                .%     t                               UNITED STATES
t UNITED STATES
                        }             NUCLEAR REGULATORY COMMISSION t,                                             "$ep$e"in$er' D997 Mr. H. L. Sumner, Jr.
}
NUCLEAR REGULATORY COMMISSION t,
"$ep$e"in$er' D997 Mr. H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project Southem Nuclear Operating Company, Inc.
Vice President - Nuclear Hatch Project Southem Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabame 35201-1295
Post Office Box 1295 Birmingham, Alabame 35201-1295
Line 28: Line 30:


==Dear Mr. Sumner:==
==Dear Mr. Sumner:==
The NRC staff is concemed about torus thinning that may have occurred as a result of corrosion of the steel shellin areas that have defective or missing coatings, and, thus, we are requesting information relating to the rninimum Code wall thickness of the torus structure in the Mark I containments for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2.
The NRC staff is concemed about torus thinning that may have occurred as a result of corrosion of the steel shellin areas that have defective or missing coatings, and, thus, we are requesting information relating to the rninimum Code wall thickness of the torus structure in the Mark I containments for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2.
We are requesting information based on the results of your inspections of the Hatch torus structures at the following locations: in the vicinity of the torus-to-ring girder support welds; at the air-water interface; and in submerged areas to determine if the wall thicknesses at these locations are below the Code allowables. While UT thickness measurements would usually be made from the outside of the torus structure, it is important that the condition of the coatings on the inside of the torus structure be visually inspected as well.
We are requesting information based on the results of your inspections of the Hatch torus structures at the following locations: in the vicinity of the torus-to-ring girder support welds; at the air-water interface; and in submerged areas to determine if the wall thicknesses at these locations are below the Code allowables. While UT thickness measurements would usually be made from the outside of the torus structure, it is important that the condition of the coatings on the inside of the torus structure be visually inspected as well.
Your verification that the Hatch torus wall thicknesses meet the minimum wall thickness requirements can be accomplished by reviewing the results of your recent inspections or by additionalinspections of the torus structure.
Your verification that the Hatch torus wall thicknesses meet the minimum wall thickness requirements can be accomplished by reviewing the results of your recent inspections or by additionalinspections of the torus structure.
Please submit a report providing the design minimum wall thicknesses in the identified locations, the method / criteria for determining their design thicknesses, the actual measured thickness in these locations, the condition of the coatings on the inside of the torus, and the dates when these measurements and/or observations were made. If you identify degradation, you should also provide an assessment of the condition and long-term integrity of the degraded torus.
Please submit a report providing the design minimum wall thicknesses in the identified locations, the method / criteria for determining their design thicknesses, the actual measured thickness in these locations, the condition of the coatings on the inside of the torus, and the dates when these measurements and/or observations were made. If you identify degradation, you should also provide an assessment of the condition and long-term integrity of the degraded torus.
i iEC HE CEJ!?~R CGPy 9710020100 970923 DR ADOCK 0500             1
i iEC HE CEJ!?~R CGPy 9710020100 970923
                                                                                                              %I ; D ll I.I 1.1 l.llia -IllIII
%I ; D DR ADOCK 0500 1
                                                        .          e    e
ll I.I 1.1 l.lli IllIII e
e a -


4 Mr, H. L. Sumner, Jr.                                     if you determine that you need to do additionalinspections, please provide the infonnation currently available within 60 days. The additionalinspections should be conducted at the next outage of sumcient duration. If you have any questions regarding this matter, please contact me at 301-415-1458.
4 Mr, H. L. Sumner, Jr. if you determine that you need to do additionalinspections, please provide the infonnation currently available within 60 days. The additionalinspections should be conducted at the next outage of sumcient duration. If you have any questions regarding this matter, please contact me at 301-415-1458.
Sincerely, w
Sincerely, w
Ngoc B. (Tommy) Le, Project Manager Project Directorate ll 2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366                                                     -
Ngoc B. (Tommy) Le, Project Manager Project Directorate ll 2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page h
cc: See next page h


