{{#Wiki_filter:r l   Attachn2at to TXX-99008                                                                                       l l    Pa9e 1 of 8                                                                                                   !
{{#Wiki_filter:r l
l'                                     COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1
Attachn2at to TXX-99008 l
                              ,                                                                                    l NRC MONTHLY OPERATING REPORT l                                                                                   DOCKET NO.       50-445       l UNIT:             CPSES 1     :
Pa9e 1 of 8 l'
DATE:            1/ 8/99 COMPLETED BY:     Bob Reible TELEPHONE:       254-897-0449 i   OPERATING STATUS
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT l
: 1. REPORTING PERIOD:       DECEMBER 1998           GROSS HOURS IN REPORTING PERIOD:             744
DOCKET NO.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):       3411     MAX. DEPEND. CAPACITY (Mwe-Net):       1150
50-445 UNIT:
* DESIGN ELECTRICAL RATING (MWe-Net):           1150
CPSES 1 DATE:
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):     NONE i
1/ 8/99 COMPLETED BY:
4,     REASON FOR RESTRICTION (IF ANY):
Bob Reible TELEPHONE:
,                                                                  THIS MONTH         YR TO DATE   CUMULATIVE
254-897-0449 i
: 5. NUM8ER OF HOURS REACTOR WAS CRITICAL                     744               7.874         62.635
OPERATING STATUS 1.
: 6. REACTOR RESERVE SHUTDOWN HOURS                           0                 0             2.632
REPORTING PERIOD:
: 7. HOURS GENERATOR ON LINE                                   744               7.874         61.959
DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD:
8. UNIT RESERVE SHUTDOWN HOURS                               0                 0             0
744 2.
: 9. GROSS THERMAL ENERGY GENERATED (MWH)                     2.532.480         26.460.660   203.240.444 i
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
: 10. GROSS ELECTRICAL ENERGY GENERATED (ifWH)                     854.737           8.878.517     67.950.477     j
3411 MAX. DEPEND. CAPACITY (Mwe-Net):
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                       821.809           8.505.963     64.908.275
1150 DESIGN ELECTRICAL RATING (MWe-Net):
: 12. REACTOR SERVICE FACTOR                                       100.0             89.9         85.2
1150 3.
: 13. REACTOR AVAILABILITY FACTOR                                 100.0             89.9         88.8           l
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
: 14. UNIT SERVICE FACTOR                                         100.0             89.6         84.3
NONE i
: 15. UNIT AVAILABILITY FACTOR                                     100.0             89.6         84.3
4, REASON FOR RESTRICTION (IF ANY):
: 16. UNIT CAPACITY FACTOR (USING MDC)                             96.2               84.4         76.8
THIS MONTH YR TO DATE CUMULATIVE 5.
: 17. lMIT CAPACITY FACTOR (USING DESIGN MWe)                     96.2               84.4         76.8
NUM8ER OF HOURS REACTOR WAS CRITICAL 744 7.874 62.635 6.
: 18. UNIT FORCED OUTAGE RATE                                     0.0               0.0           3.7 l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
REACTOR RESERVE SHUTDOWN HOURS 0
1
0 2.632 7.
HOURS GENERATOR ON LINE 744 7.874 61.959 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.532.480 26.460.660 203.240.444 i
: 10. GROSS ELECTRICAL ENERGY GENERATED (ifWH) 854.737 8.878.517 67.950.477 j
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) 821.809 8.505.963 64.908.275
: 12. REACTOR SERVICE FACTOR 100.0 89.9 85.2
: 13. REACTOR AVAILABILITY FACTOR 100.0 89.9 88.8
: 14. UNIT SERVICE FACTOR 100.0 89.6 84.3
: 15. UNIT AVAILABILITY FACTOR 100.0 89.6 84.3
: 16. UNIT CAPACITY FACTOR (USING MDC) 96.2 84.4 76.8
: 17. lMIT CAPACITY FACTOR (USING DESIGN MWe) 96.2 84.4 76.8
: 18. UNIT FORCED OUTAGE RATE 0.0 0.0 3.7 l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
: 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
: 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):           ACHIEVED l
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
COMMERCIAL OPERATION           900813 l
ACHIEVED COMMERCIAL OPERATION 900813 l
l                     ESTIMATED
l ESTIMATED 9901210168 990114 PDR ADOCK 05000445 L R
!              9901210168 990114
PDR l
!              PDR   ADOCK 05000445 L R                   PDR     _                                                                      l


