ML20210Q759: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
August 27, 1997 MEMORANDUM T0:     Theodore R. Quay Director Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:               Thomas J. Kenyon, Project Manager                 original signed by:
August 27, 1997 MEMORANDUM T0:
Theodore R. Quay Director Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Thomas J. Kenyon, Project Manager original signed by:
Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation
Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS FIRE PROTECTION FOR THE AP600 DATE AND TIME:     September 4, 1997 - 8 a.m. . 11:30 a.m.
NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS FIRE PROTECTION FOR THE AP600 DATE AND TIME:
LOCATION:           U.S. Nuclear Regulatory Commission Two White Flint North
September 4, 1997 - 8 a.m.. 11:30 a.m.
                                                                                                                      )
LOCATION:
11555 Rockville Pike Rockville, Maryland 20852 Room T-10 Al PURPOSE:           To discuss fire protection issues on the AP600.               See attached agenda.
U.S. Nuclear Regulatory Commission Two White Flint North
PARTICIPANTS *:     tiRC                             WESTINGHOUSE T. liarsh                       J. Winters l                               T. Quay                         E. Cummins                                     ,
)
S. West E. Connell B. McIntyre D. Hutchings                           ig
11555 Rockville Pike Rockville, Maryland 20852 Room T-10 Al PURPOSE:
                                                                                                        })
To discuss fire protection issues on the AP600.
())
See attached agenda.
PARTICIPANTS *:
tiRC WESTINGHOUSE T. liarsh J. Winters l
T. Quay E. Cummins S. West B. McIntyre ig ())
E. Connell D. Hutchings
})
J. Holmes T. Kenyon, et al.
J. Holmes T. Kenyon, et al.
Docket No. 52-003                                                                           I i
Docket No. 52-003 I
i


==Attachment:==
==Attachment:==
Line 37: Line 45:
However, portions of this meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact me at (301) 415-1120.
However, portions of this meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact me at (301) 415-1120.
DISTRIBUTION:
DISTRIBUTION:
See next page Vi .lLILI ,11.1: ll DOCUMENT NAME: A:FP MTG.N0
See next page Vi.lLILI,11.1: ll DOCUMENT NAME: A:FP MTG.N0 t.
: t. .w.... ,.i #w *,.. ..v sc.. w ..Tw c . cop, .nsout m.ch w.new... r . co,, .nn .ti.csm.m.ncw... v . no ...,
.w....,.i #w *,....v sc.. w.T
OFFICE   PM:PDST;b$PM           D:PDST:DRPM                                               [                   l NAME     TJKenydn?tg             TRQuayfW DATE     08h6/97                 08/37/97 9709020134 970827 PDR   ADOCK 05200003 A                   .ppR
. w c. cop,.nsout m.ch w.new...
r. co,,.nn.ti.csm.m.ncw... v. no...,
OFFICE PM:PDST;b$PM D:PDST:DRPM
[
l NAME TJKenydn?tg TRQuayfW DATE 08h6/97 08/37/97 9709020134 970827 PDR ADOCK 05200003 A
.ppR


~.   ,
~.
Westinghouse Electric Corporation             Docket No. 52-003 cc: Mr. Nicholas J. Liparulo, Manager         Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis   U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation       19901 Germantown Road P.O. Box 355                             Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Russ Bell Mr. B. A. McIntyre                       Senior Project Manager, Programs Advanced Plant safety & Licensing       Nuclear Energy Institute Westinghouse Electric Corporation       1776 i Street, NW Energy Systems Business Unit             Suite 300 Box 355                                 Washington, DC 20006-3706 Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag                       Doc-Search Associates Advanced Plant Safety & Licensing       Post Office Box 34 Westinghouse Electric Corporation       Cabin John, MD 20818 Energy Systems Business Unit j           Box 355                                 Dr. Craig D. Sawyer, Manager
Westinghouse Electric Corporation Docket No. 52-003 cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Russ Bell Mr. B. A. McIntyre Senior Project Manager, Programs Advanced Plant safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 i Street, NW Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706 Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34 Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit j
/           Pittsburgh, PA 15230                     Advanced Reactor Programs GE Nuclear Energy
Box 355 Dr. Craig D. Sawyer, Manager
'          Mr. M. D. Beaumont                       175 Curtner Avenue, MC-754 Nuclear and Advanced Technology Division San Jose, CA 95125 Westinghouse Electric Corporation One Montrose Metro                       Mr. Robert H. Buchholz 11921 Rockville Pike                     GE Nuclear Energy Suite 350                               175 Curtner Avenue, MC-781 Rockville, MD 20852                     San Jose, CA 95125 Mr. Sterling Franks                     Barton Z. Cowan. Esq.
/
U.S. Department of Energy               Eckert Seamans Cherin & Hellott NE-50                                   600 Grant Street 42nd Floor 19901 Germantown Road                   Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro                         PWR Design Certification Nuclear Systems Analysis Technologies   Electric Power Research Institute Lockheed Idaho Technologies Company     3412 Hillview Avenue Post Office Box 1625                     Palo Alto, CA 94303 Idaho Falls. ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874
Pittsburgh, PA 15230 Advanced Reactor Programs GE Nuclear Energy
)
Mr. M. D. Beaumont 175 Curtner Avenue, MC-754 Nuclear and Advanced Technology Division San Jose, CA 95125 Westinghouse Electric Corporation One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan. Esq.
U.S. Department of Energy Eckert Seamans Cherin & Hellott NE-50 600 Grant Street 42nd Floor 19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification Nuclear Systems Analysis Technologies Electric Power Research Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls. ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874


