{{#Wiki_filter:Georgia Fbwer Compiny Fbst Offica Box 282 Waynesbora Georgia 3083o Telephone 404 554-9961 404 724-8114 Southern Company Services, Inc.
{{#Wiki_filter:Georgia Fbwer Compiny Fbst Offica Box 282 Waynesbora Georgia 3083o Telephone 404 554-9961 404 724-8114 Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 VOgtie Project December 8, 1986 Director of Nuclear Reactor Regulation                                   File: X7BC35 Attention: Mr. B. J. Youngblood                                           Log: GN-1217 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.             20555 REF:       (1) MILLER (NRC) TO CONWAY (GPC) DATED 8/29/86 (2) BAILEY (GPC) TO DENTON (NRC) DATED 10/31/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 12:       ITEM II.O.1, TESTIt!G OF RELIEF AND SAFETY VALVES
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 VOgtie Project December 8, 1986 Director of Nuclear Reactor Regulation File:
X7BC35 Attention: Mr. B. J. Youngblood Log:
GN-1217 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 REF:
(1) MILLER (NRC) TO CONWAY (GPC) DATED 8/29/86 (2) BAILEY (GPC) TO DENTON (NRC) DATED 10/31/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 12:
ITEM II.O.1, TESTIt!G OF RELIEF AND SAFETY VALVES


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
Subsequent to the submittal of the above referenced letter dated 10/31/86, concerning performance testing of the safety and relief valves, a member of your staff requested additional information regarding the pressurizer safety valves.
Subsequent to the submittal of the above referenced letter dated 10/31/86, concerning performance testing of the safety and relief valves, a member of your staff requested additional information regarding the pressurizer safety valves. In accordance with this conversation Georgia Power Company commits to adopt procedures for inspection and maintenance following each lift of a pressurizer safety valve involving a discharge of water.
In accordance with this conversation Georgia Power Company commits to adopt procedures for inspection and maintenance following each lift of a pressurizer safety valve involving a discharge of water.
Should you need additional information, please do not hesitate to call me.
Should you need additional information, please do not hesitate to call me.
Sincerely, J. A. Bailey Project Licensing Manager JAB /dd xc:       R. E. Conway                         NRC Regional Administrator R. A. Thomas                         NRC Resident Inspector J. E. Joiner, Esquire                 D. Feig B. W. Churchill, Esquire             R. A. McManus M. A. Miller (2)                     L. T. Gucwa                                   g B. Jones, Esquire                   Vogtle Project File                     p1 G. Bockhold, Jr.                                                             U
Sincerely, J. A. Bailey Project Licensing Manager JAB /dd xc:
                                                                                              )
R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. A. McManus M. A. Miller (2)
D 8612190142 861209 4 PDR       ADOCK 0500 L_     E}}
L. T. Gucwa g
B. Jones, Esquire Vogtle Project File p1 G. Bockhold, Jr.
U D
8612190142 861209
)
PDR ADOCK 0500 4
L_
E}}

Latest revision as of 21:21, 5 December 2024

Commits to Adopt Procedures for Insp & Maint Following Each Lift of Pressurizer Safety Valve Involving Discharge of Water,In Response to Request for Addl Info Re Pressurizer Safety Valve,Per SER Confirmatory Item 12 & Item II.D.1
ML20211P814
Person / Time
Site: Vogtle  
Issue date: 12/08/1986
From: Bailey J
GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
TASK-2.D.1, TASK-TM GN-1217, NUDOCS 8612190142
Download: ML20211P814 (1)


Text

Georgia Fbwer Compiny Fbst Offica Box 282 Waynesbora Georgia 3083o Telephone 404 554-9961 404 724-8114 Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 VOgtie Project December 8, 1986 Director of Nuclear Reactor Regulation File:

X7BC35 Attention: Mr. B. J. Youngblood Log:

GN-1217 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.

20555 REF:

(1) MILLER (NRC) TO CONWAY (GPC) DATED 8/29/86 (2) BAILEY (GPC) TO DENTON (NRC) DATED 10/31/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 12:

ITEM II.O.1, TESTIt!G OF RELIEF AND SAFETY VALVES

Dear Mr. Denton:

Subsequent to the submittal of the above referenced letter dated 10/31/86, concerning performance testing of the safety and relief valves, a member of your staff requested additional information regarding the pressurizer safety valves.

In accordance with this conversation Georgia Power Company commits to adopt procedures for inspection and maintenance following each lift of a pressurizer safety valve involving a discharge of water.

Should you need additional information, please do not hesitate to call me.

Sincerely, J. A. Bailey Project Licensing Manager JAB /dd xc:

R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. A. McManus M. A. Miller (2)

L. T. Gucwa g

B. Jones, Esquire Vogtle Project File p1 G. Bockhold, Jr.

U D

8612190142 861209

)

PDR ADOCK 0500 4

L_