Attachment,to TXX-99008
Attachment,to TXX-99008
,Page 2'of 8 4
,Page 2'of 8 4
AVERAGE dally UNIT POWER LEVEL DOCKET NO..:       50-445 UNIT:               CPSES     1
AVERAGE dally UNIT POWER LEVEL DOCKET NO..:
      ~
50-445 UNIT:
DATE:               1/ 8/99 COMPLETED BY:       Bob Reible TELEPHONE:         254-897 0449 MONTH:   DECMEBER 1998 AVERAGE DAILY POWER LEVEL                         AVERAGE DAILY POWER LEVEL DAY               (MWe-Net)                             DAY             (MWe-Net) 1                     1106                             17                   1106                   ,
CPSES 1
1 2                    1105                             18                   1108 l
~
3                     1105                             19                   1107 4                     1099                             20                   1107 5                     1058                             21                   1107 6                     1104                             22                   1107 7                     1103                             23                   1107 8                     1106                             24                   1107                   ;
DATE:
9                    1105                             25                   1107 10                   1106                             26                   1107 11                   1107                             27                   1107 12                   1108                             28                   1105 13                   1108                             29                   1106 14                   1107                             30                   1107                   ,
1/ 8/99 COMPLETED BY:
i 15                   11.07                             31                   1107                   I 16                   1107                                                                         i I
Bob Reible TELEPHONE:
254-897 0449 MONTH:
DECMEBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1106 17 1106 2
1105 18 1108 l
3 1105 19 1107 4
1099 20 1107 5
1058 21 1107 6
1104 22 1107 7
1103 23 1107 8
1106 24 1107 9
1105 25 1107 10 1106 26 1107 11 1107 27 1107 12 1108 28 1105 13 1108 29 1106 14 1107 30 1107 i
15 11.07 31 1107 16 1107 i
I


    . ..      ...        , - . _ _ .      _. _ ._ .._ .,_. ._.._ .. ._.. _ ... _. . _ _ _ ._.._.. _ . _ __ ._._. _ . .. _                            _ m .____
m.____
Attachn}ent,to TXX-99008 Pag 6 3 of 8 -
Attachn}ent,to TXX-99008 Pag 6 3 of 8 -


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-445 UNIT:         CPSES   1 DATE:         01/ 8/99 COMPLETED BY: Bob Reible             >
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
TELEPHONE:   254-897-0449 r
50-445 UNIT:
CPSES 1
DATE:
01/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 r
I r
I r
i MONTH:         DECEMBER 1998                                                                                                           I t
i MONTH:
                    . DAY                   TIME                                             REMARK / MODE                                                     -
DECEMBER 1998 I
l 12/01                 0000                                             Unit began the month at 100% power.                               I 12/31                 2400                                             Unit ended the month at 100% power.
t
. DAY TIME REMARK / MODE l
12/01 0000 Unit began the month at 100% power.
I 12/31 2400 Unit ended the month at 100% power.
t I
t I
t
t
[
[
l i                                                                                                                                                               I I
l i
I I
i k
i k
i I
i I
Line 78: Line 113:
l
l


Attactynent to TXX-9S008                                                                                                                                                                                                                                                                                                                                               -
Attactynent to TXX-9S008 Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO.
Page 4 of 8                                                                                                                                                                                                                                                                                                                                                             .
50-445 UNIT:
UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO.                                                                             50-445 UNIT:                                                                                   CPSES   1 DATE:                                                                                   1/ 8/99 COMPLETED BY:                                                                           Bob Reible TELEPHONE:                                                                             254-897-0449 REPORT MONTH:                                               DECEMBER 1998 METHOD OF TYPE                                                                                                                     SHUTTING DOWN F: FORCED                                               DURATION                                                         THE REACTOR OR NO       DATE       5: SCHEDULED                                           (HOURS)                                           REASON         REDUCING POWER                                                                               CORRECTIVE ACTIONS / COMMENTS NONE                                                                                                                                                                                                                                         None
CPSES 1
: 1)   REASON                                                                                                                                                                                                                                                                                                                           2) METHOD A:   EQUIPMENT FAILURE (EXPLAIN)                                               E:     OPERATOR TRAINING AND LICENSE EXAMINATION                                                                                                                                                                                                     1: MANUAL B:   MAINT OR TEST                                                             F:     ADMINISTRATIVE                                                                                                                                                                                                                                 2: MANUAL SCRAM C:   REFUELING                                                                 G:     OPERATIONAL ERROR (EXPLAIN)                                                                                                                                                                                                                   3: AUTOMATIC SCRAM D:   REGULATORY RESTRICTION                                                   H:     OTHER (EXPLAIN)                                                                                                                                                                                                                               4: OTHER (EXPLAIN) f 1
DATE:
_ _ . _ _ _ . . _ . _ _ _ _ _ . . _ _ . _            ____.________._____._.____________.____._____m_                      _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . _ _ _ _ _ _ _ . . _ _ _ _ _ . _ . _ . _ _ _ _ . _ _ _ _ _ _ _ _
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 REPORT MONTH:
DECEMBER 1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE 5: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE None 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) f 1
m