DISCUSSION TOPICS FOR AUGUST 27, 1997 AP600 FIRE PROTECTION MEETING
DISCUSSION TOPICS FOR AUGUST 27, 1997 AP600 FIRE PROTECTION MEETING 1.
: 1.           Altornate or Dedicated Shutdown Capability                                   Westinghouse
Altornate or Dedicated Shutdown Capability Westinghouse 11.
: 11.         Enhanced Design Features to Achieve Cold Shutdown                             Westinghouse III. Options for Dedicated Fire Water Supply that can                                     Westinghouse Survive a Seismic Event                                                                                 ,
Enhanced Design Features to Achieve Cold Shutdown Westinghouse III. Options for Dedicated Fire Water Supply that can Westinghouse Survive a Seismic Event
                                                                                                                              )
)
IV.         Affect of Fire on Non-Safety-Related Shutdown                                 Westinghouse             !
IV.
Systems                                                                                               J l
Affect of Fire on Non-Safety-Related Shutdown Westinghouse Systems J
V.           Associated Circuits                                                           Westinghouse VI.         Discussion of Review of Staff Positions on Fire                               Westinghouse Protection & Safe Shutdown for Passive Designs Staff review results                                                       NRC Areas where AP600 does not comply with                                     Westinghouse Commission guidance t
V.
Associated Circuits Westinghouse VI.
Discussion of Review of Staff Positions on Fire Westinghouse Protection & Safe Shutdown for Passive Designs Staff review results NRC Areas where AP600 does not comply with Westinghouse Commission guidance t
i Attachment
i Attachment
* i
 
(                     DISTRIBU"10Nr Memorandum to Theodore R. Quav. Dated: Auaust 27. 1997                         '
i
Docket f''io i                     PUBLIC                                                                                       !
(
4                    POST-R/F                                                                                     !
DISTRIBU"10Nr Memorandum to Theodore R. Quav. Dated: Auaust 27. 1997 Docket f''io i
SCollins/FMiraglia 0-12 G18 BSheron, 0-12 G18 RZimmerman, 0-12 G18 JRoe s
PUBLIC 4
DMatthews                                                                                    '
POST-R/F SCollins/FMiraglia 0-12 G18 BSheron, 0-12 G18 RZimmerman, 0-12 G18 JRoe DMatthews s
: l.                   TJKenyon DTJackson                                                                                   i
l.
                    - WCHuffman JMSebrosky.                                                                                   l WDean, 0-5 E23                                                                               l
TJKenyon DTJackson i
                    -'JMoore 15 B18
- WCHuffman JMSebrosky.
                    ~ ACRS (11)
l WDean, 0-5 E23 l
TMarsh, 0-8 01
-'JMoore 15 B18
:                    SWest, 0-8 01                                                                               .
~ ACRS (11)
1                    Econnell 0-8 01                                                                             i j                   JHolmes, 0-8 D1 1                    PMNS (e-mail OPA (e-mail))                                                                               ,
TMarsh, 0-8 01 SWest, 0-8 01 1
A Q
Econnell 0-8 01 i
w I
j JHolmes, 0-8 D1 PMNS (e-mail OPA (e-mail))
d-                                                                                                                 4 i
1 A
Q w
I d-4 i
4 4
4 4
4 4
4 4
Line 76: Line 96:
1 5
1 5
V 8
V 8
n -w --      w         -,,.-,-n -
n -w w
g.-- -r a .r , , . , e.>-N,,--, ,,, -
-,,.-,-n g.--
                                                                            + . . , , - -,_,,-   , v,-
-r a
m -m ,}}
.r e.>-N,,--,
+..,, - -,_,,-
v,-
m
-m
-}}

Latest revision as of 01:36, 6 December 2024

Notification of 970904 Meeting W/Westinghouse in Rockville, MD to Discuss Fire Protection Issues on AP600.Agenda Encl
ML20210Q759
Person / Time
Site: 05200003
Issue date: 08/27/1997
From: Kenyon T
NRC (Affiliation Not Assigned)
To: Quay T
NRC (Affiliation Not Assigned)
References
NUDOCS 9709020134
Download: ML20210Q759 (4)


Text

.

