                                              January 27, 1998
January 27, 1998
    EA 97 606
EA 97 606
    Mr. Oliver D. Kingsley
Mr. Oliver D. Kingsley
    President, Nuclear Generation Group
President, Nuclear Generation Group
    Commonwealth Edison Company
Commonwealth Edison Company
    ATTN: Regulatory Sen As
ATTN: Regulatory Sen As
    Executive Towers West lil
Executive Towers West lil
    1400 Opus Place, Suite 500
1400 Opus Place, Suite 500
    Downers Grove, IL 60515
Downers Grove, IL 60515
    SUBJECT:       NRC INSPECTION REPORT 50 295/97023; 50-304/97023 AND
SUBJECT:
                    NOTICE OF VIOLATION
NRC INSPECTION REPORT 50 295/97023; 50-304/97023 AND
    Dear Mr. Kingsley:
NOTICE OF VIOLATION
    This refers to the inspection conducted on September 8 through December 16,1997, at the
Dear Mr. Kingsley:
    Zion Units 1 and 2 reactor facilities. The enclosed report presents the results of this i~ 'ction.
This refers to the inspection conducted on September 8 through December 16,1997, at the
    The inspection involved examination of engineering activillas primarily related to the Unit 2
Zion Units 1 and 2 reactor facilities. The enclosed report presents the results of this i~ 'ction.
    restart with a focus on reviewing corrective actions taken to address engineering issues
The inspection involved examination of engineering activillas primarily related to the Unit 2
    identified during the Engineering and Technical Support (E&TS) inspection in 1996. The
restart with a focus on reviewing corrective actions taken to address engineering issues
    inspectors evaluated the effectiveness of your engineering and support groups in identifying,
identified during the Engineering and Technical Support (E&TS) inspection in 1996. The
    assessing and resolving technicalissues. The inspectors also evaluated the effectiveness of
inspectors evaluated the effectiveness of your engineering and support groups in identifying,
    your self assessment and corrective action processes.
assessing and resolving technicalissues. The inspectors also evaluated the effectiveness of
    The NRC noted that engineering related improvements have occurred (mainly in the design
your self assessment and corrective action processes.
    enginecring organization) since the E&TS lnspection conducted in 1996. Various engineering .
The NRC noted that engineering related improvements have occurred (mainly in the design
                                                  _
enginecring organization) since the E&TS lnspection conducted in 1996. Various engineering .
    related improvement programs such as the design basis initiative, operating experience and the
_
    engineering assurance group have been initiated; however, it was too early to assess the long
related improvement programs such as the design basis initiative, operating experience and the
    term effectiveness of these programs. Furthermore, the violations identified by the NRC and
engineering assurance group have been initiated; however, it was too early to assess the long
    discussed in this report, represent continuing chelhnges that remain to be addressed.
term effectiveness of these programs. Furthermore, the violations identified by the NRC and
    Based on the results of this inspection, the NRC has determined that five violations of NRC
discussed in this report, represent continuing chelhnges that remain to be addressed.
    requirements occurred. These vlotations are cited in the enclosed Notice of Violation (Notice)
Based on the results of this inspection, the NRC has determined that five violations of NRC
    and the circumstances surrounding them are described in detallin the s
and the circumstances surrounding them are described in detallin the s
    The subject violations irivolve failure to adhere to scaffoldirg procedure requirements;
requirements occurred. These vlotations are cited in the enclosed Notice of Violation (Notice)
    ineffective corrective actions, relating to out of tolerance and oil samples; failure to ensure that
The subject violations irivolve failure to adhere to scaffoldirg procedure requirements;
                                                                                                        [
[
    proficiency and qualifications were adequately achieved and maintained for Raychem splice
ineffective corrective actions, relating to out of tolerance and oil samples; failure to ensure that
    applications; failure to report identified discrepancies in the emergency core cooling system
proficiency and qualifications were adequately achieved and maintained for Raychem splice
    small break loss of coolant accident analysis; and a failure to report a condition outside the
applications; failure to report identified discrepancies in the emergency core cooling system
    design basis in a timely manner.
small break loss of coolant accident analysis; and a failure to report a condition outside the
                Nn013
design basis in a timely manner.
  ggg20;ggg;;gagg
Nn013
                                  ,
I,l ,l!. !.!!,[
                                                    I,l ,l!. !.!!,[ !!( !!h ,!
> !!( !!h ,!
                                                            ,
)[[f
                                                                  >
,
                                                                                      )[[f
,
ggg20;ggg;;gagg


