                                                              August 2,1999
August 2,1999
          Mr. Oliver D. Kingsley
Mr. Oliver D. Kingsley
          - President, Nuclear Generation Group
- President, Nuclear Generation Group
          Commonwealth Edison Company
Commonwealth Edison Company
          ATTN: Regulatory Services
ATTN: Regulatory Services
          Executive Towers West til
Executive Towers West til
            1400 Opus Place, Suite 500
1400 Opus Place, Suite 500
          Downers Grove,IL 60515
Downers Grove,IL 60515
                                                                                                                                      i
i
          SUBJECT:           NRC INSPECTION REPORT 50-10/99013(DNMS)
SUBJECT:
          Dear Mr. Kingsley:
NRC INSPECTION REPORT 50-10/99013(DNMS)
          On July 27,1999, the NRC completed an inspection at your Dresden Unit 1 Station which
Dear Mr. Kingsley:
          examined decommissioning activities. The enclosed report presents the results of that
On July 27,1999, the NRC completed an inspection at your Dresden Unit 1 Station which
          inspection.
examined decommissioning activities. The enclosed report presents the results of that
          During the 4 week period covered by this inspection, activities in the areas of facility
inspection.
          management and control and radiological safety were examined. No safety or regulatory
During the 4 week period covered by this inspection, activities in the areas of facility
          issues were identified. Overall, the performance of the reactor decommissioning program was
management and control and radiological safety were examined. No safety or regulatory
          adequate,
issues were identified. Overall, the performance of the reactor decommissioning program was
            in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
adequate,
          enclosure will be placed in the NRC Public Document Room.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
                                                                      Sincerely,
enclosure will be placed in the NRC Public Document Room.
              .
Sincerely,
                                                                        /s/BruceL.Jorgensen
.
                                                                      Bruce L. Jorgensen, Chief                                       '
/s/BruceL.Jorgensen
                                                                      Decommissioning Branch
Bruce L. Jorgensen, Chief
            Docket No. 50-10
'
            License No. DPR-2                                                                                                 l
Decommissioning Branch
                                                                                                                                      l
Docket No. 50-10
            Enclosure:         Inspection Report 50-10/99013(DNMS)                                                                   l
License No. DPR-2
                                                                                                                                      !
l
            See Attached Distribution                                                                                                 l
Enclosure:
            DOCUMENT NAME: G:\SEC\DRE99013.DNM
Inspection Report 50-10/99013(DNMS)
            To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure "E*= Copy with enclosure"N"= No copy
l
            OFFICE           Rllid               I t, Rlll A2)             lCI                       l                       l
See Attached Distribution
            NAME         f@!Ine'I6dp                     Jorg(dhen
DOCUMENT NAME: G:\\SEC\\DRE99013.DNM
                            '
To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure "E*= Copy with enclosure"N"= No copy
            DATE              0$/3 /b9                     08/ >/99'                                                             ..
OFFICE
                                                        ^ FlCIAL RECORD COPY
Rllid
    990809'OO4T) ^990802
I t, Rlll A2)
    PDR   ADOCK 05000010
lCI
    0                         PDR
l
l
NAME
f@!Ine'I6dp
Jorg(dhen
DATE
'
0$/3 /b9
08/ >/99'
..
^ FlCIAL RECORD COPY
990809'OO4T) ^990802
PDR
ADOCK 05000010
0
PDR