l   Attachment to TXX-99008
l Attachment to TXX-99008
    .Page 5'of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO..                     50-446 UNIT:                           CPSES 2               <
.Page 5'of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO..
DATE:                           1/ 8/99
50-446 UNIT:
(                                                                                             COMPLETED BY:                   Bob Reible TELEPHONE:                     254-897-0449 OPERATING STATUS
CPSES 2 DATE:
: 1. REPORTING PERIOD:       DECEMBER 1998                   GROSS HOURS IN REPORTING PERIOD:                                       744
1/ 8/99
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):             3411         MAX. DEPEND. CAPACITY (MWe-Net):                               1150
(
* DESIGN ELECTRICAL RATING (MWe-Net):                 1150                                                                               !
COMPLETED BY:
l                                                                                                                                                   .
Bob Reible TELEPHONE:
:    3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):               NONE l
254-897-0449 OPERATING STATUS 1.
L     4. REASON FOR RESTRICTION (IF ANY):                                                                                                       ,
REPORTING PERIOD:
THIS MONTH                         YR TO DATE       CUMULATIVE t
DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD:
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL                               744                                 8.745             40.849 l     6. REACTOR RESERVE SHUTDOWN HOURS                                     0                                   15                 2.326       ,
744 2.
!    7. HOURS GENERATOR ON LINE                                             744                                 8.741             40.530
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
: 8. UNIT RESERVE SHUTDOWN HOURS                                         0                                   0                 0 I     9. GROSS THERMAL ENERGY GENERATED (MWH)                               2.535.523                           28.761.127         131.867.01     !
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1150 DESIGN ELECTRICAL RATING (MWe-Net):
1150 l
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE l
L 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE t
5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 8.745 40.849 l
6.
REACTOR RESERVE SHUTDOWN HOURS 0
15 2.326 7.
HOURS GENERATOR ON LINE 744 8.741 40.530 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
I 9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.535.523 28.761.127 131.867.01
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 865.228 9.345.296 44.534.733 1
l l
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) 831.228 9.733.421 42.636,077 t-
: 12. REACTOR SERVICE FACTOR 100.0 99.8 86.1
: 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 91.0 l
: 14. UNIT SERVICE FACTOR 100.0 99.8 85.4
: 15. UNIT AVAILABILITY FACTOR 100.0 99.6 85.4 l
l
l
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                865.228                            9.345.296          44.534.733    1 l
: 16. UNIT CAPACITY FACTOR (USING MDC) 97.2 92.8 78.2
l    11. NET ELECTRICAL ENERGY GENERATED (MWH)                                  831.228                            9.733.421          42.636,077 t-
-17.
: 12. REACTOR SERVICE FACTOR                                                100.0                              99.8              86.1          ;
UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.2 92.8 78.
: 13. REACTOR AVAILABILITY FACTOR                                            100.0                              100.0              91.0 l    14. UNIT SERVICE FACTOR                                                    100.0                              99.8              85.4
: 18. UNIT FORCED OUTAGE RATE 0.0 0.2 4.7
: 15. UNIT AVAILABILITY FACTOR                                              100.0                              99.6              85.4          I l
l    16. UNIT CAPACITY FACTOR (USING MDC)                                       97.2                               92.8               78.2
    -17. UNIT CAPACITY FACTOR (USING DESIGN MWe)                             97.2                               92.8               78.
: 18. UNIT FORCED OUTAGE RATE                                               0.0                                 0.2               4.7
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
l     20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
l
:     21. UNITS IN TEST STATUS (PRIOR TO COMMERC]AL OPERATION):                       ACHIEVED COMMERCIAL OPERATION                         930803
: 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
* ESTIMATED
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERC]AL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED


Attachment to TXX-99008 fage6'of8
Attachment to TXX-99008 fage6'of8
                                        -AVERAGE DAILY UN!T POWER LEVEL DOCKET NO.-       50-446 UNIT:             CPSES   2 DATE:             1/ 8/99 COMPLETED BY:     Bob Reible TELEPHONE:       254-897-0449 MONTH:   DECEMBER 1998 AVERAGE DAILY POWER LEVEL                         AVERAGE DAILY POWER LEVEL DAY               (MWe-Net)                             DAY             (MWe-Net) 1                     1119                             17                 1119 2                     1119                             18                 1119               -
-AVERAGE DAILY UN!T POWER LEVEL DOCKET NO.-
3                    1117                             19                 1119               -
50-446 UNIT:
4                    1117                             20                 1118 5                     1117                             21                 1118 6                     1117                             22                 1118 7                     1117                             23                 1117 8                     1117                             24                 1117               -
CPSES 2
9                    1113                             25                 1118 10                   1110                             26                 1118 11                   1118                             27                 1117 12                   1118                             28                 1117 13                   1118                             29                 1116 14                   1118                             30                 1117 15                   1117                             31                 1119 16                   111/
DATE:
l I
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 MONTH:
DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1119 17 1119 2
1119 18 1119 3
1117 19 1119 4
1117 20 1118 5
1117 21 1118 6
1117 22 1118 7
1117 23 1117 8
1117 24 1117 9
1113 25 1118 10 1110 26 1118 11 1118 27 1117 12 1118 28 1117 13 1118 29 1116 14 1118 30 1117 15 1117 31 1119 16 111/
4
4


I Attachment to TXX-99008
I Attachment to TXX-99008
  - faga7"of*8
- faga7"of*8


==SUMMARY==
==SUMMARY==
OF DrMTING EXPERIENCE FOR THE MONTH I
OF DrMTING EXPERIENCE FOR THE MONTH DOCKET NO.
DOCKET NO. 50-446         I UNIT:         CPSES   2     !
50-446 I
DATE:         1/ 8/99       l COMPLETED BY: Bob Reible i                                                                   TELEPHONE:   254-897-0449   .
UNIT:
l t
CPSES 2
l              MONTH:   DECEMBER 1998 DAY         TIME               REMARK / MODE t
DATE:
l 12/01       0000               Unit be9an the month at 100% power.
1/ 8/99 COMPLETED BY:
l 12/30       2400               Unit ended the month 5: 100% power.
Bob Reible i
TELEPHONE:
254-897-0449 l
t l
MONTH:
DECEMBER 1998 DAY TIME REMARK / MODE t
l 12/01 0000 Unit be9an the month at 100% power.
l 12/30 2400 Unit ended the month 5: 100% power.
i l
i l
l l
l l
Line 139: Line 231:
[
[