                                                  _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ _
_ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ _
    .
.
  3
3
                                                                                                            2
2
      O. Kingsley                                                       2
O. Kingsley
                                                                                          ,lanuary 27, 1998
2
      Please note that you are required to respond to this letter and should follow the instructions
,lanuary 27, 1998
      specified in the enclosed Notice when preparing your response. The NRC will use your
Please note that you are required to respond to this letter and should follow the instructions
      response, in part, to determine whether further enforcement action is necessary to ensure
specified in the enclosed Notice when preparing your response. The NRC will use your
      compliance with regulatory requirements.
response, in part, to determine whether further enforcement action is necessary to ensure
      In addition, three apparent violations were identified and are being considered for escalated
compliance with regulatory requirements.
      enforecment action in accordance with the " General Statement of Policy and Procedure for
In addition, three apparent violations were identified and are being considered for escalated
      NRC Enforcement Actions"(Enforcement Policy), NUREG 1600. The apparent violations
enforecment action in accordance with the " General Statement of Policy and Procedure for
      involve cross tying 125 Vdc buses from Unit 1 to Unit 2 with the battery and charger
NRC Enforcement Actions"(Enforcement Policy), NUREG 1600. The apparent violations
      disconnected from the bus and the associated buses not being declared inoperable. This
involve cross tying 125 Vdc buses from Unit 1 to Unit 2 with the battery and charger
      situation continued to occur ofter your staff Identified in September 1996 that the cross tying
disconnected from the bus and the associated buses not being declared inoperable. This
      resulted in the plant being outside its design basis. Upon completion of this evaluation you
situation continued to occur ofter your staff Identified in September 1996 that the cross tying
      failed to ensure that the design bases were correctly translated into appropriate procedures.
resulted in the plant being outside its design basis. Upon completion of this evaluation you
      Additionally, you failed to adhere to the requirements of T.S. 3.15.2.E when one 125 Vdc
failed to ensure that the design bases were correctly translated into appropriate procedures.
      battery and/or distribution system for a unit was not operable. Although the NRC began
Additionally, you failed to adhere to the requirements of T.S. 3.15.2.E when one 125 Vdc
      questioning the practice in March 1997, cross-tying was not discontinued until August 1997.
battery and/or distribution system for a unit was not operable. Although the NRC began
,    While both units were shutdown during this period, your engineering staff did not complete its
questioning the practice in March 1997, cross-tying was not discontinued until August 1997.
      evaluation to determine the acceptability of cross tying under shutdown conditions until
While both units were shutdown during this period, your engineering staff did not complete its
      September 1997,
,
evaluation to determine the acceptability of cross tying under shutdown conditions until
September 1997,
1
1
l     No Notice of Violation is presently being issued for these three apparent violations. However,
l
      we request that you respond within 30 days of the date of this letter to the apparent violations
No Notice of Violation is presently being issued for these three apparent violations. However,
      discussed in the enclosed inspection report. Your response should be clearly marked as a
we request that you respond within 30 days of the date of this letter to the apparent violations
      * Response to Apparent Violations in Inspection Report Nos. 50-295/97023; 50-304/97023 and
discussed in the enclosed inspection report. Your response should be clearly marked as a
l     should include for each apparent violation: (1) the reason for the apparent violation, or, if
* Response to Apparent Violations in Inspection Report Nos. 50-295/97023; 50-304/97023 and
!     contested, the basis for disputing the apparent violation, (2) the corrective steps that have been
l
      taken and the results achieved, (3) the corrective step = that will be taken to avoid further
should include for each apparent violation: (1) the reason for the apparent violation, or, if
      violations, and (4) the date when full compliance will be achieved. Your response should be
!
      submitted under oath os affirmation and may reference or include previous docketed
contested, the basis for disputing the apparent violation, (2) the corrective steps that have been
      correspondence, if the correspondence adequately addresses the required response.
taken and the results achieved, (3) the corrective step = that will be taken to avoid further
      We Intend to review your response to the apparent violations described in the enclosed
violations, and (4) the date when full compliance will be achieved. Your response should be
      inspection report. Based on the results of this raview, we will determine whether a
submitted under oath os affirmation and may reference or include previous docketed
      pre-decisional enforcement conference is necessary to enable the NRC to make an
correspondence, if the correspondence adequately addresses the required response.
      enforcement decision. You also have the right to request a conference if you deem it
We Intend to review your response to the apparent violations described in the enclosed
      necessary. Please be advised that the number and characterization of apparent violations
inspection report. Based on the results of this raview, we will determine whether a
      described in the enclosed inspection report may change as a result of further NRC review. You
pre-decisional enforcement conference is necessary to enable the NRC to make an
      will be advised by separate correspondence of the results of our deliberations on this matter.
enforcement decision. You also have the right to request a conference if you deem it
necessary. Please be advised that the number and characterization of apparent violations
described in the enclosed inspection report may change as a result of further NRC review. You
will be advised by separate correspondence of the results of our deliberations on this matter.