r
r
    *
*
  .
.
      O. Kingsley                                     -2-
O. Kingsley
      cc w/ encl:     R. P. Tuetken, General Manager,
-2-
                      Decommissioning Projects and Services
cc w/ encl:
                      K. A. Ainger, Director of Dresden 1 and
R. P. Tuetken, General Manager,
                      Zion Decommissioning and Licensing
Decommissioning Projects and Services
                      H. Stanley, PWR Vice President
K. A. Ainger, Director of Dresden 1 and
                      C. M. Crane, BWR Vice President
Zion Decommissioning and Licensing
                      D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
                      R. Krich, Vice President, Regulatory Services
C. M. Crane, BWR Vice President
                      DCD - Licensing
D. Helwig, Senior Vice President
                      P. Planing, Decommissioning Plant Manager
R. Krich, Vice President, Regulatory Services
                      J. M. Heffley, Site Vice President
DCD - Licensing
                      D. Ambler, Regulatory Assurance Manager
P. Planing, Decommissioning Plant Manager
                      M. Aguilar, Assistant Attomey General
J. M. Heffley, Site Vice President
                      State Liaison Officer
D. Ambler, Regulatory Assurance Manager
                      Chairman, Illinois Commerce Commission
M. Aguilar, Assistant Attomey General
      Distribution:
State Liaison Officer
      Docket File w/ encl'
Chairman, Illinois Commerce Commission
      PUBLIC IE-01 w/ encl
Distribution:
      Rlli PRR w/ encl
Docket File w/ encl'
      S. Weiss, NRR w/encI
PUBLIC IE-01 w/ encl
      M. Masnik, NRR w/enct
Rlli PRR w/ encl
      SAR, NRR (e-mail)
S. Weiss, NRR w/encI
      LPM, NRR w/encI
M. Masnik, NRR w/enct
      J. L. Caldwell, Rlli w/ encl
SAR, NRR (e-mail)
      C. D. Pederson, Rlli w/enci
LPM, NRR w/encI
      Rlli Enf. Coordinator w/ encl
J. L. Caldwell, Rlli w/ encl
      SRI, Dresden w/enci .-
C. D. Pederson, Rlli w/enci
      IEO (e-mail)
Rlli Enf. Coordinator w/ encl
      DOCDESK (e-mail)-
SRI, Dresden w/enci .-
      Greens w/o encl
IEO (e-mail)
DOCDESK (e-mail)-
Greens w/o encl
i
i
!
!
L
L
l
l
                                                                    '
b
b
'
}}
}}

Latest revision as of 02:17, 6 December 2024

Forwards Insp Rept 50-010/99-13 on 990702-27.No Violations Noted.Insp Examined Activities in Areas of Facility Management & Control & Radiological Safety
ML20210L106
Person / Time
Site: Dresden 
Issue date: 08/02/1999
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20210L111 List:
References
50-010-99-13, NUDOCS 9908090040
Download: ML20210L106 (2)


See also: IR 05000010/1999013

Text

"

...

August 2,1999

Mr. Oliver D. Kingsley

- President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West til

1400 Opus Place, Suite 500

Downers Grove,IL 60515

i

SUBJECT:

NRC INSPECTION REPORT 50-10/99013(DNMS)

Dear Mr. Kingsley:

On July 27,1999, the NRC completed an inspection at your Dresden Unit 1 Station which

examined decommissioning activities. The enclosed report presents the results of that

inspection.

During the 4 week period covered by this inspection, activities in the areas of facility

management and control and radiological safety were examined. No safety or regulatory

issues were identified. Overall, the performance of the reactor decommissioning program was

adequate,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

.

/s/BruceL.Jorgensen

Bruce L. Jorgensen, Chief

'

Decommissioning Branch

Docket No. 50-10

License No. DPR-2

l

Enclosure:

Inspection Report 50-10/99013(DNMS)

l

See Attached Distribution

DOCUMENT NAME: G:\\SEC\\DRE99013.DNM

To receive a copy of this document, Indicate in the box:"C" = Copy without enclosure "E*= Copy with enclosure"N"= No copy

OFFICE

Rllid

I t, Rlll A2)

lCI

l

l

NAME

f@!Ine'I6dp

Jorg(dhen

DATE

'

0$/3 /b9

08/ >/99'

..

^ FlCIAL RECORD COPY

990809'OO4T) ^990802

PDR

ADOCK 05000010

0

PDR

r

.

O. Kingsley

-2-

cc w/ encl:

R. P. Tuetken, General Manager,

Decommissioning Projects and Services

K. A. Ainger, Director of Dresden 1 and

Zion Decommissioning and Licensing

H. Stanley, PWR Vice President

C. M. Crane, BWR Vice President

D. Helwig, Senior Vice President

R. Krich, Vice President, Regulatory Services

DCD - Licensing

P. Planing, Decommissioning Plant Manager

J. M. Heffley, Site Vice President

D. Ambler, Regulatory Assurance Manager

M. Aguilar, Assistant Attomey General

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/ encl'

PUBLIC IE-01 w/ encl

Rlli PRR w/ encl

S. Weiss, NRR w/encI

M. Masnik, NRR w/enct

SAR, NRR (e-mail)

LPM, NRR w/encI

J. L. Caldwell, Rlli w/ encl

C. D. Pederson, Rlli w/enci

Rlli Enf. Coordinator w/ encl

SRI, Dresden w/enci .-

IEO (e-mail)

DOCDESK (e-mail)-

Greens w/o encl

i

!

L

l

b

'