August 27, 1997 MEMORANDUM T0:

Theodore R. Quay Director Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:

Thomas J. Kenyon, Project Manager original signed by:

Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS FIRE PROTECTION FOR THE AP600 DATE AND TIME:

September 4, 1997 - 8 a.m.. 11:30 a.m.

LOCATION:

U.S. Nuclear Regulatory Commission Two White Flint North

)

11555 Rockville Pike Rockville, Maryland 20852 Room T-10 Al PURPOSE:

To discuss fire protection issues on the AP600.

See attached agenda.

PARTICIPANTS *:

tiRC WESTINGHOUSE T. liarsh J. Winters l

T. Quay E. Cummins S. West B. McIntyre ig ())

E. Connell D. Hutchings

})

J. Holmes T. Kenyon, et al.

Docket No.52-003 I

i

Attachment:

As stated cc w/att: See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public petitioners, intervenors, or other parties to attend as observers pursua,nt to " Commission Policy Staternent on Staff Meeting Open to the Public, 59 Federal Reaister 48344,9/20/94.

However, portions of this meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact me at (301) 415-1120.

DISTRIBUTION:

See next page Vi.lLILI,11.1: ll DOCUMENT NAME: A:FP MTG.N0 t.

.w....,.i #w *,....v sc.. w.T

. w c. cop,.nsout m.ch w.new...

r. co,,.nn.ti.csm.m.ncw... v. no...,

OFFICE PM:PDST;b$PM D:PDST:DRPM

[

l NAME TJKenydn?tg TRQuayfW DATE 08h6/97 08/37/97 9709020134 970827 PDR ADOCK 05200003 A

.ppR

~.

Westinghouse Electric Corporation Docket No.52-003 cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Russ Bell Mr. B. A. McIntyre Senior Project Manager, Programs Advanced Plant safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 i Street, NW Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706 Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34 Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit j

Box 355 Dr. Craig D. Sawyer, Manager

/

Pittsburgh, PA 15230 Advanced Reactor Programs GE Nuclear Energy

)

Mr. M. D. Beaumont 175 Curtner Avenue, MC-754 Nuclear and Advanced Technology Division San Jose, CA 95125 Westinghouse Electric Corporation One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan. Esq.

U.S. Department of Energy Eckert Seamans Cherin & Hellott NE-50 600 Grant Street 42nd Floor 19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification Nuclear Systems Analysis Technologies Electric Power Research Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls. ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874

DISCUSSION TOPICS FOR AUGUST 27, 1997 AP600 FIRE PROTECTION MEETING 1.

Altornate or Dedicated Shutdown Capability Westinghouse 11.

Enhanced Design Features to Achieve Cold Shutdown Westinghouse III. Options for Dedicated Fire Water Supply that can Westinghouse Survive a Seismic Event

)

IV.

Affect of Fire on Non-Safety-Related Shutdown Westinghouse Systems J

V.

Associated Circuits Westinghouse VI.

Discussion of Review of Staff Positions on Fire Westinghouse Protection & Safe Shutdown for Passive Designs Staff review results NRC Areas where AP600 does not comply with Westinghouse Commission guidance t

i Attachment

i

(

DISTRIBU"10Nr Memorandum to Theodore R. Quav. Dated: Auaust 27. 1997 Docket fio i

PUBLIC 4

POST-R/F SCollins/FMiraglia 0-12 G18 BSheron, 0-12 G18 RZimmerman, 0-12 G18 JRoe DMatthews s

l.

TJKenyon DTJackson i

- WCHuffman JMSebrosky.

l WDean, 0-5 E23 l

-'JMoore 15 B18

~ ACRS (11)

TMarsh, 0-8 01 SWest, 0-8 01 1

Econnell 0-8 01 i

j JHolmes, 0-8 D1 PMNS (e-mail OPA (e-mail))

1 A

Q w

I d-4 i

4 4

4 4

4 t

1 5

V 8

n -w w

-,,.-,-n g.--

-r a

.r e.>-N,,--,

+..,, - -,_,,-

v,-

m

-m

-