    .
.
  ,
,
      O. Kingsley                                                         3                                         January 27, 1998
O. Kingsley
      in accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter, its
3
January 27, 1998
in accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
<
<
      enclosures, and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
                                                              Sincerely,
original signed by C. E. Grant
                                                                original signed by C. E. Grant
Geoffrey E. Grant, Director
                                                              Geoffrey E. Grant, Director
Division of Reactor Projects
                                                              Division of Reactor Projects
Docket Nos: 50-295; 50 304
      Docket Nos: 50-295; 50 304
License Nos: DPR 39; DPR-48
      License Nos: DPR 39; DPR-48
Enclosures: 1. Notice of Violation
      Enclosures: 1. Notice of Violation
2. Inspection Report
                            2. Inspection Report
Nos, 50-295/97023; 50 304/97023
                                  Nos, 50-295/97023; 50 304/97023
cc w/encls:
      cc w/encls:             M. Wallace, Senior Vice President,
M. Wallace, Senior Vice President,
                                Corporate Services
Corporate Services
                              H. G. Stanley, Vice President,
H. G. Stanley, Vice President,
                                PWR Operations
PWR Operations
                            J. Perry, Vice President
J. Perry, Vice President
                                BWR Operations
BWR Operations
                              Liaison Officer, NOC-BOD
Liaison Officer, NOC-BOD
                              D. A. Sager, Vice President,
D. A. Sager, Vice President,
                                Generation Support
Generation Support
                              D. Farrar, Nuclear Regulatory
D. Farrar, Nuclear Regulatory
                                Services Manager
Services Manager
                              1. Johnson, Licensing Operations Manager
1. Johnson, Licensing Operations Manager
                              Document Control Desk - Licensing
Document Control Desk - Licensing
                              R. Starkey, Plant General Manager
R. Starkey, Plant General Manager
                              R. Godley, Regulatory Assurance
R. Godley, Regulatory Assurance
                                Supervisor
Supervisor
                              Richard Hubbard
Richard Hubbard
                            Nathan Schloss, Economist,
Nathan Schloss, Economist,
                              Office of the Attorney General
Office of the Attorney General
                              Mayor, City of Zion
Mayor, City of Zion
                              State Liaison Officer
State Liaison Officer
                              State Liaison Officer, Wisconsin
State Liaison Officer, Wisconsin
                              Chairme.n, Illinois Commerce Commission
Chairme.n, Illinois Commerce Commission
      See Attached Distribution
See Attached Distribution
      DOCUMENT NAME: G:DRS\ZIO97023.DRS (See Previous Concurrence)
DOCUMENT NAME: G:DRS\\ZIO97023.DRS
      1. ,.c.~. . ..,y .e in   co   oow.i. i. is. .., c . ceny -isoui .,i.com.~i,.ac,n.o,. v . cccy in .,,,cs, v.acin.o,. v . we cory
(See Previous Concurrence)
        OFFICE           Rlll/DRS               Rill /DRS               Rlll/DRP                 Rlil/ENF                 Rill /DRS   Rlli/DRP
1. ,.c.~. . ..,y .e in
        NAME             Guzman                 Lougheed                 Hills                     Clayton                 Grobe     Gran
co
                          Falevits:sd                                     Vegel                                                             Ak
oow.i. i. is. .., c . ceny -isoui .,i.com.~i,.ac,n.o,.
        DATE             01/ /98       ~'
v . cccy in .,,,cs,
                                                01/ /98                 01/ /98                   01/ /98                 01/ /98   01tTftW
v.acin.o,. v . we cory
                                                          OFFICIAL RECORD COPY
OFFICE
Rlll/DRS
Rill /DRS
Rlll/DRP
Rlil/ENF
Rill /DRS
Rlli/DRP
NAME
Guzman
Lougheed
Hills
Clayton
Grobe
Gran
Falevits:sd
Vegel
Ak
DATE
01/ /98
01/ /98
01/ /98
01/ /98
01/ /98
01tTftW
~'
OFFICIAL RECORD COPY


