ML20210T086: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_.        _ _ _
{{#Wiki_filter:_
d DEC 2 3 SS Richard DeYoung, Assistant Director for Light Vater Reactors, Group 1, NRR WFF18 NUCLRAR FROJECT 3 & 5               -
d DEC 2 3 SS Richard DeYoung, Assistant Director for Light Vater Reactors, Group 1, NRR SAFETY EVALUATION REFORT INFUT -
SAFETY EVALUATION REFORT INFUT -
WFF18 NUCLRAR FROJECT 3 & 5 RADIATION FROTECTION SECTION Plant Name: WPPSS 36 5 Licensing Staget i
RADIATION FROTECTION SECTION Plant Name: WPPSS 36 5 Licensing Staget i
Docket Number:
Docket Number:             50     09 Responsible Branch: LWR l-3 Project Manager: A. Sournia Date Request Received by RAB: Per Blue Book Requested Completion Date: 1/5/76 Description of Response Safety Evaluation Report input
50 09 Responsible Branch: LWR l-3 Project Manager:
,                    Review Status: Complete The Washington Public Power Supply System's Nuclear Project 3 & 5 PSAR
A. Sournia Date Request Received by RAB: Per Blue Book Requested Completion Date: 1/5/76 Description of Response Safety Evaluation Report input Review Status: Complete The Washington Public Power Supply System's Nuclear Project 3 & 5 PSAR has been reviewed through Amendment 27 by the Radiation Protection Section. This review included an examination of the recent changes in the plant layout. As a result of this review, we have formulated an amended safety evaluation of the Radiation Protection section of the l
-                    has been reviewed through Amendment 27 by the Radiation Protection
WPPSS application. Significant changes from the SER submitted ou May 15, 1975 are marked on the margins. Our input to the Safety Evaluation Report is enclosed.
'                    Section. This review included an examination of the recent changes in the plant layout. As a result of this review, we have formulated an amended safety evaluation of the Radiation Protection section of the l
I This review was performed by T. D. Murphy, RPS/RAB.
WPPSS application. Significant changes from the SER submitted ou
;                    May 15, 1975 are marked on the margins. Our input to the Safety Evaluation Report is enclosed.
I                   This review was performed by T. D. Murphy, RPS/RAB.
Dr.vsai:.;p.n y
Dr.vsai:.;p.n y
                                                                                . N. R. Denten Harold R. Denton, Assistant Director for Site Safety Division of Technical Review Enclosures as stated ec w/o encl.:
. N. R. Denten Harold R. Denton, Assistant Director for Site Safety Division of Technical Review Enclosures as stated ec w/o encl.:
R. Boyd
R. Boyd W. Mcdonald SS/BC's J. Pansarella as w/ encl.:
!                  W. Mcdonald SS/BC's J. Pansarella i                  as w/ encl.:
i
  ?
?
S. Hanauer
S. Hanauer R. Heineman l
  !                  R. Heineman l                 J. Collins
J. Collins T. Murphy 8605290708 751229 1
  !                  T. Murphy                                 8605290708 751229 1                 A. Bournia                                 PDR       ADOCK 05000508 i                 W. Kreger                                 E                             PDR M. Parsont
A. Bournia PDR ADOCK 05000508 i
* D , " u t ' * *   '}               ,
W. Kreger E
PDR M. Parsont D, " u t ' * *
'}
* R./ -
RAB TR SS:
OF F'C 8 *
OF F'C 8 *
* R ./ -  RAB TR              SS:      --                      _          - -- --
'N
            .u==..*          'N     $:p .. WKreger. . ._ _   .HDeyton 12/4r/75       12/t2/75           12/p75 Foren ABC Ble (Rev. 9-53) ABCM 0240                   W u. e; oovsanuswv Pasurine orrics sere.saa.see
$:p
                        - - _}}
.. WKreger..._ _
.HDeyton
.u==..*
12/4r/75 12/t2/75 12/p75 Foren ABC Ble (Rev. 9-53) ABCM 0240 W u. e; oovsanuswv Pasurine orrics sere.saa.see
- - _}}

Latest revision as of 01:11, 6 December 2024

Forwards Radiological Assessment Branch marked-up Rev to 750515 SER Input on PSAR Through Amend 27,including Exam of Changes in Plant Layout.W/O Encl
ML20210T086
Person / Time
Site: Satsop
Issue date: 12/29/1975
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Deyoung R
Office of Nuclear Reactor Regulation
References
CON-WNP-1659 NUDOCS 8605290708
Download: ML20210T086 (1)


Text

_

d DEC 2 3 SS Richard DeYoung, Assistant Director for Light Vater Reactors, Group 1, NRR SAFETY EVALUATION REFORT INFUT -

WFF18 NUCLRAR FROJECT 3 & 5 RADIATION FROTECTION SECTION Plant Name: WPPSS 36 5 Licensing Staget i

Docket Number:

50 09 Responsible Branch: LWR l-3 Project Manager:

A. Sournia Date Request Received by RAB: Per Blue Book Requested Completion Date: 1/5/76 Description of Response Safety Evaluation Report input Review Status: Complete The Washington Public Power Supply System's Nuclear Project 3 & 5 PSAR has been reviewed through Amendment 27 by the Radiation Protection Section. This review included an examination of the recent changes in the plant layout. As a result of this review, we have formulated an amended safety evaluation of the Radiation Protection section of the l

WPPSS application. Significant changes from the SER submitted ou May 15, 1975 are marked on the margins. Our input to the Safety Evaluation Report is enclosed.

I This review was performed by T. D. Murphy, RPS/RAB.

Dr.vsai:.;p.n y

. N. R. Denten Harold R. Denton, Assistant Director for Site Safety Division of Technical Review Enclosures as stated ec w/o encl.:

R. Boyd W. Mcdonald SS/BC's J. Pansarella as w/ encl.:

i

?

S. Hanauer R. Heineman l

J. Collins T. Murphy 8605290708 751229 1

A. Bournia PDR ADOCK 05000508 i

W. Kreger E

PDR M. Parsont D, " u t ' * *

'}

  • R./ -

RAB TR SS:

OF F'C 8 *

'N

$:p

.. WKreger..._ _

.HDeyton

.u==..*

12/4r/75 12/t2/75 12/p75 Foren ABC Ble (Rev. 9-53) ABCM 0240 W u. e; oovsanuswv Pasurine orrics sere.saa.see

- - _