VALLECITOS BOILING WATER REACTOR ANNUAL REPORT NO. 21 (DEACTIVATED)
VALLECITOS BOILING WATER REACTOR ANNUAL REPORT NO. 21 (DEACTIVATED)
LICENSE DPR-I DOCKET 50-18 NUCLEAR TECHNOLOGIES & FUEL DIVISION e GENERAL ELECTRIC COMPANY VALLECITOS NUCLEAR CENTER, PLEASANTON, CALIFORNIA 94566 l
LICENSE DPR-I DOCKET 50-18 NUCLEAR TECHNOLOGIES & FUEL DIVISION e GENERAL ELECTRIC COMPANY VALLECITOS NUCLEAR CENTER, PLEASANTON, CALIFORNIA 94566 l
                                                                              'M 6 8604020626 e5f.231                                                     ,
'M 6 8604020626 e5f.231 yB '
gDR ADOCK O       yB '
ADOCK O gDR L
L


  't Vallecitos Boiling Water Reactor Annual Report No. 21 (Deactivated)
't Vallecitos Boiling Water Reactor Annual Report No. 21 (Deactivated)
The status of the Vallecitos Boiling Water Reactor (VBWR) during the calendar year of 1985 is described in this twenty-first report of the deactivated facility in conformance with License DPR-1, Docket 50-18, Amendment 19, Paragraph 5.d.2.
The status of the Vallecitos Boiling Water Reactor (VBWR) during the calendar year of 1985 is described in this twenty-first report of the deactivated facility in conformance with License DPR-1, Docket 50-18, Amendment 19, Paragraph 5.d.2.
I.  
I.


==SUMMARY==
==SUMMARY==
The facility remained essentially in a static condition as described in Annual Report No. 20. Entry into the containment building was made for routine radiation surveys and for a check of general conditions throughout the building to verify the unchanged condition of the facility. The reactor vessel water level was monitored and remained essentially constant.
The facility remained essentially in a static condition as described in Annual Report No. 20. Entry into the containment building was made for routine radiation surveys and for a check of general conditions throughout the building to verify the unchanged condition of the facility. The reactor vessel water level was monitored and remained essentially constant.
II. STATUS OF THE FACILITY A. Containment Building No changes were made during the report period.
II.
B. General Systems No changes were made during the report period.'
STATUS OF THE FACILITY A.
III. PERIODIC INSPECTIONS Inspections of the facility were continued on a routine basis. The annual air samples and radiation and contamination surveys of the contairment building
Containment Building No changes were made during the report period.
,    .are given in Table 1 of this- report.
B.
IV. RADIATION AND CONTAMINATION Radiation and contamination surveys of the facility indicate the levels in all cases were well below the limits for any safety concern.
General Systems No changes were made during the report period.'
'                                                  t
III.
PERIODIC INSPECTIONS Inspections of the facility were continued on a routine basis. The annual air samples and radiation and contamination surveys of the contairment building
.are given in Table 1 of this-report.
IV.
RADIATION AND CONTAMINATION Radiation and contamination surveys of the facility indicate the levels in all cases were well below the limits for any safety concern.
t


VBWR Annual Report No. 21 V. ORGANIZATION There were no changes in organization.
VBWR Annual Report No. 21 V.
VI. CONCUJSION In our coinion, the deactivated Vallecitos Boiling Water Reactor continues to
ORGANIZATION There were no changes in organization.
                ~
VI.
CONCUJSION In our coinion, the deactivated Vallecitos Boiling Water Reactor continues to
~
be maintained in a safe condition, commensurate with its shutdown status. The-methods of inspection and control of safety-related items ensure maximum protection for the public'and the General Electric Company.
be maintained in a safe condition, commensurate with its shutdown status. The-methods of inspection and control of safety-related items ensure maximum protection for the public'and the General Electric Company.
GENERAL EL TRIC COMPANY Irradia       Proces ng Operation M
GENERAL EL TRIC COMPANY Irradia Proces ng Operation BY M
                                                                  ~
~
BY gri W. Tit'us, Manager Reactor Operations & Support Services 2
gri W. Tit'us, Manager Reactor Operations & Support Services 2