              . - -     -.                       -       -       _         .. -        -.     - -     .     - - - - -
. - -
          .
-.
'.
-
            J. Brons                                             3
-
  .
_
              In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
..
            enclosures, and your response will be placed in the NRC Public Document Room (PDR),
-.
                                                        Sincerely,
- -
                                                          Geoffrey E. Grant, Director
.
                                                          Division of Reactor Projects
- - - -
            Docket Nos: 50 295;50 304
-
              License Nos: DPR 39; DPR-48
-
              Enclosures: 1. Notice of Violation
.
                            2. Inspection Report
'.
                                    Nos. 50 295/97023; 50 304/07023
J. Brons
                                                                                                                            "
3
            cc w/encis:       O. Kingsley, Nuclear Generation Group
.
                                  President & Chief Nuclear Officer
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
                                M. Wallace, Senior Vice President;
enclosures, and your response will be placed in the NRC Public Document Room (PDR),
                                  Corporate Services
Sincerely,
                                H. G. Stanley, Vice President,
Geoffrey E. Grant, Director
                                  PWR Operations
Division of Reactor Projects
                                Liaison Officcc. NOC-BOD
Docket Nos: 50 295;50 304
                                D. A. Sager, Vice President,
License Nos: DPR 39; DPR-48
                                Generation Support
Enclosures: 1. Notice of Violation
                                D. Farrar, Nuclear Regulatory
2. Inspection Report
                                Services Manager
Nos. 50 295/97023; 50 304/07023
                                1. Johnson, Licensing Operations Manager
"
                                Document Control Desk - Licensing
cc w/encis:
                                R. Starkey, Plant General Manager
O. Kingsley, Nuclear Generation Group
                                R. Godity, Regulatory Assurance
President & Chief Nuclear Officer
                                Supervisor
M. Wallace, Senior Vice President;
                                Richard Hubbard
Corporate Services
                                Nathan Schloss, Economist,
H. G. Stanley, Vice President,
                                Office of the Attorney General
PWR Operations
                                Mayor, City of Zion
Liaison Officcc. NOC-BOD
                                State Liaison Officer
D. A. Sager, Vice President,
                                State Liaison Officer, Wisconsin
Generation Support
                                Chairman, Illinois Commerce Commission
D. Farrar, Nuclear Regulatory
            Distribution
Services Manager
            Docket File w/encls               Ril; PRR w/encls                       Rill Enf. Coordinator w/encls
1. Johnson, Licensing Operations Manager
            PUBLIC IE-01 w/ enc!s             SRI, Zion w/encls                     TSS w/encls
Document Control Desk - Licensing
            LPM, NRR w/encls                 J. L. Caldwe'l, Rlli w/encls           R. A. Capra, NRR w/enets
R. Starkey, Plant General Manager
            DRP w/encls                       A. B. Beach, Rlli w/ene!s               DOCDESK w/encls
R. Godity, Regulatory Assurance
            DRS w/encls                       G. E. Grant, Rlli w/encls             CAA1 w/encls
Supervisor
DOCUMENT NAME: G:DRS\ZIO97023.DRS.                           4<su mvous coecumeco
Richard Hubbard
v.   .~..e m enein e.e m i.,se. mie w ca. c e m . w w . r . e m .+ .n. w ., e . ir . wo m
Nathan Schloss, Economist,
  OFFICE         Rill /DRS   l     Rlll/DRS         Rill /DRP           Rlll/ENF         Rlll/DRS,l     Pill /DRP
Office of the Attorney General
  NAME           Guzman       g   Loughded         Hills *             Clayton         Gro           Grant
Mayor, City of Zion
                Falevits:sd
State Liaison Officer
                                                4 Vegel4
State Liaison Officer, Wisconsin
  DATE           01/ /98           01/ /98         01/ /08           01/ /98           01/lP98       01/ /98
Chairman, Illinois Commerce Commission
                                                      OFFICIAL RECORD COPY
Distribution
                                                                                                _
Docket File w/encls
Ril; PRR w/encls
Rill Enf. Coordinator w/encls
PUBLIC IE-01 w/ enc!s
SRI, Zion w/encls
TSS w/encls
LPM, NRR w/encls
J. L. Caldwe'l, Rlli w/encls
R. A. Capra, NRR w/enets
DRP w/encls
A. B. Beach, Rlli w/ene!s
DOCDESK w/encls
DRS w/encls
G. E. Grant, Rlli w/encls
CAA1 w/encls
DOCUMENT NAME: G:DRS\\ZIO97023.DRS.
4<su mvous coecumeco
v.
.~..e m enein e.e m i.,se.
mie w ca. c e m . w w . r . e m .+ .n. w ., e . ir . wo m
OFFICE
Rill /DRS
l
Rlll/DRS
Rill /DRP
Rlll/ENF
Rlll/DRS,l
Pill /DRP
NAME
Guzman
g
Loughded
Hills *
Clayton
Gro
Grant
4
Falevits:sd
Vegel4
DATE
01/ /98
01/ /98
01/ /08
01/ /98
01/lP98
01/ /98
OFFICIAL RECORD COPY
_


