s April 8, 1999 Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093                                                                                           '
s April 8, 1999 Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093


==SUBJECT:==
==SUBJECT:==
PROPRIETAP.Y REQUEST FOR ADDITIONAL INFORMATION - REVIEW GF "BWR VESSEL AND INTERNALS PROJECT, JET PUMP REPAIR DESIGN CRITERIA {BWRVIP-51)," TAC NO. MA1927                                                     i
PROPRIETAP.Y REQUEST FOR ADDITIONAL INFORMATION - REVIEW GF "BWR VESSEL AND INTERNALS PROJECT, JET PUMP REPAIR DESIGN CRITERIA {BWRVIP-51)," TAC NO. MA1927 i


==Dear Mr. Terry:==
==Dear Mr. Terry:==
 
By your application dated May 14,1998, you submitted for the NRC staff L review the Electric Power Research Institute (EPRI) proprietary report, "BWR Vessel and Internals Project, Jet Pump Repair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpon of supporting generic regulatory efforts related to the repair of the subject reactor com..ents.
By your application dated May 14,1998, you submitted for the NRC staff L review the Electric                 ;
e The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed request for additional information (RAl), the NRC staff has determined that additionalinformation is needed. We request that BWRVIP respond to the RAJ as soon as possible, in order for the NRC staff to complete its review in a timely manner. E ace the enclosed concerns a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary.
Power Research Institute (EPRI) proprietary report, "BWR Vessel and Internals Project, Jet Pump Repair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpon of supporting generic regulatory efforts related to the repair of the subject reactor come . .ents.
The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed request for additional information (RAl), the NRC staff has determined that additionalinformation is needed. We request that BWRVIP respond to the RAJ as soon as possible, in order for the NRC staff to complete its review in a timely manner. E ace the enclosed concerns a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary.
If you have any questions, please contact me at (301) 415-2169.
If you have any questions, please contact me at (301) 415-2169.
Sincerely,                                                 l l
Sincerely, l
Or31inal Signed Bv:
Or31inal Signed Bv:
C. E. Carpenter, Jr., Lead Project Manager Component integrity Section Materials and Chemical Engineering Branch             i Division of Engineering                               i Office of Nuclear Reactor Regulation                   f
C. E. Carpenter, Jr., Lead Project Manager Component integrity Section Materials and Chemical Engineering Branch i
Division of Engineering i
Office of Nuclear Reactor Regulation f


==Enclosure:==
==Enclosure:==
As stated                                                                                         i cc:       See next page Distritution:                                                                                                 i MCB R/F ICiwMh4di.
As stated i
KRWichman HFConrad GHolahan MEMayfield WLann;ng, R1 BMallet. R2 f
cc:
File Center                 KAKavanagh               TYChr.ig                   ;3 robe. R3 ACRS                         JRRajan                                             AHowell. R4           '/
See next page Distritution:
DOCUMENT NAME: G:\BWRVIP\BWRVIP51.RAI
i f
          !NDICATE IN BOX: "C"= COPY WlO ATTACHMENTENCLOSURE,"E"= COPY W/ATTENCL, *N"=NO COPY
MCB R/F KRWichman GHolahan WLann;ng, R1 ICiwMh4di.
                                                                                                              -    /h !
HFConrad MEMayfield BMallet. R2 File Center KAKavanagh TYChr.ig
j Office   EMC31PM           E   EMEB:SC   , E   EMCB:SLS         E                                 y     l KAMang Name    CECarpenterg                          RAHermann Date   I/ /d/1999 *           / /1999 h       y/ p/1999 p.,$                 OFFICIAL' RECORD COPY                                   f3 1b k ENCLOSURE IS PROPRIETARY                                                     4 b
;3 robe. R3
u'p           E tw w 9904140175 990408 PDR     TOPRP EXIEPRI                                         7                /
'/
c'                    l i
ACRS JRRajan AHowell. R4
c                          eor         -
/h DOCUMENT NAME: G:\\BWRVIP\\BWRVIP51.RAI
(3 oe,                           a u ,< q l
!NDICATE IN BOX: "C"= COPY WlO ATTACHMENTENCLOSURE,"E"= COPY W/ATTENCL, *N"=NO COPY j
Office EMC31PM E
EMEB:SC E
EMCB:SLS E
y Name CECarpenter KAMang RAHermann g
Date I/ /d/1999 *
/ /1999 h y/ p/1999 p.,$
OFFICIAL' RECORD COPY f
1b k 3
ENCLOSURE IS PROPRIETARY 4
u'p E tw w b
7 c'
9904140175 990408 PDR TOPRP EXIEPRI
/
i c
eor (3 oe, a
u,< q l