Attacilment to IXX-T3008                                                                                                                                                                                                                                                                                                                               - .,
Attacilment to IXX-T3008 Page 8 of 8
Page 8 of 8       ~                                                                                                                                                                                                                                                                                                                                               '
~
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                                                                                                   .*
UNIT SHUTDOWNS AND POWER REDUCTIONS
                                                                                                                                                                                                                                                                                                                                                                      =       '
=
DOCKET NO.:                                       50-446 UNIT:                                             CPSES                                           2 DATE:                                                 1/ 8/99 COMPLETED BY:                                   Bob Reible
DOCKET NO.:
* TELEPHONE:                                       254-897-0449 REPORT MONTH:                               DECEMBER 1998                                                                                                                                                                                                                               j METHOD OF                                                                                                                                                                                                                 .
50-446 UNIT:
t TYPE                                                                                     SHUTTING 00hH F: FORCED                                         DURATION                               THE REACTOR OR NO                   DATE       S: SCHEDULED                                       (HOURS)         REASON                 REDUCING POWER                                                       CORRECTIVE ACTIONS / COMMENTS                                                                                                                     i i
CPSES 2
None                                                                                                                                                                                               None l
DATE:
1/ 8/99 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 REPORT MONTH:
DECEMBER 1998 j
METHOD OF TYPE SHUTTING 00hH t
F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i
i None None l
[
[
l I
l I
: 1)     REASON                                                                                                                                                                                                           2)                           METHOD                                                                                             [
1)
A:         EQUIPMENT FAILURE (EXPLAIN)                                                 E:   OPERATOR TRAINING AND LICENSE EXAMINATION                                                                                                           1: MNUAL                                                                                           j B:         MAINT OR TEST                                                               F:   ADMINISTRATIVE                                                                                                                                       2: MANUAL SCPAM C:         REFUELING                                                                   G:   OPERATIONAL ERROR (EXPLAIN)                                                                                                                         3: AUTOMATIC SCRAM                                                                                 :
REASON 2)
D:        REGULATORY RESTRICTION                                                     H:   OTHER (EXPLAIN)                                                                                                                                     4: OTHER (EXPLAIN)                                                                                 J i
METHOD
[
A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MNUAL j
B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCPAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
J i
i
i
                                                                                                                                                                                                                                                                                                                                                                            =
=
_ _ _ _ - . _ - . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . - - _                      _ _ - _ _ _ _              _ - - _ _ _ - _ - . _ _ . _ _ _ _ _ - _ _ - - . _ -                                    - . - _ _ _ - _ . _ _ . - _ _ _ _ - _ _ - _ _ _ - _ _ _ _ -}}
-}}

Latest revision as of 07:51, 10 December 2024

Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2
ML20199E996
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/31/1998
From: Reible B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20199E992 List:
References
NUDOCS 9901210168
Download: ML20199E996 (8)


Text

r l

Attachn2at to TXX-99008 l

Pa9e 1 of 8 l'

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT l

DOCKET NO.

50-445 UNIT:

CPSES 1 DATE:

1/ 8/99 COMPLETED BY:

Bob Reible TELEPHONE:

254-897-0449 i

OPERATING STATUS 1.

REPORTING PERIOD:

DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3411 MAX. DEPEND. CAPACITY (Mwe-Net):

1150 DESIGN ELECTRICAL RATING (MWe-Net):

1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

NONE i

4, REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUM8ER OF HOURS REACTOR WAS CRITICAL 744 7.874 62.635 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 2.632 7.

HOURS GENERATOR ON LINE 744 7.874 61.959 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2.532.480 26.460.660 203.240.444 i

10. GROSS ELECTRICAL ENERGY GENERATED (ifWH) 854.737 8.878.517 67.950.477 j
11. NET ELECTRICAL ENERGY GENERATED (MWH) 821.809 8.505.963 64.908.275
12. REACTOR SERVICE FACTOR 100.0 89.9 85.2
13. REACTOR AVAILABILITY FACTOR 100.0 89.9 88.8
14. UNIT SERVICE FACTOR 100.0 89.6 84.3
15. UNIT AVAILABILITY FACTOR 100.0 89.6 84.3
16. UNIT CAPACITY FACTOR (USING MDC) 96.2 84.4 76.8
17. lMIT CAPACITY FACTOR (USING DESIGN MWe) 96.2 84.4 76.8
18. UNIT FORCED OUTAGE RATE 0.0 0.0 3.7 l 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION 900813 l

l ESTIMATED 9901210168 990114 PDR ADOCK 05000445 L R

PDR l

Attachment,to TXX-99008

,Page 2'of 8 4

AVERAGE dally UNIT POWER LEVEL DOCKET NO..:

50-445 UNIT:

CPSES 1

~

DATE:

1/ 8/99 COMPLETED BY:

Bob Reible TELEPHONE:

254-897 0449 MONTH:

DECMEBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1 1106 17 1106 2

1105 18 1108 l

3 1105 19 1107 4

1099 20 1107 5

1058 21 1107 6

1104 22 1107 7

1103 23 1107 8

1106 24 1107 9

1105 25 1107 10 1106 26 1107 11 1107 27 1107 12 1108 28 1105 13 1108 29 1106 14 1107 30 1107 i

15 11.07 31 1107 16 1107 i

I

m.____

Attachn}ent,to TXX-99008 Pag 6 3 of 8 -

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-445 UNIT:

CPSES 1

DATE:

01/ 8/99 COMPLETED BY:

Bob Reible TELEPHONE:

254-897-0449 r

I r

i MONTH:

DECEMBER 1998 I

t

. DAY TIME REMARK / MODE l

12/01 0000 Unit began the month at 100% power.