                        _ _ - _ . _ _ _ _ _ _ - _ - _ - - _
_ _ - _ . _ _ _ _ _ _ - _ - _ - - _
          ,
,
  '.
'.
                        '
'
            J. Brons                                                                         3
J. Brons
    .
3
            In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter,its                                         ;
.
            enclosures, and your response will be placed in the NRC Public Document Room (PDR).
In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter,its
                                                                                    Sincerely,
;
                                                                                      Geoffrey E. Grant, Director
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
                                                                                      Division of Reactor Projects
Sincerely,
            Docket Nos: 50 295;50-304
Geoffrey E. Grant, Director
            License Nos: DPR 39; DPR-48
Division of Reactor Projects
            Enclosures: 1. Notice of Violatloc
Docket Nos: 50 295;50-304
                                                2. Inspection Report
License Nos: DPR 39; DPR-48
                                                                Nos. 50-295/97023; 50-304/97023
Enclosures: 1. Notice of Violatloc
            cc w/encts:                                   O. Kingsley, Nuclear Generation Group
2. Inspection Report
                                                                President & Chief Nuclear Officer
Nos. 50-295/97023; 50-304/97023
                                                            M. Wallace, Senior Vice President,
cc w/encts:
                                                                Corporate Services
O. Kingsley, Nuclear Generation Group
                                                            H. G. Stanley, Vice President,
President & Chief Nuclear Officer
l                                                               PWR Operations
M. Wallace, Senior Vice President,
Corporate Services
H. G. Stanley, Vice President,
l
PWR Operations
!
!
                                                            Liaison Officer, NOC-BOD
Liaison Officer, NOC-BOD
l                                                            D. A. Sager, Vice President,
                                                              Generation Support
l
l
l                                                           D. Farrar Nuclear Regulatory
D. A. Sager, Vice President,
                                                              Services Manager
l
Generation Support
l
D. Farrar Nuclear Regulatory
Services Manager
I. Johnson, Licensing Operationa Msnager
,
,
'
'
                                                            I. Johnson, Licensing Operationa Msnager
Document Control Desk - Licensing
                                                            Document Control Desk - Licensing
R. Starkey, Plant General Mana0er
                                                            R. Starkey, Plant General Mana0er
R. Godley, Regulatory Assurance
                                                            R. Godley, Regulatory Assurance
Supervisor
                                                              Supervisor
Richard Hubbard
                                                            Richard Hubbard
Nathan Schloss, Economist,
                                                            Nathan Schloss, Economist,
Office of the Attomey General
                                                              Office of the Attomey General
Mayor, City of Zion
                                                            Mayor, City of Zion
State Liaison Officer
                                                            State Liaison Officer
State Liaison Officer, Wisconsin
                                                            State Liaison Officer, Wisconsin
Chairman, Illinois Commerce Commission
                                                            Chairman, Illinois Commerce Commission
Distribution
              Distribution
Docket File w/encls
              Docket File w/encls                                           Rlli PRR w/encls                       Rlli Enf. Coordinator w/encls
Rlli PRR w/encls
              PUBLIC IE-01 w/encls                                           SRI, Zion w/encls                     TSS w/encls
Rlli Enf. Coordinator w/encls
              LPM, NRR w/encls                                               J. L. Caldwell, Rlll w/encls           R. A. Capra, NRR w/encls
PUBLIC IE-01 w/encls
              DRP w/encls                                                   A. B. Beach, Rlll w/encls               DOCDESK w/encls
SRI, Zion w/encls
              DRS w/encls                                                   G E. Grant, Rlli w/encls               CAA1 w/encls
TSS w/encls
  DOCUMENT NAME: G:DRS\ZIO97023.DRS
LPM, NRR w/encls
  tomo...m wmi.*e-au,*.                                       mm..m c em e . e t % . e.e w ..= ~ ~ . >c.wem
J. L. Caldwell, Rlll w/encls
    OFFICE Rlll/DRS                                   lc Rlll/DRS b/ Rlll/DRP E Rlll/DRP                         6 Rill /DRP         Rlll/DRg
R. A. Capra, NRR w/encls
    ~$AME                                                         L9vgheed         Hills             Vogel             Grant       Grobe
DRP w/encls
                Guzmanf[
A. B. Beach, Rlll w/encls
                Falevite:sd                                       @ *e                                     gM
DOCDESK w/encls
    DATE       01/1/98                                           01/2/98         01/5/98           01/fl98           01/ /98     01/ /98
DRS w/encls
                                                                                  OFFICIAL RECORD COPY
G E. Grant, Rlli w/encls
CAA1 w/encls
DOCUMENT NAME: G:DRS\\ZIO97023.DRS
tomo...m wmi.*e-au,*.
mm..m c em e . e t % . e.e w ..= ~ ~ . >c.wem
OFFICE
Rlll/DRS
lc
Rlll/DRS
b/ Rlll/DRP
E
Rlll/DRP
6
Rill /DRP
Rlll/DRg
~$AME
Guzmanf[
L9vgheed
Hills
Vogel
Grant
Grobe
Falevite:sd
@ *e
gM
DATE
01/1/98
01/2/98
01/5/98
01/fl98
01/ /98
01/ /98
OFFICIAL RECORD COPY