]
]
'I     Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093
'I Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093


==SUBJECT:==
==SUBJECT:==
Line 56: Line 72:


==Dear Mr. Terry:==
==Dear Mr. Terry:==
By your application dated May 14,1998, you submitted for the NRC staff to review the Elect /
By your application dated May 14,1998, you submitted for the NRC staff to review the Elect /
Pcwer Research Institute (EPRI) proprietary report, "BWR Vessel and internals Project, Jrd Pump Pepair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.
Pcwer Research Institute (EPRI) proprietary report, "BWR Vessel and internals Project, Jrd Pump Pepair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.
The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed reovest for additional information (RAl), the NRC staff has determined that additionalinforn" on is needed. We request that BWRVIP respond to the RAI as soon as possible, in t         or the NRC staff to complete its review in a timely manner. Since the enclosed con         .,s a report that the NRC staff has found to be proprietary in nature, the requested infoimation will also be considered proprietary.
The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed reovest for additional information (RAl), the NRC staff has determined that additionalinforn" on is needed. We request that BWRVIP respond to the RAI as soon as possible, in t or the NRC staff to complete its review in a timely manner. Since the enclosed con
.,s a report that the NRC staff has found to be proprietary in nature, the requested infoimation will also be considered proprietary.
If you have any questions, please contact me at (301) 415-2169.
If you have any questions, please contact me at (301) 415-2169.
Sincerely, Oriainal Signed Bv:
Sincerely, Oriainal Signed Bv:
C. E' Carpenter, Jr., [ead Project Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation Delosure: As stated cc:     See next page Distribution:
C. E' Carpenter, Jr., [ead Project Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation Delosure: As stated cc:
EMCB R/F                     KRWichman               GHolahan                   WLanning, R1 PUBLIC w/o Encl.             HFConrad                 MEMayfield                 BMallet, R2 File Center                   KAKavanagh               TYChang                   JGrobe, R3 ACRS                         JRRajan                                             AHowell, R4 DOCUMENT NAME: G:\BWRVIP\BWRVIP51.RAI INDICATE IN box:"C'mCOPY WrO ATTACHMENTIENCLOSURE,"E"* COPY WIATTIENCL, *N"mNo COPY Office   EMCB: LPM           E EM(B.SC f EMCB:SLS               E Name     CECarpenterg                          RAHermann KAMa %
See next page Distribution:
Date     V /d/1999
EMCB R/F KRWichman GHolahan WLanning, R1 PUBLIC w/o Encl.
                                          / /1999 h     j/ p/1999 pg                     OFFICIAL' RECORD COPY ENCLCEURE IS PROPRIETARY
HFConrad MEMayfield BMallet, R2 File Center KAKavanagh TYChang JGrobe, R3 ACRS JRRajan AHowell, R4 DOCUMENT NAME: G:\\BWRVIP\\BWRVIP51.RAI INDICATE IN box:"C'mCOPY WrO ATTACHMENTIENCLOSURE,"E"* COPY WIATTIENCL, *N"mNo COPY Office EMCB: LPM E
EM(B.SC f EMCB:SLS E
Name CECarpenter KAMa %
RAHermann g
Date V /d/1999
/ /1999 h j/ p/1999 pg OFFICIAL' RECORD COPY ENCLCEURE IS PROPRIETARY


a Ltr uq
a Ltruq
    )   >              *,                              UNITED STATES f               j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001
)
          '+,****+,o                                   April 8, 1999 Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093
UNITED STATES f
j NUCLEAR REGULATORY COMMISSION 3
WASHINGTON, D.C. 20666-0001
'+,****+,o April 8, 1999 Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093