i-Edwin 1. Hatch Nuclear Plant cc:
i-Edwin 1. Hatch Nuclear Plant cc:
Mr. Ernest L. Blake, Jr.
Mr. Ernest L. Blake, Jr.
Shaw, Pittman, Potts                     Charles A. Patrizia, Esquire and Trowbridge                         Paul, Hastings, Janofsky & Walker 2300 N Street, NW.                         10th Floor Washington, DC 20037                       1299 Pennsylvania Avenue
Shaw, Pittman, Potts Charles A. Patrizia, Esquire and Trowbridge Paul, Hastings, Janofsky & Walker 2300 N Street, NW.
                                                        . Washington, DC 20004 9500 Mr. D. M. Crowe Manager, Licensing                       Chairman Southern Nuclear Operating               Appling County Commissioners             ,
10th Floor Washington, DC 20037 1299 Pennsylvania Avenue
Company, Inc.                           County Courthousa P. O. Box 1295                           Baxley, Georgia 31513 Birmingham, Alabama 35201-1295 Mr. W. G. Harriston,111 Resident inspector                       President t.nd Chief Executive Plant Hatch                                 Officer Southern Nuclear Operating               Southem Nuclear Operating Company, Inc.                             Company, Inc.
. Washington, DC 20004 9500 Mr. D. M. Crowe Chairman Manager, Licensing Southern Nuclear Operating Appling County Commissioners Company, Inc.
P. O. Box 439                             P. O. Box 1295 Baxley, Georgia 31513                     Birmingham, Alabama 35201-1295 Regional A'dministrator, Region ll       Mr. J. D. Woodard
County Courthousa P. O. Box 1295 Baxley, Georgia 31513 Birmingham, Alabama 35201-1295 Mr. W. G. Harriston,111 Resident inspector President t.nd Chief Executive Plant Hatch Officer Southern Nuclear Operating Southem Nuclear Operating Company, Inc.
              - U.S. Nuclear Regulatory Commission       Executive Vice President Atlanta Federal Center                   Southem Nuclear Operating Company, Inc.
Company, Inc.
61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303                   P. O. Box 1295 Birmingham, Alabama 35201 1295 Mr.- Charles H. Badger Office of Planning and Budget            Mr. P. W. Wells Room 610                                 General Manager, Edwin 1. Hatch 270 Washington Street, SW.                 Nuclear Plant Atlanta, Georgia 30334                   Southem Nuclear Operating Company, Inc.
P. O. Box 439 P. O. Box 1295 Baxley, Georgia 31513 Birmingham, Alabama 35201-1295 Regional A'dministrator, Region ll Mr. J. D. Woodard
Harold Reheis, Director                 P. O. Box 439 -
- U.S. Nuclear Regulatory Commission Executive Vice President Atlanta Federal Center Southem Nuclear Operating 61 Forsyth Street, SW, Suite 23T85 Company, Inc.
Department of Natural Resources           Baxley, Georgia 31513 205 Butler Street, SE., Suite 1252 Atlanta, Geor0ia 30334                   Mr. R. D. Barker Program Manager Steven M. Jackson                         Fossil & Nuclear Operations Senior Engineer - Power Supply           Oglethorpe Power Corporation Municipal Electric Authority             2100 East Exchange Place of Georgia                             P. O. Box 1349 1470 Riveredge Parkway, NW               Tucker, Georgia 30085-1349 Atlanta, Georgia 30328 4684 i
Atlanta, Georgia 30303 P. O. Box 1295 Birmingham, Alabama 35201 1295 Mr.- Charles H. Badger Mr. P. W. Wells Office of Planning and Budget Room 610 General Manager, Edwin 1. Hatch 270 Washington Street, SW.
Nuclear Plant Atlanta, Georgia 30334 Southem Nuclear Operating Company, Inc.
Harold Reheis, Director P. O. Box 439 -
Department of Natural Resources Baxley, Georgia 31513 205 Butler Street, SE., Suite 1252 Atlanta, Geor0ia 30334 Mr. R. D. Barker Program Manager Steven M. Jackson Fossil & Nuclear Operations Senior Engineer - Power Supply Oglethorpe Power Corporation Municipal Electric Authority 2100 East Exchange Place of Georgia P. O. Box 1349 1470 Riveredge Parkway, NW Tucker, Georgia 30085-1349 Atlanta, Georgia 30328 4684 i