                                                                                                        .a .
.a TABLE 1.
TABLE 1. Radiation and Contamination Report           ,g, Contamination Levels Radiation       Surface Smears             Airborne Levels         Beta-Gamma **           Beta-Gamma (mR/h Gamma)   (c/m/100 cmz x 103)     (uCi/cc x 10 10)
Radiation and Contamination Report
Reactor Enclosure                         12/84   12/85     12/84   12/85       12/84     12/85 Main Floor - General Field                 <1       <1       <0.1     1.2         0.011*     0.069*
,g, Contamination Levels Radiation Surface Smears Airborne Levels Beta-Gamma **
: 1. Top of Missile Shield, Field       <1       <1       <0.1       .6         NA         NA
Beta-Gamma (mR/h Gamma)
: 2. Top of Spent Fuel Pit cover             1     <1       <0.1 -     .3         NA         NA
(c/m/100 cmz x 103)
: 3. Pit (Down 3 ft)                         1.5     1.0     0.2     9.0         NA         NA Reactor Basement
(uCi/cc x 10 10)
: 1. Upper Level, Field                 15       15       NA     NA           NA         NA
Reactor Enclosure 12/84 12/85 12/84 12/85 12/84 12/85 Main Floor - General Field
: 2. Bottom Wall, Ladder                 15       15       0.25   2. 5 '       NA         NA
<1
: 3. East Ladder, Bottom                 10       10       <0.1     A.0         NA         NA
<1
: 4. West Ladder, Bottom                 25       25       <0.1     0.6         0.15*     0.11*
<0.1 1.2 0.011*
i   5. Between Recirculation Pumps         20       30       NA     NA           NA         NA (2 ft Off_ Deck) 6 .- RCP No. 1 Surface                   80       80       2.0   17.0         NA         NA
0.069*
: 7. RCP No. 2 Surface                   60       60       19.0   35.0         NA         NA
1.
: 8. Downcomers                           25       25       1.5     0.5         NA-       NA
Top of Missile Shield, Field
: 9. Downcomers Behind                   25       25       1.5     0.2         NA         NA Reactor Shield
<1
: 10. Main Stean Line                         7       5       1.0     0.5         NA         NA Enclosure Stack - Outside Surface           <1       <1       <0.1   <0.1           NA         NA Main Valve Pit Lines and~ Valves             <1       <1       <0.1   <0.1           NA         NA NA indicates readings not taken or not analyzed.
<1
    *24-hour decay.
<0.1
  **For conversion to d/m assume an instrument efficiency of 20%.
.6 NA NA 2.
Top of Spent Fuel Pit cover 1
<1
<0.1 -
.3 NA NA 3.
Pit (Down 3 ft) 1.5 1.0 0.2 9.0 NA NA Reactor Basement 1.
Upper Level, Field 15 15 NA NA NA NA 2.
Bottom Wall, Ladder 15 15 0.25
: 2. 5 '
NA NA 3.
East Ladder, Bottom 10 10
<0.1 A.0 NA NA 4.
West Ladder, Bottom 25 25
<0.1 0.6 0.15*
0.11*
i 5.
Between Recirculation Pumps 20 30 NA NA NA NA (2 ft Off_ Deck) 6.- RCP No. 1 Surface 80 80 2.0 17.0 NA NA 7.
RCP No. 2 Surface 60 60 19.0 35.0 NA NA 8.
Downcomers 25 25 1.5 0.5 NA-NA 9.
Downcomers Behind 25 25 1.5 0.2 NA NA Reactor Shield
: 10. Main Stean Line 7
5 1.0 0.5 NA NA Enclosure Stack - Outside Surface
<1
<1
<0.1
<0.1 NA NA Main Valve Pit Lines and~ Valves
<1
<1
<0.1
<0.1 NA NA NA indicates readings not taken or not analyzed.
*24-hour decay.
**For conversion to d/m assume an instrument efficiency of 20%.
NOTE: Radiation levels, surface smears and air samples will vary from survey to survey as they are taken in general areas rather than at specific locations.
NOTE: Radiation levels, surface smears and air samples will vary from survey to survey as they are taken in general areas rather than at specific locations.
                                                        -3 .
-3.


F GENERAL $ ELECTRIC wucuAR ENERGY BUSMSs OMADONs GENERAL ELECTWC COMPANY e VALLECTOs NUCLEAR CENTER
F GENERAL $ ELECTRIC wucuAR ENERGY BUSMSs OMADONs GENERAL ELECTWC COMPANY e VALLECTOs NUCLEAR CENTER
* PLEAsANTON, CAUFORNIA 94566 March 25,.1986
* PLEAsANTON, CAUFORNIA 94566 March 25,.1986 Dr. H. R. Denton, Director
                ~
~
Dr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555


==Reference:==
==Reference:==
Line 76: Line 113:


==Dear Dr. Denton:==
==Dear Dr. Denton:==
Enclosed are three signed and' nineteen confomed copies of Annual Report No. 21 for the Vallecitos Boiling Water Reactor (Deactivated).
Enclosed are three signed and' nineteen confomed copies of Annual Report No. 21 for the Vallecitos Boiling Water Reactor (Deactivated).
Sincerely, bf G. E. Cunning am Senior Licensing Engineer (415)862-4330
Sincerely, bf G. E. Cunning am Senior Licensing Engineer (415)862-4330
        /sjl t     Encls.
/sjl t
Encls.
9M
9M
<}}
<}}

Latest revision as of 15:34, 7 December 2024

BWR Annual Rept 21 (Deactivated)
ML20205K879
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 12/31/1985
From: Cunningham G, Titus G
GENERAL ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8604020626
Download: ML20205K879 (5)