==SUBJECT:==
==SUBJECT:==
Line 75: Line 99:


==Dear Mr. Terry:==
==Dear Mr. Terry:==
By your application dated May 14,1998, you submitted for the NRC staff to review the Electric Power Research institute (EPRI) proprietary report, "BWR Vessel and internals Project, Jet Pump Repair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.
By your application dated May 14,1998, you submitted for the NRC staff to review the Electric Power Research institute (EPRI) proprietary report, "BWR Vessel and internals Project, Jet Pump Repair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.
The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed request for additionalinformation (RAl), the NRC staff has determined that add:'.ionalinformation is needed. We request that BWRVIP respond to the RAI as soon as por sible, in order for the NRC staff to complete its review in a timely manrier. Since the enclosed concerns a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary.                                   "
The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed request for additionalinformation (RAl), the NRC staff has determined that add:'.ionalinformation is needed. We request that BWRVIP respond to the RAI as soon as por sible, in order for the NRC staff to complete its review in a timely manrier. Since the enclosed concerns a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary.
If you have any questions, please contact me at (301) 415-2169.
If you have any questions, please contact me at (301) 415-2169.
Sincerely, w       /
Sincerely, w
C. E. Carpenter, Jr.,   ad Project Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
/
                                                                                                            )'
C. E. Carpenter, Jr.,
ad Project Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering
)
Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc:     See next page                                                                         i 1
As stated cc:
ENCLOSURE IS PF'NIETARY l
See next page i
1 ENCLOSURE IS PF'NIETARY l
x i
x i
L                                                                                                         l
l L