Mr. H. L. Sumner, Jr.                                           September 23, 1997 If you determine that you need to do additionalinspections, please provide the information currently available within 60 days. The additionalinspections should be conducted at the next outage of sufficient duration. If you have any questions regarding this matter, please contact me at 301-415-1450.
Mr. H. L. Sumner, Jr. September 23, 1997 If you determine that you need to do additionalinspections, please provide the information currently available within 60 days. The additionalinspections should be conducted at the next outage of sufficient duration. If you have any questions regarding this matter, please contact me at 301-415-1450.
Sincerely, ORIGINAL SIGNED BY:
Sincerely, ORIGINAL SIGNED BY:
Ngoc B. (Tommy) Le, Project Manager Project Directorate 112 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50 321 and 50-336 cc: See next page DistributiqIn (OuehetMlet             HBerkow         ACRS PUBLIC                 LBerry         JJohnson, Rll PD ll 2 Rdg.           NLe             PSkinner, Ril BBoger                 JStrosnider JZwolinski             OGC To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with cttachment/ enclosure "N" = No copy *See previous con'ckence OFFICE PM:PDll-2,             LA:PDil-2         BC:EMQBf         D:PDK.$ '')
Ngoc B. (Tommy) Le, Project Manager Project Directorate 112 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50 321 and 50-336 cc: See next page DistributiqIn (OuehetMlet HBerkow ACRS PUBLIC LBerry JJohnson, Rll PD ll 2 Rdg.
NAME NLe:cn Tdt./             LBerry \iS       JStro6hi216h     HBerkM ~
NLe PSkinner, Ril BBoger JStrosnider JZwolinski OGC To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with cttachment/ enclosure "N" = No copy *See previous con'ckence OFFICE PM:PDll-2, LA:PDil-2 BC:EMQBf D:PDK.$ '')
DATE       4 /t V/97           3 /0/ \           9/12/F/dYW A / $/97                     / /97         / /97 DOCUMENT NAME: G:\ HATCH \ TORUS.RFI                   OFFICIAL RECORD COPY}}
NAME NLe:cn Tdt./
LBerry \\iS JStro6hi216h HBerkM ~
DATE 4 /t V/97 3 /0/
\\
9/12/F/dYW A / $/97
/ /97
/ /97 DOCUMENT NAME: G:\\ HATCH \\ TORUS.RFI OFFICIAL RECORD COPY}}

Latest revision as of 23:22, 5 December 2024

Requests Rept on Design Min Wall Thickness in Identified Locations,Method/Criteria for Determining Design Thickness, Actual Measured Thickness in Locations & Conditions of Coatings on Inside of Torus
ML20211G274
Person / Time
Site: Hatch  
Issue date: 09/23/1997
From: Le N
NRC (Affiliation Not Assigned)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9710020180
Download: ML20211G274 (4)


Text

. _. _.

n3xM

((/a.%

t UNITED STATES

}

NUCLEAR REGULATORY COMMISSION t,

"$ep$e"in$er' D997 Mr. H. L. Sumner, Jr.

Vice President - Nuclear Hatch Project Southem Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabame 35201-1295

SUBJECT:

VERIFICATION OF ADEQUATE WALL THICKNESS FOR MARK i TORUS SHELLS - EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2

Dear Mr. Sumner:

The NRC staff is concemed about torus thinning that may have occurred as a result of corrosion of the steel shellin areas that have defective or missing coatings, and, thus, we are requesting information relating to the rninimum Code wall thickness of the torus structure in the Mark I containments for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2.

We are requesting information based on the results of your inspections of the Hatch torus structures at the following locations: in the vicinity of the torus-to-ring girder support welds; at the air-water interface; and in submerged areas to determine if the wall thicknesses at these locations are below the Code allowables. While UT thickness measurements would usually be made from the outside of the torus structure, it is important that the condition of the coatings on the inside of the torus structure be visually inspected as well.

Your verification that the Hatch torus wall thicknesses meet the minimum wall thickness requirements can be accomplished by reviewing the results of your recent inspections or by additionalinspections of the torus structure.