.
.
    .                .  . .  . -      . - - . . . . .  - - - . - . _ . . ~ . - . - . -                . . - - _ - . - - - - .
                                                                                                                                    ,
      .                                                                                                                          r
  -
        - O. Kingsley                                  4                                        January 27, 1998
.
.
.
. .
.
-
. - - . . . . .
- - - . - . _ . . ~ . - . - . -
. . - - _ - . - - - - .
,
.
r
-
- O. Kingsley
4
4
          Distribution
January 27, 1998
          Docket File w/encls     Rlli PRR w/encls                                       Rill Enf. Coordinator w/encls
.
          PUBLIC IE-01 w/encls     SRI, Zion w/ enc ls                                     TSS w/encls
4
          LPM, NRR w/encls         J L. Caldwell, Rlli w/encls                             R. A. Capra, NRR w/encls
Distribution
,        DRP w/encls             A; B. Beach, Rlli w/encls                               DOCDESK w/encls
Docket File w/encls
Rlli PRR w/encls
Rill Enf. Coordinator w/encls
PUBLIC IE-01 w/encls
SRI, Zion w/ enc ls
TSS w/encls
LPM, NRR w/encls
J L. Caldwell, Rlli w/encls
R. A. Capra, NRR w/encls
DRP w/encls
A; B. Beach, Rlli w/encls
DOCDESK w/encls
,
DRS w/encls
G. E. Grant, Rlli w/encls
CAA1 w/encls
J.
~
~
          DRS w/encls              G. E. Grant, Rlli w/encls                              CAA1 w/encls        J.
Lieberman, OE
          Lieberman, OE           J. Goldberg, OGC                                       R. Zimmerman, NRR
J. Goldberg, OGC
R. Zimmerman, NRR
i
i
'
'
                                                                                                                                  i
i
Y
Y
i
i
Line 293: Line 437:
5
5
5.
5.
1-                                                           .-
1-
.-
+
+
;
;
}}
}}

Latest revision as of 07:36, 10 December 2024

Forwards Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216 & Nov.Violation Involved Failure to Adhere to Scaffolding Procedure Requirements & Failure to Ensure That Proficiency & Qualifications Were Adequately Achieved
ML20199G194
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/27/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20199G198 List:
References
50-295-97-23, 50-304-97-23, EA-97-606, NUDOCS 9802040237
Download: ML20199G194 (6)


See also: IR 05000295/1997023

Text

{{#Wiki_filter:. o January 27, 1998 EA 97 606 Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Sen As Executive Towers West lil 1400 Opus Place, Suite 500 Downers Grove, IL 60515 SUBJECT: NRC INSPECTION REPORT 50 295/97023; 50-304/97023 AND NOTICE OF VIOLATION Dear Mr. Kingsley: This refers to the inspection conducted on September 8 through December 16,1997, at the Zion Units 1 and 2 reactor facilities. The enclosed report presents the results of this i~ 'ction. The inspection involved examination of engineering activillas primarily related to the Unit 2 restart with a focus on reviewing corrective actions taken to address engineering issues identified during the Engineering and Technical Support (E&TS) inspection in 1996. The inspectors evaluated the effectiveness of your engineering and support groups in identifying, assessing and resolving technicalissues. The inspectors also evaluated the effectiveness of your self assessment and corrective action processes. The NRC noted that engineering related improvements have occurred (mainly in the design enginecring organization) since the E&TS lnspection conducted in 1996. Various engineering . _ related improvement programs such as the design basis initiative, operating experience and the engineering assurance group have been initiated; however, it was too early to assess the long term effectiveness of these programs. Furthermore, the violations identified by the NRC and discussed in this report, represent continuing chelhnges that remain to be addressed. Based on the results of this inspection, the NRC has determined that five violations of NRC and the circumstances surrounding them are described in detallin the s requirements occurred. These vlotations are cited in the enclosed Notice of Violation (Notice) The subject violations irivolve failure to adhere to scaffoldirg procedure requirements; [ ineffective corrective actions, relating to out of tolerance and oil samples; failure to ensure that proficiency and qualifications were adequately achieved and maintained for Raychem splice applications; failure to report identified discrepancies in the emergency core cooling system small break loss of coolant accident analysis; and a failure to report a condition outside the design basis in a timely manner. Nn013 I,l ,l!. !.!!,[ > !!( !!h ,! )[[f , , ggg20;ggg;;gagg

_ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ _ . 3 2 O. Kingsley 2 ,lanuary 27, 1998 Please note that you are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements. In addition, three apparent violations were identified and are being considered for escalated enforecment action in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions"(Enforcement Policy), NUREG 1600. The apparent violations involve cross tying 125 Vdc buses from Unit 1 to Unit 2 with the battery and charger disconnected from the bus and the associated buses not being declared inoperable. This situation continued to occur ofter your staff Identified in September 1996 that the cross tying resulted in the plant being outside its design basis. Upon completion of this evaluation you failed to ensure that the design bases were correctly translated into appropriate procedures. Additionally, you failed to adhere to the requirements of T.S. 3.15.2.E when one 125 Vdc battery and/or distribution system for a unit was not operable. Although the NRC began questioning the practice in March 1997, cross-tying was not discontinued until August 1997. While both units were shutdown during this period, your engineering staff did not complete its , evaluation to determine the acceptability of cross tying under shutdown conditions until September 1997, 1 l No Notice of Violation is presently being issued for these three apparent violations. However, we request that you respond within 30 days of the date of this letter to the apparent violations discussed in the enclosed inspection report. Your response should be clearly marked as a

  • Response to Apparent Violations in Inspection Report Nos. 50-295/97023; 50-304/97023 and

l should include for each apparent violation: (1) the reason for the apparent violation, or, if ! contested, the basis for disputing the apparent violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective step = that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response should be submitted under oath os affirmation and may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. We Intend to review your response to the apparent violations described in the enclosed inspection report. Based on the results of this raview, we will determine whether a pre-decisional enforcement conference is necessary to enable the NRC to make an enforcement decision. You also have the right to request a conference if you deem it necessary. Please be advised that the number and characterization of apparent violations described in the enclosed inspection report may change as a result of further NRC review. You will be advised by separate correspondence of the results of our deliberations on this matter.

. , O. Kingsley 3 January 27, 1998 in accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room (PDR). < Sincerely, original signed by C. E. Grant Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos: 50-295; 50 304 License Nos: DPR 39; DPR-48 Enclosures: 1. Notice of Violation 2. Inspection Report Nos, 50-295/97023; 50 304/97023 cc w/encls: M. Wallace, Senior Vice President, Corporate Services H. G. Stanley, Vice President, PWR Operations J. Perry, Vice President BWR Operations Liaison Officer, NOC-BOD D. A. Sager, Vice President, Generation Support D. Farrar, Nuclear Regulatory Services Manager 1. Johnson, Licensing Operations Manager Document Control Desk - Licensing R. Starkey, Plant General Manager R. Godley, Regulatory Assurance Supervisor Richard Hubbard Nathan Schloss, Economist, Office of the Attorney General Mayor, City of Zion State Liaison Officer State Liaison Officer, Wisconsin Chairme.n, Illinois Commerce Commission See Attached Distribution DOCUMENT NAME: G:DRS\\ZIO97023.DRS (See Previous Concurrence) 1. ,.c.~. . ..,y .e in co oow.i. i. is. .., c . ceny -isoui .,i.com.~i,.ac,n.o,. v . cccy in .,,,cs, v.acin.o,. v . we cory OFFICE Rlll/DRS Rill /DRS Rlll/DRP Rlil/ENF Rill /DRS Rlli/DRP NAME Guzman Lougheed Hills Clayton Grobe Gran Falevits:sd Vegel Ak DATE 01/ /98 01/ /98 01/ /98 01/ /98 01/ /98 01tTftW ~' OFFICIAL RECORD COPY