      . .o I
.o I
i         cc:
i cc:
Karl W. Singer, Executive Chair     Steve Lewis, Technical Chairman BWRVIP Assessment Task               BWRVIP Assessment Task Tennessee Valley Authority           Entergy PO Box 2000                         P. O. Box 756 Decaltur, AL 35602 2000             Waterloo Road Port Gibson, MS 39150 Bill Eaton, Executive Chair inspection Committee               Carl Larsen, Technical Chairman Entergy Operations, Inc.               BWRVIP Inspection Task PO Box 756, Waterloo Rd             Yankee Atomic -
Karl W. Singer, Executive Chair Steve Lewis, Technical Chairman BWRVIP Assessment Task BWRVIP Assessment Task Tennessee Valley Authority Entergy PO Box 2000 P. O. Box 756 Decaltur, AL 35602 2000 Waterloo Road Port Gibson, MS 39150 Bill Eaton, Executive Chair inspection Committee Carl Larsen, Technical Chairman Entergy Operations, Inc.
Port Gibson, MS 39150-0756           580 Main Streat Bolton, MA 05740 H. Lewis Sumner, Executive Chairman BWRVIP Mitigation Task           John Wilson, Technical Chairman Southern Nuclear Operating Co.         BWRVIP Mitigation Task M/S BIN B051, PO Box 1295             Clinton Power Station, M/C T-31C 40 Inverness Center Parkway           P.O. Box 678 Birmingham, AL 35201                 Clinton,IL 61727 Harry P. Salmon, Executive Chairman   Vaughn Wagoner, Technical Chairman BWRVIP Integration Task             BWRVIP Integration Task New York Power Authority             Carolina Power & Light Company 123 Main St., M/S 11 D               One Hannover Square 9C1 White Plains, NY 10601-3104         P.O. Box 1551 Raleigh, NC 27612 George T. Jones, Executive Chair BWRVIP Repair Task                 Bruce McLeod, Technical Chairman Pennsylvania Power & Light,Inc.       BWRVIP Repair Task M/S GEN A 61                         Southern Nuclear Operating Co.
BWRVIP Inspection Task PO Box 756, Waterloo Rd Yankee Atomic Port Gibson, MS 39150-0756 580 Main Streat Bolton, MA 05740 H. Lewis Sumner, Executive Chairman BWRVIP Mitigation Task John Wilson, Technical Chairman Southern Nuclear Operating Co.
2 N 9* Street                       Post Office Box 1295 Allentown, PA 18101-1139             40 Inverness Center Parkway Birmingham, AL 35201 Robert Carter, EPRI BWRVIP Assessment Manager                 Warren Bilanin, EPRI BWRVIP EPRI NDE Center                       Integration Manager P. O. Box 217097                     Raj Pathania, EPRI BWRVIP 1300 W. T. Harris Blvd.               Mitigation Manager Charlotte, NC 28221                 Ken Wolfe, EPRI BWRVIP Ropair Manager Greg Selby, EPRI BWRVIP             Electric Power Research Institute l           Inspection Manager                 P. O. Box 10412 EPRI NDE Center                     3412 Hillview Ave.
BWRVIP Mitigation Task M/S BIN B051, PO Box 1295 Clinton Power Station, M/C T-31C 40 Inverness Center Parkway P.O. Box 678 Birmingham, AL 35201 Clinton,IL 61727 Harry P. Salmon, Executive Chairman Vaughn Wagoner, Technical Chairman BWRVIP Integration Task BWRVIP Integration Task New York Power Authority Carolina Power & Light Company 123 Main St., M/S 11 D One Hannover Square 9C1 White Plains, NY 10601-3104 P.O. Box 1551 Raleigh, NC 27612 George T. Jones, Executive Chair BWRVIP Repair Task Bruce McLeod, Technical Chairman Pennsylvania Power & Light,Inc.
P. O. Box 217097                     Palo Alto, CA 94303 1300 W. T. Harris Blvd.
BWRVIP Repair Task M/S GEN A 61 Southern Nuclear Operating Co.
Charlotte, NC 28221 '               James P. Pelletier, BWRVIP Liaison to EPRI Nuclear Power Council Joe Hagan, BWRVIP Vice Chairman     Nebraska Public Power District PEPCO Energy Co.                     1200 Prospect Avenue MC 62C-3                             PO Box 98 965 Chesterbrook Blvd               Brownville, NE 60321-0098 Wayne, PA 19807-5691
2 N 9* Street Post Office Box 1295 Allentown, PA 18101-1139 40 Inverness Center Parkway Birmingham, AL 35201 Robert Carter, EPRI BWRVIP Assessment Manager Warren Bilanin, EPRI BWRVIP EPRI NDE Center Integration Manager P. O. Box 217097 Raj Pathania, EPRI BWRVIP 1300 W. T. Harris Blvd.
                                                                                    .}}
Mitigation Manager Charlotte, NC 28221 Ken Wolfe, EPRI BWRVIP Ropair Manager Greg Selby, EPRI BWRVIP Electric Power Research Institute l
Inspection Manager P. O. Box 10412 EPRI NDE Center 3412 Hillview Ave.
P. O. Box 217097 Palo Alto, CA 94303 1300 W. T. Harris Blvd.
Charlotte, NC 28221 '
James P. Pelletier, BWRVIP Liaison to EPRI Nuclear Power Council Joe Hagan, BWRVIP Vice Chairman Nebraska Public Power District PEPCO Energy Co.
1200 Prospect Avenue MC 62C-3 PO Box 98 965 Chesterbrook Blvd Brownville, NE 60321-0098 Wayne, PA 19807-5691
.}}

Latest revision as of 15:31, 7 December 2024

Forwards Proprietary Request for Addl Info Re Util 980514 Application Submitting for NRC Review EPRI Proprietary Rept, BWR Vessel & Internals Project,Jet Pump Repair Design Criteria (BWRVIP-51). Encl Withheld
ML20205L193
Person / Time
Issue date: 04/08/1999
From: Carpenter C
NRC (Affiliation Not Assigned)
To: Terry C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20137H804 List:
References
TAC-MA1927, NUDOCS 9904140175
Download: ML20205L193 (4)


Text

'

}

s April 8, 1999 Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

PROPRIETAP.Y REQUEST FOR ADDITIONAL INFORMATION - REVIEW GF "BWR VESSEL AND INTERNALS PROJECT, JET PUMP REPAIR DESIGN CRITERIA {BWRVIP-51)," TAC NO. MA1927 i

Dear Mr. Terry:

By your application dated May 14,1998, you submitted for the NRC staff L review the Electric Power Research Institute (EPRI) proprietary report, "BWR Vessel and Internals Project, Jet Pump Repair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpon of supporting generic regulatory efforts related to the repair of the subject reactor com..ents.

e The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed request for additional information (RAl), the NRC staff has determined that additionalinformation is needed. We request that BWRVIP respond to the RAJ as soon as possible, in order for the NRC staff to complete its review in a timely manner. E ace the enclosed concerns a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary.