Please submit a report providing the design minimum wall thicknesses in the identified locations, the method / criteria for determining their design thicknesses, the actual measured thickness in these locations, the condition of the coatings on the inside of the torus, and the dates when these measurements and/or observations were made. If you identify degradation, you should also provide an assessment of the condition and long-term integrity of the degraded torus.

i iEC HE CEJ!?~R CGPy 9710020100 970923

%I ; D DR ADOCK 0500 1

ll I.I 1.1 l.lli IllIII e

e a -

4 Mr, H. L. Sumner, Jr. if you determine that you need to do additionalinspections, please provide the infonnation currently available within 60 days. The additionalinspections should be conducted at the next outage of sumcient duration. If you have any questions regarding this matter, please contact me at 301-415-1458.

Sincerely, w

Ngoc B. (Tommy) Le, Project Manager Project Directorate ll 2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page h

i-Edwin 1. Hatch Nuclear Plant cc:

Mr. Ernest L. Blake, Jr.

Shaw, Pittman, Potts Charles A. Patrizia, Esquire and Trowbridge Paul, Hastings, Janofsky & Walker 2300 N Street, NW.

10th Floor Washington, DC 20037 1299 Pennsylvania Avenue

. Washington, DC 20004 9500 Mr. D. M. Crowe Chairman Manager, Licensing Southern Nuclear Operating Appling County Commissioners Company, Inc.

County Courthousa P. O. Box 1295 Baxley, Georgia 31513 Birmingham, Alabama 35201-1295 Mr. W. G. Harriston,111 Resident inspector President t.nd Chief Executive Plant Hatch Officer Southern Nuclear Operating Southem Nuclear Operating Company, Inc.

Company, Inc.

P. O. Box 439 P. O. Box 1295 Baxley, Georgia 31513 Birmingham, Alabama 35201-1295 Regional A'dministrator, Region ll Mr. J. D. Woodard

- U.S. Nuclear Regulatory Commission Executive Vice President Atlanta Federal Center Southem Nuclear Operating 61 Forsyth Street, SW, Suite 23T85 Company, Inc.

Atlanta, Georgia 30303 P. O. Box 1295 Birmingham, Alabama 35201 1295 Mr.- Charles H. Badger Mr. P. W. Wells Office of Planning and Budget Room 610 General Manager, Edwin 1. Hatch 270 Washington Street, SW.

Nuclear Plant Atlanta, Georgia 30334 Southem Nuclear Operating Company, Inc.

Harold Reheis, Director P. O. Box 439 -

Department of Natural Resources Baxley, Georgia 31513 205 Butler Street, SE., Suite 1252 Atlanta, Geor0ia 30334 Mr. R. D. Barker Program Manager Steven M. Jackson Fossil & Nuclear Operations Senior Engineer - Power Supply Oglethorpe Power Corporation Municipal Electric Authority 2100 East Exchange Place of Georgia P. O. Box 1349 1470 Riveredge Parkway, NW Tucker, Georgia 30085-1349 Atlanta, Georgia 30328 4684 i

Mr. H. L. Sumner, Jr. September 23, 1997 If you determine that you need to do additionalinspections, please provide the information currently available within 60 days. The additionalinspections should be conducted at the next outage of sufficient duration. If you have any questions regarding this matter, please contact me at 301-415-1450.

Sincerely, ORIGINAL SIGNED BY:

Ngoc B. (Tommy) Le, Project Manager Project Directorate 112 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50 321 and 50-336 cc: See next page DistributiqIn (OuehetMlet HBerkow ACRS PUBLIC LBerry JJohnson, Rll PD ll 2 Rdg.

NLe PSkinner, Ril BBoger JStrosnider JZwolinski OGC To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with cttachment/ enclosure "N" = No copy *See previous con'ckence OFFICE PM:PDll-2, LA:PDil-2 BC:EMQBf D:PDK.$ )

NAME NLe:cn Tdt./

LBerry \\iS JStro6hi216h HBerkM ~

DATE 4 /t V/97 3 /0/

\\

9/12/F/dYW A / $/97

/ /97

/ /97 DOCUMENT NAME: G:\\ HATCH \\ TORUS.RFI OFFICIAL RECORD COPY