FORCED OUTAGE RATE 0.0 0.2 4.7 | |||
: 18. UNIT FORCED OUTAGE RATE | |||
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH): | : 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH): | ||
l | l | ||
: | : 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP: | ||
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERC]AL OPERATION): | |||
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED | |||
Attachment to TXX-99008 fage6'of8 | Attachment to TXX-99008 fage6'of8 | ||
-AVERAGE DAILY UN!T POWER LEVEL DOCKET NO.- | |||
50-446 UNIT: | |||
CPSES 2 | |||
DATE: | |||
1/ 8/99 COMPLETED BY: | |||
Bob Reible TELEPHONE: | |||
254-897-0449 MONTH: | |||
DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) | |||
DAY (MWe-Net) 1 1119 17 1119 2 | |||
1119 18 1119 3 | |||
1117 19 1119 4 | |||
1117 20 1118 5 | |||
1117 21 1118 6 | |||
1117 22 1118 7 | |||
1117 23 1117 8 | |||
1117 24 1117 9 | |||
1113 25 1118 10 1110 26 1118 11 1118 27 1117 12 1118 28 1117 13 1118 29 1116 14 1118 30 1117 15 1117 31 1119 16 111/ | |||
4 | 4 | ||
I Attachment to TXX-99008 | I Attachment to TXX-99008 | ||
- faga7"of*8 | |||
==SUMMARY== | ==SUMMARY== | ||
OF DrMTING EXPERIENCE FOR THE MONTH | OF DrMTING EXPERIENCE FOR THE MONTH DOCKET NO. | ||
DOCKET NO. 50-446 | 50-446 I | ||
DATE: | UNIT: | ||
l | CPSES 2 | ||
DATE: | |||
l 12/01 | 1/ 8/99 COMPLETED BY: | ||
l 12/30 | Bob Reible i | ||
TELEPHONE: | |||
254-897-0449 l | |||
t l | |||
MONTH: | |||
DECEMBER 1998 DAY TIME REMARK / MODE t | |||
l 12/01 0000 Unit be9an the month at 100% power. | |||
l 12/30 2400 Unit ended the month 5: 100% power. | |||
i l | i l | ||
l l | l l | ||
| Line 139: | Line 231: | ||
[ | [ | ||
Attacilment to IXX-T3008 | Attacilment to IXX-T3008 Page 8 of 8 | ||
Page 8 of 8 | ~ | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS | ||
= | |||
DOCKET NO.: | DOCKET NO.: | ||
50-446 UNIT: | |||
CPSES 2 | |||
None | DATE: | ||
1/ 8/99 COMPLETED BY: | |||
Bob Reible TELEPHONE: | |||
254-897-0449 REPORT MONTH: | |||
DECEMBER 1998 j | |||
METHOD OF TYPE SHUTTING 00hH t | |||
F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) | |||
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i | |||
i None None l | |||
[ | [ | ||
l I | l I | ||
1) | |||
A: | REASON 2) | ||
METHOD | |||
[ | |||
A: | |||
EQUIPMENT FAILURE (EXPLAIN) | |||
E: | |||
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MNUAL j | |||
B: | |||
MAINT OR TEST F: | |||
ADMINISTRATIVE 2: MANUAL SCPAM C: | |||
REFUELING G: | |||
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: | |||
REGULATORY RESTRICTION H: | |||
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) | |||
J i | |||
i | i | ||
= | |||
-}} | |||
Latest revision as of 07:51, 10 December 2024
| ML20199E996 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/31/1998 |
| From: | Reible B TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20199E992 | List: |
| References | |
| NUDOCS 9901210168 | |
| Download: ML20199E996 (8) | |
Text
r l
Attachn2at to TXX-99008 l
Pa9e 1 of 8 l'
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT l
DOCKET NO.
50-445 UNIT:
CPSES 1 DATE:
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 i
OPERATING STATUS 1.
REPORTING PERIOD:
DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (Mwe-Net):
1150 DESIGN ELECTRICAL RATING (MWe-Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE i
4, REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUM8ER OF HOURS REACTOR WAS CRITICAL 744 7.874 62.635 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2.632 7.