If you have any questions, please contact me at (301) 415-2169.

Sincerely, l

Or31inal Signed Bv:

C. E. Carpenter, Jr., Lead Project Manager Component integrity Section Materials and Chemical Engineering Branch i

Division of Engineering i

Office of Nuclear Reactor Regulation f

Enclosure:

As stated i

cc:

See next page Distritution:

i f

MCB R/F KRWichman GHolahan WLann;ng, R1 ICiwMh4di.

HFConrad MEMayfield BMallet. R2 File Center KAKavanagh TYChr.ig

3 robe. R3

'/

ACRS JRRajan AHowell. R4

/h DOCUMENT NAME: G:\\BWRVIP\\BWRVIP51.RAI

!NDICATE IN BOX: "C"= COPY WlO ATTACHMENTENCLOSURE,"E"= COPY W/ATTENCL, *N"=NO COPY j

Office EMC31PM E

EMEB:SC E

EMCB:SLS E

y Name CECarpenter KAMang RAHermann g

Date I/ /d/1999 *

/ /1999 h y/ p/1999 p.,$

OFFICIAL' RECORD COPY f

1b k 3

ENCLOSURE IS PROPRIETARY 4

u'p E tw w b

7 c'

9904140175 990408 PDR TOPRP EXIEPRI

/

i c

eor (3 oe, a

u,< q l

]

'I Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

PROPRIETARY REQUEST FOR ADDITIONAL INFORMATION - REVIEW OF "BWR VESSEL AND INTERNALS PROJECT, JET PUMP REPAIR DESIGN CRITERIA (BWRVIP-51)," TAC NO. MA1927

Dear Mr. Terry:

By your application dated May 14,1998, you submitted for the NRC staff to review the Elect /

Pcwer Research Institute (EPRI) proprietary report, "BWR Vessel and internals Project, Jrd Pump Pepair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.

The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed reovest for additional information (RAl), the NRC staff has determined that additionalinforn" on is needed. We request that BWRVIP respond to the RAI as soon as possible, in t or the NRC staff to complete its review in a timely manner. Since the enclosed con

.,s a report that the NRC staff has found to be proprietary in nature, the requested infoimation will also be considered proprietary.

If you have any questions, please contact me at (301) 415-2169.

Sincerely, Oriainal Signed Bv:

C. E' Carpenter, Jr., [ead Project Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation Delosure: As stated cc:

See next page Distribution:

EMCB R/F KRWichman GHolahan WLanning, R1 PUBLIC w/o Encl.

HFConrad MEMayfield BMallet, R2 File Center KAKavanagh TYChang JGrobe, R3 ACRS JRRajan AHowell, R4 DOCUMENT NAME: G:\\BWRVIP\\BWRVIP51.RAI INDICATE IN box:"C'mCOPY WrO ATTACHMENTIENCLOSURE,"E"* COPY WIATTIENCL, *N"mNo COPY Office EMCB: LPM E

EM(B.SC f EMCB:SLS E

Name CECarpenter KAMa %

RAHermann g

Date V /d/1999

/ /1999 h j/ p/1999 pg OFFICIAL' RECORD COPY ENCLCEURE IS PROPRIETARY

a Ltruq

)

UNITED STATES f

j NUCLEAR REGULATORY COMMISSION 3

WASHINGTON, D.C. 20666-0001

'+,****+,o April 8, 1999 Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

PROPRIETARY REQUEST FOR ADDITIONAL INFORMATION - REVIEW OF "BWR VESSEL AND INTERNALS PROJECT, JET PUMP REPAIR DESIGN CRITERIA (BWRVIP-51)," TAC NO. MA1927

Dear Mr. Terry:

By your application dated May 14,1998, you submitted for the NRC staff to review the Electric Power Research institute (EPRI) proprietary report, "BWR Vessel and internals Project, Jet Pump Repair Design Criteria (BWRVIP-51)," EPRI Report TR-108718, May 1998. The BWRVIP-51 report was submitted as a means of exchanging information with the staff for the purpose of supporting generic regulatory efforts related to the repair of the subject reactor components.