I 12/31 2400 Unit ended the month at 100% power.

t I

t

[

l i

I I

i k

i I

i l

l

Attactynent to TXX-9S008 Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO.

50-445 UNIT:

CPSES 1

DATE:

1/ 8/99 COMPLETED BY:

Bob Reible TELEPHONE:

254-897-0449 REPORT MONTH:

DECEMBER 1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE 5: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE None 1)

REASON 2)

METHOD A:

EQUIPMENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCRAM C:

REFUELING G:

OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN) f 1

m

l Attachment to TXX-99008

.Page 5'of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO..

50-446 UNIT:

CPSES 2 DATE:

1/ 8/99

(

COMPLETED BY:

Bob Reible TELEPHONE:

254-897-0449 OPERATING STATUS 1.

REPORTING PERIOD:

DECEMBER 1998 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3411 MAX. DEPEND. CAPACITY (MWe-Net):

1150 DESIGN ELECTRICAL RATING (MWe-Net):

1150 l

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

NONE l

L 4.

REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE t

5.

NUMBER OF HOURS REACTOR WAS CRITICAL 744 8.745 40.849 l

6.

REACTOR RESERVE SHUTDOWN HOURS 0

15 2.326 7.

HOURS GENERATOR ON LINE 744 8.741 40.530 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

I 9.

GROSS THERMAL ENERGY GENERATED (MWH) 2.535.523 28.761.127 131.867.01

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 865.228 9.345.296 44.534.733 1

l l

11. NET ELECTRICAL ENERGY GENERATED (MWH) 831.228 9.733.421 42.636,077 t-
12. REACTOR SERVICE FACTOR 100.0 99.8 86.1
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 91.0 l
14. UNIT SERVICE FACTOR 100.0 99.8 85.4
15. UNIT AVAILABILITY FACTOR 100.0 99.6 85.4 l

l

16. UNIT CAPACITY FACTOR (USING MDC) 97.2 92.8 78.2

-17.

UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.2 92.8 78.

18. UNIT FORCED OUTAGE RATE 0.0 0.2 4.7
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

l

20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERC]AL OPERATION):

ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED

Attachment to TXX-99008 fage6'of8

-AVERAGE DAILY UN!T POWER LEVEL DOCKET NO.-

50-446 UNIT:

CPSES 2

DATE:

1/ 8/99 COMPLETED BY:

Bob Reible TELEPHONE:

254-897-0449 MONTH:

DECEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1 1119 17 1119 2

1119 18 1119 3

1117 19 1119 4

1117 20 1118 5

1117 21 1118 6

1117 22 1118 7

1117 23 1117 8

1117 24 1117 9

1113 25 1118 10 1110 26 1118 11 1118 27 1117 12 1118 28 1117 13 1118 29 1116 14 1118 30 1117 15 1117 31 1119 16 111/

4

I Attachment to TXX-99008

- faga7"of*8

SUMMARY

OF DrMTING EXPERIENCE FOR THE MONTH DOCKET NO.

50-446 I

UNIT:

CPSES 2

DATE:

1/ 8/99 COMPLETED BY:

Bob Reible i

TELEPHONE:

254-897-0449 l

t l

MONTH:

DECEMBER 1998 DAY TIME REMARK / MODE t

l 12/01 0000 Unit be9an the month at 100% power.

l 12/30 2400 Unit ended the month 5: 100% power.

i l

l l

b I

t f

i 4

i

[

Attacilment to IXX-T3008 Page 8 of 8

~

UNIT SHUTDOWNS AND POWER REDUCTIONS

=

DOCKET NO.:

50-446 UNIT:

CPSES 2

DATE:

1/ 8/99 COMPLETED BY:

Bob Reible TELEPHONE:

254-897-0449 REPORT MONTH:

DECEMBER 1998 j

METHOD OF TYPE SHUTTING 00hH t

F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i

i None None l

[

l I

1)

REASON 2)

METHOD

[

A:

EQUIPMENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MNUAL j

B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCPAM C:

REFUELING G:

OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

J i