HOURS GENERATOR ON LINE 744 7.874 61.959 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.532.480 26.460.660 203.240.444 i
- 10. GROSS ELECTRICAL ENERGY GENERATED (ifWH) 854.737 8.878.517 67.950.477 j
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 821.809 8.505.963 64.908.275
- 12. REACTOR SERVICE FACTOR 100.0 89.9 85.2
- 13. REACTOR AVAILABILITY FACTOR 100.0 89.9 88.8
- 14. UNIT SERVICE FACTOR 100.0 89.6 84.3
- 15. UNIT AVAILABILITY FACTOR 100.0 89.6 84.3
- 16. UNIT CAPACITY FACTOR (USING MDC) 96.2 84.4 76.8
- 17. lMIT CAPACITY FACTOR (USING DESIGN MWe) 96.2 84.4 76.8
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 3.7 l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 l
l ESTIMATED 9901210168 990114 PDR ADOCK 05000445 L R
PDR l
Attachment,to TXX-99008
,Page 2'of 8 4
AVERAGE dally UNIT POWER LEVEL DOCKET NO..:
50-445 UNIT:
CPSES 1
~
DATE:
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897 0449 MONTH:
DECMEBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1106 17 1106 2
1105 18 1108 l
3 1105 19 1107 4
1099 20 1107 5
1058 21 1107 6
1104 22 1107 7
1103 23 1107 8
1106 24 1107 9
1105 25 1107 10 1106 26 1107 11 1107 27 1107 12 1108 28 1105 13 1108 29 1106 14 1107 30 1107 i
15 11.07 31 1107 16 1107 i
I
m.____
Attachn}ent,to TXX-99008 Pag 6 3 of 8 -
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-445 UNIT:
CPSES 1
DATE:
01/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 r
I r
i MONTH:
DECEMBER 1998 I
t
. DAY TIME REMARK / MODE l
12/01 0000 Unit began the month at 100% power.
I 12/31 2400 Unit ended the month at 100% power.
t I
t
[
l i
I I
i k
i I
i l
l
Attactynent to TXX-9S008 Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO.
50-445 UNIT:
CPSES 1
DATE:
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 REPORT MONTH:
DECEMBER 1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE 5: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE None 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) f 1
m
l Attachment to TXX-99008
.Page 5'of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO..
50-446 UNIT:
CPSES 2 DATE:
1/ 8/99
(
COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 OPERATING STATUS 1.
REPORTING PERIOD:
DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1150 DESIGN ELECTRICAL RATING (MWe-Net):
1150 l
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE l
L 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE t
5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 8.745 40.849 l
6.
REACTOR RESERVE SHUTDOWN HOURS 0
15 2.326 7.
HOURS GENERATOR ON LINE 744 8.741 40.530 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
I 9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.535.523 28.761.127 131.867.01
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 865.228 9.345.296 44.534.733 1
l l
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 831.228 9.733.421 42.636,077 t-
- 12. REACTOR SERVICE FACTOR 100.0 99.8 86.1
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 91.0 l
- 14. UNIT SERVICE FACTOR 100.0 99.8 85.4
- 15. UNIT AVAILABILITY FACTOR 100.0 99.6 85.4 l
l
- 16. UNIT CAPACITY FACTOR (USING MDC) 97.2 92.8 78.2
-17.
UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.2 92.8 78.
- 18. UNIT FORCED OUTAGE RATE 0.0 0.2 4.7
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
l
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERC]AL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED
Attachment to TXX-99008 fage6'of8
-AVERAGE DAILY UN!T POWER LEVEL DOCKET NO.-
50-446 UNIT:
CPSES 2
DATE:
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 MONTH:
DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1119 17 1119 2
1119 18 1119 3
1117 19 1119 4
1117 20 1118 5
1117 21 1118 6
1117 22 1118 7
1117 23 1117 8
1117 24 1117 9
1113 25 1118 10 1110 26 1118 11 1118 27 1117 12 1118 28 1117 13 1118 29 1116 14 1118 30 1117 15 1117 31 1119 16 111/
4
I Attachment to TXX-99008
- faga7"of*8
SUMMARY
OF DrMTING EXPERIENCE FOR THE MONTH DOCKET NO.
50-446 I
UNIT:
CPSES 2
DATE:
1/ 8/99 COMPLETED BY:
Bob Reible i
TELEPHONE:
254-897-0449 l
t l
MONTH:
DECEMBER 1998 DAY TIME REMARK / MODE t
l 12/01 0000 Unit be9an the month at 100% power.
l 12/30 2400 Unit ended the month 5: 100% power.
i l
l l
b I
t f
i 4
i
[
Attacilment to IXX-T3008 Page 8 of 8
~
UNIT SHUTDOWNS AND POWER REDUCTIONS
=
DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 REPORT MONTH:
DECEMBER 1998 j
METHOD OF TYPE SHUTTING 00hH t
F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i
i None None l
[
l I
1)
REASON 2)
METHOD
[
A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MNUAL j
B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCPAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
J i
i
=
-