The NRC staff has completed its preliminary review of the BWRVIP-51 report. As indicated in the enclosed request for additionalinformation (RAl), the NRC staff has determined that add:'.ionalinformation is needed. We request that BWRVIP respond to the RAI as soon as por sible, in order for the NRC staff to complete its review in a timely manrier. Since the enclosed concerns a report that the NRC staff has found to be proprietary in nature, the requested information will also be considered proprietary.

If you have any questions, please contact me at (301) 415-2169.

Sincerely, w

/

C. E. Carpenter, Jr.,

ad Project Manager Component Integrity Section Materials and Chemical Engineering Branch Division of Engineering

)

Office of Nuclear Reactor Regulation

Enclosure:

As stated cc:

See next page i

1 ENCLOSURE IS PF'NIETARY l

x i

l L

.o I

i cc:

Karl W. Singer, Executive Chair Steve Lewis, Technical Chairman BWRVIP Assessment Task BWRVIP Assessment Task Tennessee Valley Authority Entergy PO Box 2000 P. O. Box 756 Decaltur, AL 35602 2000 Waterloo Road Port Gibson, MS 39150 Bill Eaton, Executive Chair inspection Committee Carl Larsen, Technical Chairman Entergy Operations, Inc.

BWRVIP Inspection Task PO Box 756, Waterloo Rd Yankee Atomic Port Gibson, MS 39150-0756 580 Main Streat Bolton, MA 05740 H. Lewis Sumner, Executive Chairman BWRVIP Mitigation Task John Wilson, Technical Chairman Southern Nuclear Operating Co.

BWRVIP Mitigation Task M/S BIN B051, PO Box 1295 Clinton Power Station, M/C T-31C 40 Inverness Center Parkway P.O. Box 678 Birmingham, AL 35201 Clinton,IL 61727 Harry P. Salmon, Executive Chairman Vaughn Wagoner, Technical Chairman BWRVIP Integration Task BWRVIP Integration Task New York Power Authority Carolina Power & Light Company 123 Main St., M/S 11 D One Hannover Square 9C1 White Plains, NY 10601-3104 P.O. Box 1551 Raleigh, NC 27612 George T. Jones, Executive Chair BWRVIP Repair Task Bruce McLeod, Technical Chairman Pennsylvania Power & Light,Inc.

BWRVIP Repair Task M/S GEN A 61 Southern Nuclear Operating Co.

2 N 9* Street Post Office Box 1295 Allentown, PA 18101-1139 40 Inverness Center Parkway Birmingham, AL 35201 Robert Carter, EPRI BWRVIP Assessment Manager Warren Bilanin, EPRI BWRVIP EPRI NDE Center Integration Manager P. O. Box 217097 Raj Pathania, EPRI BWRVIP 1300 W. T. Harris Blvd.

Mitigation Manager Charlotte, NC 28221 Ken Wolfe, EPRI BWRVIP Ropair Manager Greg Selby, EPRI BWRVIP Electric Power Research Institute l

Inspection Manager P. O. Box 10412 EPRI NDE Center 3412 Hillview Ave.

P. O. Box 217097 Palo Alto, CA 94303 1300 W. T. Harris Blvd.

Charlotte, NC 28221 '

James P. Pelletier, BWRVIP Liaison to EPRI Nuclear Power Council Joe Hagan, BWRVIP Vice Chairman Nebraska Public Power District PEPCO Energy Co.

1200 Prospect Avenue MC 62C-3 PO Box 98 965 Chesterbrook Blvd Brownville, NE 60321-0098 Wayne, PA 19807-5691

.