. - - -. - - _ .. -. - - . - - - - - - . '. J. Brons 3 . In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room (PDR), Sincerely, Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos: 50 295;50 304 License Nos: DPR 39; DPR-48 Enclosures: 1. Notice of Violation 2. Inspection Report Nos. 50 295/97023; 50 304/07023 " cc w/encis: O. Kingsley, Nuclear Generation Group President & Chief Nuclear Officer M. Wallace, Senior Vice President; Corporate Services H. G. Stanley, Vice President, PWR Operations Liaison Officcc. NOC-BOD D. A. Sager, Vice President, Generation Support D. Farrar, Nuclear Regulatory Services Manager 1. Johnson, Licensing Operations Manager Document Control Desk - Licensing R. Starkey, Plant General Manager R. Godity, Regulatory Assurance Supervisor Richard Hubbard Nathan Schloss, Economist, Office of the Attorney General Mayor, City of Zion State Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce Commission Distribution Docket File w/encls Ril; PRR w/encls Rill Enf. Coordinator w/encls PUBLIC IE-01 w/ enc!s SRI, Zion w/encls TSS w/encls LPM, NRR w/encls J. L. Caldwe'l, Rlli w/encls R. A. Capra, NRR w/enets DRP w/encls A. B. Beach, Rlli w/ene!s DOCDESK w/encls DRS w/encls G. E. Grant, Rlli w/encls CAA1 w/encls DOCUMENT NAME: G:DRS\\ZIO97023.DRS. 4<su mvous coecumeco v. .~..e m enein e.e m i.,se. mie w ca. c e m . w w . r . e m .+ .n. w ., e . ir . wo m OFFICE Rill /DRS l Rlll/DRS Rill /DRP Rlll/ENF Rlll/DRS,l Pill /DRP NAME Guzman g Loughded Hills * Clayton Gro Grant 4 Falevits:sd Vegel4 DATE 01/ /98 01/ /98 01/ /08 01/ /98 01/lP98 01/ /98 OFFICIAL RECORD COPY _

_ _ - _ . _ _ _ _ _ _ - _ - _ - - _ , '. ' J. Brons 3 . In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter,its

enclosures, and your response will be placed in the NRC Public Document Room (PDR). Sincerely, Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos: 50 295;50-304 License Nos: DPR 39; DPR-48 Enclosures: 1. Notice of Violatloc 2. Inspection Report Nos. 50-295/97023; 50-304/97023 cc w/encts: O. Kingsley, Nuclear Generation Group President & Chief Nuclear Officer M. Wallace, Senior Vice President, Corporate Services H. G. Stanley, Vice President, l PWR Operations ! Liaison Officer, NOC-BOD l D. A. Sager, Vice President, l Generation Support l D. Farrar Nuclear Regulatory Services Manager I. Johnson, Licensing Operationa Msnager , ' Document Control Desk - Licensing R. Starkey, Plant General Mana0er R. Godley, Regulatory Assurance Supervisor Richard Hubbard Nathan Schloss, Economist, Office of the Attomey General Mayor, City of Zion State Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce Commission Distribution Docket File w/encls Rlli PRR w/encls Rlli Enf. Coordinator w/encls PUBLIC IE-01 w/encls SRI, Zion w/encls TSS w/encls LPM, NRR w/encls J. L. Caldwell, Rlll w/encls R. A. Capra, NRR w/encls DRP w/encls A. B. Beach, Rlll w/encls DOCDESK w/encls DRS w/encls G E. Grant, Rlli w/encls CAA1 w/encls DOCUMENT NAME: G:DRS\\ZIO97023.DRS tomo...m wmi.*e-au,*. mm..m c em e . e t % . e.e w ..= ~ ~ . >c.wem OFFICE Rlll/DRS lc Rlll/DRS b/ Rlll/DRP E Rlll/DRP 6 Rill /DRP Rlll/DRg ~$AME Guzmanf[ L9vgheed Hills Vogel Grant Grobe Falevite:sd @ *e gM DATE 01/1/98 01/2/98 01/5/98 01/fl98 01/ /98 01/ /98 OFFICIAL RECORD COPY

. . . . . . - . - - . . . . . - - - . - . _ . . ~ . - . - . - . . - - _ - . - - - - . , . r - - O. Kingsley 4 January 27, 1998 . 4 Distribution Docket File w/encls Rlli PRR w/encls Rill Enf. Coordinator w/encls PUBLIC IE-01 w/encls SRI, Zion w/ enc ls TSS w/encls LPM, NRR w/encls J L. Caldwell, Rlli w/encls R. A. Capra, NRR w/encls DRP w/encls A; B. Beach, Rlli w/encls DOCDESK w/encls , DRS w/encls G. E. Grant, Rlli w/encls CAA1 w/encls J. ~ Lieberman, OE J. Goldberg, OGC R. Zimmerman, NRR i ' i Y i 4 5 5. 1- .- +

}}