p,it.nurgn. pA isros 11ay 13, 1986 United States Nuclear Regulatory Connission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION: | |||
Dr. Thomas E. Murley USNRC Administrator | |||
==SUBJECT:== | ==SUBJECT:== | ||
Beaver Valley Power Station - Unit No. 2 I.E. Bulletin 85-03 Motor Operated Valve Common Mode Failures Gentlemen: | Beaver Valley Power Station - Unit No. 2 I.E. Bulletin 85-03 Motor Operated Valve Common Mode Failures Gentlemen: | ||
On March 18, 1986 L. D. Butterfield, Chairman of the Westinghouse Owners Group (WOG), notified Mr. T. Novak, Acting Director of Licensing PWR-A (NRR), that some utilities may need to request an extension for responding to I.E. Bulletin 85-03 due to the completion date of the generic evaluation performed by Westinghouse for the WOG. | On March 18, 1986 L. | ||
The information required by IEB 85-03 necessitates that a plant l | D. | ||
Butterfield, Chairman of the Westinghouse Owners Group (WOG), notified Mr. T. Novak, Acting Director of Licensing PWR-A (NRR), that some utilities may need to request an extension for responding to I.E. | |||
Company requests a ninety (90) day extension to the date for the first report i | Bulletin 85-03 due to the completion date of the generic evaluation performed by Westinghouse for the WOG. | ||
Duquesne Light Company participated with other WOG members in sponsoring this generic study. | |||
The information required by IEB 85-03 necessitates that a plant l | |||
specific application of the WOG study be performed. | |||
Additionally, motor operated valve design criteria is required from Westinghouse. | |||
To allow time I | |||
for receipt of this information and for incorporation into the Beaver Valley Unit 2 motor operated valve testing and maintenance programs, Duquesne Light I | |||
Company requests a ninety (90) day extension to the date for the first report i | |||
required by IEB 85-03. | |||
This report will be submitted no later than August 15, l | |||
1986. | |||
DUQUESNE LIGHT COMPANY I | DUQUESNE LIGHT COMPANY I | ||
By M. J' Carey | By M. J' Carey 7 | ||
Mr. W. Troskoski, Sr. Resident Inspector i | Vice President RJW/ijr NRC/BULTN/8503 cc: | ||
[G-\\}} | Mr. P. Tam, Project Manager Mr. J. M. Taylor, Director (3) | ||
Mr. W. Troskoski, Sr. Resident Inspector i | |||
Mr. L. Prividy NRC Resident Inspector INP0 Records Center NRC Document Control Desk l | |||
8606160206 860611 PDR ADOCK 05000412 PDR G | |||
[G-\\\\}} | |||
Latest revision as of 23:42, 5 December 2024
| ML20211E636 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 05/13/1986 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20211E625 | List: |
| References | |
| 2NRC-6-046, 2NRC-6-46, IEB-85-003, IEB-85-3, NUDOCS 8606160206 | |
| Download: ML20211E636 (1) | |
Text
-
y Duquesne U@t "2%$',
= =: = ;a,..,.
u==
p,it.nurgn. pA isros 11ay 13, 1986 United States Nuclear Regulatory Connission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Dr. Thomas E. Murley USNRC Administrator
SUBJECT:
Beaver Valley Power Station - Unit No. 2 I.E.Bulletin 85-03 Motor Operated Valve Common Mode Failures Gentlemen:
On March 18, 1986 L.
D.
Butterfield, Chairman of the Westinghouse Owners Group (WOG), notified Mr. T. Novak, Acting Director of Licensing PWR-A (NRR), that some utilities may need to request an extension for responding to I.E.
Bulletin 85-03 due to the completion date of the generic evaluation performed by Westinghouse for the WOG.
Duquesne Light Company participated with other WOG members in sponsoring this generic study.
The information required by IEB 85-03 necessitates that a plant l
specific application of the WOG study be performed.
Additionally, motor operated valve design criteria is required from Westinghouse.
To allow time I
for receipt of this information and for incorporation into the Beaver Valley Unit 2 motor operated valve testing and maintenance programs, Duquesne Light I
Company requests a ninety (90) day extension to the date for the first report i
required by IEB 85-03.
This report will be submitted no later than August 15, l
1986.
DUQUESNE LIGHT COMPANY I
By M. J' Carey 7
Vice President RJW/ijr NRC/BULTN/8503 cc:
Mr. P. Tam, Project Manager Mr. J. M. Taylor, Director (3)
Mr. W. Troskoski, Sr. Resident Inspector i
Mr. L. Prividy NRC Resident Inspector INP0 Records Center NRC Document Control Desk l
8606160206 860611 PDR ADOCK 05000412 PDR G