ML20207N259: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:- -
{{#Wiki_filter:- -
j$ 1 E MEMORANDUM FOR:       Chairman Zech                 ,              AE0D/C605 Comissioner Roberts       -
j$ 1 E MEMORANDUM FOR:
Comissioner Asselstine Comissioner Bernthal Comissioner Carr FROM:                 Victor Stello, Jr.
Chairman Zech AE0D/C605 Comissioner Roberts Comissioner Asselstine Comissioner Bernthal Comissioner Carr FROM:
Victor Stello, Jr.
Executive Director for Operations
Executive Director for Operations


==SUBJECT:==
==SUBJECT:==
CASE STUDY REPORT - OPERATIONAL EXPERIENCE
CASE STUDY REPORT - OPERATIONAL EXPERIENCE
                                  -INVOLVING LOSSES OF ELECTRICAL INVERTERS Enclosed for your information is a copy of the final AE0D case study report on operational experience involving losses of electrical inverters. The study was initiated based on the observation of a lack of overall industry-wide improvement in the operational performance of these devices and the operational data which show that inverter losses can result in plant transients and/or the malfunctioning of safety-related and other important plant equipment. The primary focus of the study was to identify the principal contributing causes for the occurrence of inverter loss events.
-INVOLVING LOSSES OF ELECTRICAL INVERTERS Enclosed for your information is a copy of the final AE0D case study report on operational experience involving losses of electrical inverters.
The study was initiated based on the observation of a lack of overall industry-wide improvement in the operational performance of these devices and the operational data which show that inverter losses can result in plant transients and/or the malfunctioning of safety-related and other important plant equipment. The primary focus of the study was to identify the principal contributing causes for the occurrence of inverter loss events.
The enclosed report documents AE0D's findings, conclusions, and recommendations resulting from the study and reflects the results of the peer review process.
The enclosed report documents AE0D's findings, conclusions, and recommendations resulting from the study and reflects the results of the peer review process.
The AE0D report has been forwarded to NRR and IE for appropriate action, and to RES and the Regions, INP0, and NSAC for information.
The AE0D report has been forwarded to NRR and IE for appropriate action, and to RES and the Regions, INP0, and NSAC for information.
Line 32: Line 34:


==Enclosure:==
==Enclosure:==
 
As stated cc w/ enclosure:
As stated cc w/ enclosure:                             Distribution:
Distribution:
SECY                                         POR                 J. Heltemes OGC                                           AE0D CF             F. Hebdon ACRS                                         AE0D SF             S. Rubin ROAB CF             M. Chiramal ROAB SF             F. Ashe V. Stello           M. Williams J. Roe             K. Black
SECY POR J. Heltemes OGC AE0D CF F. Hebdon ACRS AE0D SF S. Rubin ROAB CF M. Chiramal ROAB SF F. Ashe V. Stello M. Williams
((jl24oo84e[jD ORo     g                               T. Rehm             W. Lanning PDa                       J. Sniezek EDO R/F OFC : AEOD ROAB     : AEOD:ROA8     AEOD         : AE00 DD       :    AEOD:D     :  EDO   :
((jl24oo84e[jD J. Roe K. Black ORo g
_ _ _ _ _ : _ _ _ L A:t____: ________
T. Rehm W. Lanning PDa J. Sniezek EDO R/F OFC : AEOD ROAB
:          b :______:ROAB
: AEOD:ROA8 AEOD
______:____    ,____:__      p_____:____________:___________
: AE00 DD AEOD:D EDO
NAME : FAshe:cg     : MChiramal   :  SRubin SPf7.               : CJ   ltemes : VStello   :
_ _ _ _ _ : _ _ _ L A:t____: ________ b :______:ROAB p_____:____________:___________
_____:____________:-___________._________         ,          %___ __FHebdon DATE : 12/is/86     : 12/81/86     : 12//T/86     :  12/31/86 : 12/31 /86       : 12/ /86 :
NAME : FAshe:cg
0FFICIAL RECORD COPY
: MChiramal SRubin SPf7.
                                                                                                --  _ .-   _}}
: CJ ltemes : VStello
_____:____________:-___________._________ %___ __FHebdon 12//T/86 DATE : 12/is/86
: 12/81/86 12/31/86 : 12/31 /86
: 12/ /86 0FFICIAL RECORD COPY
.-}}

Latest revision as of 20:13, 6 December 2024

Forwards AEOD Case Study Rept, Operational Experience Involving Losses of Electrical Inverters. Primary Focus of Study to Identify Principal Contributing Causes for Occurrence of Inverter Loss Events
ML20207N259
Person / Time
Issue date: 01/12/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Roberts, Zech
NRC COMMISSION (OCM)
Shared Package
ML18041A146 List:
References
AEOD-C605, NUDOCS 8701140084
Download: ML20207N259 (1)


Text

- -

j$ 1 E MEMORANDUM FOR:

Chairman Zech AE0D/C605 Comissioner Roberts Comissioner Asselstine Comissioner Bernthal Comissioner Carr FROM:

Victor Stello, Jr.

Executive Director for Operations

SUBJECT:

CASE STUDY REPORT - OPERATIONAL EXPERIENCE

-INVOLVING LOSSES OF ELECTRICAL INVERTERS Enclosed for your information is a copy of the final AE0D case study report on operational experience involving losses of electrical inverters.

The study was initiated based on the observation of a lack of overall industry-wide improvement in the operational performance of these devices and the operational data which show that inverter losses can result in plant transients and/or the malfunctioning of safety-related and other important plant equipment. The primary focus of the study was to identify the principal contributing causes for the occurrence of inverter loss events.

The enclosed report documents AE0D's findings, conclusions, and recommendations resulting from the study and reflects the results of the peer review process.

The AE0D report has been forwarded to NRR and IE for appropriate action, and to RES and the Regions, INP0, and NSAC for information.

I would be pleased to provide any clarification or further information that you may desire.

Victor Stello, Jr.

Executive Director for Operations

Enclosure:

As stated cc w/ enclosure:

Distribution:

SECY POR J. Heltemes OGC AE0D CF F. Hebdon ACRS AE0D SF S. Rubin ROAB CF M. Chiramal ROAB SF F. Ashe V. Stello M. Williams

((jl24oo84e[jD J. Roe K. Black ORo g

T. Rehm W. Lanning PDa J. Sniezek EDO R/F OFC : AEOD ROAB

AEOD:ROA8 AEOD
AE00 DD AEOD:D EDO

_ _ _ _ _ : _ _ _ L A:t____: ________ b :______:ROAB p_____:____________:___________

NAME : FAshe:cg

MChiramal SRubin SPf7.
CJ ltemes : VStello

_____:____________:-___________._________ %___ __FHebdon 12//T/86 DATE : 12/is/86

12/81/86 12/31/86 : 12/31 /86
12/ /86 0FFICIAL RECORD COPY

.-