Text

,__

4

^

VALLECITOS BOILING WATER REACTOR ANNUAL REPORT NO. 21 (DEACTIVATED)

LICENSE DPR-I DOCKET 50-18 NUCLEAR TECHNOLOGIES & FUEL DIVISION e GENERAL ELECTRIC COMPANY VALLECITOS NUCLEAR CENTER, PLEASANTON, CALIFORNIA 94566 l

'M 6 8604020626 e5f.231 yB '

ADOCK O gDR L

't Vallecitos Boiling Water Reactor Annual Report No. 21 (Deactivated)

The status of the Vallecitos Boiling Water Reactor (VBWR) during the calendar year of 1985 is described in this twenty-first report of the deactivated facility in conformance with License DPR-1, Docket 50-18, Amendment 19, Paragraph 5.d.2.

I.

SUMMARY

The facility remained essentially in a static condition as described in Annual Report No. 20. Entry into the containment building was made for routine radiation surveys and for a check of general conditions throughout the building to verify the unchanged condition of the facility. The reactor vessel water level was monitored and remained essentially constant.

II.

STATUS OF THE FACILITY A.

Containment Building No changes were made during the report period.

B.

General Systems No changes were made during the report period.'

III.

PERIODIC INSPECTIONS Inspections of the facility were continued on a routine basis. The annual air samples and radiation and contamination surveys of the contairment building

.are given in Table 1 of this-report.

IV.

RADIATION AND CONTAMINATION Radiation and contamination surveys of the facility indicate the levels in all cases were well below the limits for any safety concern.

t

VBWR Annual Report No. 21 V.

ORGANIZATION There were no changes in organization.

VI.

CONCUJSION In our coinion, the deactivated Vallecitos Boiling Water Reactor continues to

~

be maintained in a safe condition, commensurate with its shutdown status. The-methods of inspection and control of safety-related items ensure maximum protection for the public'and the General Electric Company.

GENERAL EL TRIC COMPANY Irradia Proces ng Operation BY M

~

gri W. Tit'us, Manager Reactor Operations & Support Services 2

.a TABLE 1.

Radiation and Contamination Report

,g, Contamination Levels Radiation Surface Smears Airborne Levels Beta-Gamma **

Beta-Gamma (mR/h Gamma)

(c/m/100 cmz x 103)

(uCi/cc x 10 10)

Reactor Enclosure 12/84 12/85 12/84 12/85 12/84 12/85 Main Floor - General Field

<1

<1

<0.1 1.2 0.011*

0.069*

1.

Top of Missile Shield, Field

<1

<1

<0.1

.6 NA NA 2.

Top of Spent Fuel Pit cover 1

<1

<0.1 -

.3 NA NA 3.

Pit (Down 3 ft) 1.5 1.0 0.2 9.0 NA NA Reactor Basement 1.

Upper Level, Field 15 15 NA NA NA NA 2.

Bottom Wall, Ladder 15 15 0.25

2. 5 '

NA NA 3.

East Ladder, Bottom 10 10

<0.1 A.0 NA NA 4.

West Ladder, Bottom 25 25

<0.1 0.6 0.15*

0.11*

i 5.

Between Recirculation Pumps 20 30 NA NA NA NA (2 ft Off_ Deck) 6.- RCP No. 1 Surface 80 80 2.0 17.0 NA NA 7.

RCP No. 2 Surface 60 60 19.0 35.0 NA NA 8.

Downcomers 25 25 1.5 0.5 NA-NA 9.

Downcomers Behind 25 25 1.5 0.2 NA NA Reactor Shield

10. Main Stean Line 7

5 1.0 0.5 NA NA Enclosure Stack - Outside Surface

<1

<1

<0.1

<0.1 NA NA Main Valve Pit Lines and~ Valves

<1

<1

<0.1

<0.1 NA NA NA indicates readings not taken or not analyzed.

  • 24-hour decay.
    • For conversion to d/m assume an instrument efficiency of 20%.

NOTE: Radiation levels, surface smears and air samples will vary from survey to survey as they are taken in general areas rather than at specific locations.

-3.

F GENERAL $ ELECTRIC wucuAR ENERGY BUSMSs OMADONs GENERAL ELECTWC COMPANY e VALLECTOs NUCLEAR CENTER

  • PLEAsANTON, CAUFORNIA 94566 March 25,.1986 Dr. H. R. Denton, Director

~

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Reference:

~ License DPR-1, Docket 50-18

Dear Dr. Denton:

Enclosed are three signed and' nineteen confomed copies of Annual Report No. 21 for the Vallecitos Boiling Water Reactor (Deactivated).

Sincerely, bf G. E. Cunning am Senior Licensing Engineer (415)862-4330

/sjl t

Encls.

9M

<