ML20211E636: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
y Duquesne U@t                                                             "2%$',
y Duquesne U@t "2%$',
          = =: = ;a,..,.
= =: = ;a,..,.
p,it.nurgn. pA isros u==11ay 13, 1986 United States Nuclear Regulatory Connission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:         Dr. Thomas E. Murley USNRC Administrator
u==
p,it.nurgn. pA isros 11ay 13, 1986 United States Nuclear Regulatory Connission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Dr. Thomas E. Murley USNRC Administrator


==SUBJECT:==
==SUBJECT:==
Beaver Valley Power Station - Unit No. 2 I.E. Bulletin 85-03 Motor Operated Valve Common Mode Failures Gentlemen:
Beaver Valley Power Station - Unit No. 2 I.E. Bulletin 85-03 Motor Operated Valve Common Mode Failures Gentlemen:
On March 18, 1986 L. D. Butterfield, Chairman of the Westinghouse Owners Group (WOG), notified Mr. T. Novak, Acting Director of Licensing PWR-A (NRR), that some utilities may need to request an extension for responding to I.E. Bulletin 85-03 due to the completion date of the generic evaluation performed by Westinghouse for the WOG.           Duquesne Light Company participated with other WOG members in sponsoring this generic study.
On March 18, 1986 L.
The information required by IEB 85-03 necessitates that a plant l     specific application of the WOG study be performed.               Additionally, motor I      operated valve design criteria is required from Westinghouse. To allow time
D.
!      for receipt of this information and for incorporation into the Beaver Valley Unit 2 motor operated valve testing and maintenance programs, Duquesne Light I
Butterfield, Chairman of the Westinghouse Owners Group (WOG), notified Mr. T. Novak, Acting Director of Licensing PWR-A (NRR), that some utilities may need to request an extension for responding to I.E.
Company requests a ninety (90) day extension to the date for the first report i     required by IEB 85-03. This report will be submitted no later than August 15, l     1986.
Bulletin 85-03 due to the completion date of the generic evaluation performed by Westinghouse for the WOG.
Duquesne Light Company participated with other WOG members in sponsoring this generic study.
The information required by IEB 85-03 necessitates that a plant l
specific application of the WOG study be performed.
Additionally, motor operated valve design criteria is required from Westinghouse.
To allow time I
for receipt of this information and for incorporation into the Beaver Valley Unit 2 motor operated valve testing and maintenance programs, Duquesne Light I
Company requests a ninety (90) day extension to the date for the first report i
required by IEB 85-03.
This report will be submitted no later than August 15, l
1986.
DUQUESNE LIGHT COMPANY I
DUQUESNE LIGHT COMPANY I
By M. J' Carey     7 Vice President RJW/ijr NRC/BULTN/8503 cc:     Mr. P. Tam, Project Manager Mr. J. M. Taylor, Director (3)
By M. J' Carey 7
Mr. W. Troskoski, Sr. Resident Inspector i             Mr. L. Prividy NRC Resident Inspector INP0 Records Center l              NRC Document Control Desk 8606160206 860611 PDR       ADOCK 05000412 G                       PDR
Vice President RJW/ijr NRC/BULTN/8503 cc:
[G-\\}}
Mr. P. Tam, Project Manager Mr. J. M. Taylor, Director (3)
Mr. W. Troskoski, Sr. Resident Inspector i
Mr. L. Prividy NRC Resident Inspector INP0 Records Center NRC Document Control Desk l
8606160206 860611 PDR ADOCK 05000412 PDR G
[G-\\\\}}

Latest revision as of 23:42, 5 December 2024

Requests 90-day Extension to Respond to IE Bulletin 85-003 Re motor-operated Valve Failures.Addl Time Needed to Complete Generic Evaluation by Westinghouse & to Review motor-operated Design Valve Criteria
ML20211E636
Person / Time
Site: Beaver Valley
Issue date: 05/13/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20211E625 List:
References
2NRC-6-046, 2NRC-6-46, IEB-85-003, IEB-85-3, NUDOCS 8606160206
Download: ML20211E636 (1)


Text

-

y Duquesne U@t "2%$',

= =: = ;a,..,.

u==

p,it.nurgn. pA isros 11ay 13, 1986 United States Nuclear Regulatory Connission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Dr. Thomas E. Murley USNRC Administrator

SUBJECT:

Beaver Valley Power Station - Unit No. 2 I.E.Bulletin 85-03 Motor Operated Valve Common Mode Failures Gentlemen:

On March 18, 1986 L.

D.

Butterfield, Chairman of the Westinghouse Owners Group (WOG), notified Mr. T. Novak, Acting Director of Licensing PWR-A (NRR), that some utilities may need to request an extension for responding to I.E.

Bulletin 85-03 due to the completion date of the generic evaluation performed by Westinghouse for the WOG.

Duquesne Light Company participated with other WOG members in sponsoring this generic study.

The information required by IEB 85-03 necessitates that a plant l

specific application of the WOG study be performed.

Additionally, motor operated valve design criteria is required from Westinghouse.

To allow time I

for receipt of this information and for incorporation into the Beaver Valley Unit 2 motor operated valve testing and maintenance programs, Duquesne Light I

Company requests a ninety (90) day extension to the date for the first report i

required by IEB 85-03.

This report will be submitted no later than August 15, l

1986.

DUQUESNE LIGHT COMPANY I

By M. J' Carey 7

Vice President RJW/ijr NRC/BULTN/8503 cc:

Mr. P. Tam, Project Manager Mr. J. M. Taylor, Director (3)

Mr. W. Troskoski, Sr. Resident Inspector i

Mr. L. Prividy NRC Resident Inspector INP0 Records Center NRC Document Control Desk l

8606160206 860611 PDR ADOCK 05000412 PDR G

[G-\\\\