{{#Wiki_filter:Cesnunonu(,thh lahwn Comp.in)
{{#Wiki_filter:Cesnunonu(,thh lahwn Comp.in)
    .          11) run (,corrating %tation iISO North (4rrrnan ( hurt h Ro.kl
: 11) run (,corrating %tation iISO North (4rrrnan ( hurt h Ro.kl
: 11) run 11. 6iO l0 979 i TriMIS/H $4:1 September 14,1999 LTR:                 BYRON 99-0132 File:                 2.7.200 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
: 11) run 11. 6iO l0 979 i TriMIS/H $4:1 September 14,1999 LTR:
BYRON 99-0132 File:
2.7.200 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455


==Subject:==
==Subject:==
Monthly Operating Report in accordance with Technical Specification 5.6.4, " Monthly Operating Reports," we are submitting the Monthly Operating Report for Byron Station, Units 1 and 2. This report covers the period August 1,1999, to August 31,1999.
Monthly Operating Report in accordance with Technical Specification 5.6.4, " Monthly Operating Reports," we are submitting the Monthly Operating Report for Byron Station, Units 1 and 2. This report covers the period August 1,1999, to August 31,1999.
If you have any questions regarding this report, please contact Mr. Brad Adams, Regulatory Assurance Mansger, at (815) 234-5441, extension 2280.
If you have any questions regarding this report, please contact Mr. Brad Adams, Regulatory Assurance Mansger, at (815) 234-5441, extension 2280.
Respectfully,
Respectfully, f
              /   $                  f Richard P. Lopriore
/
,    Station Manager Byron Station l
Richard P. Lopriore Station Manager Byron Station RPURC/dpk cc:
RPURC/dpk cc:           Regional Administrator- NRC Region til
Regional Administrator-NRC Region til
                                                                                          #  hg \f 1 NRC Senior Resident inspector - Byron Station W      //
\\f NRC Senior Resident inspector - Byron Station
9909210061 990931 DR ADOCK 05                     4y4 p:\99byltrs\990132. doc A l'tucom Compan3
# hg
//
W 9909210061 990931 DR ADOCK 05 4y4 p:\\99byltrs\\990132. doc A l'tucom Compan3


c.
c.
' ~. . .
' ~
* s x
s x
BYRON STATION UNIT 1 AND UNIT 2 MONTHLY OPERATING REPORT COMMONWEALTH EDISON COMPANY FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 NRC DOCKET NOS. STN 50-454 AND STN 50-455 l
BYRON STATION UNIT 1 AND UNIT 2 MONTHLY OPERATING REPORT COMMONWEALTH EDISON COMPANY FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 NRC DOCKET NOS. STN 50-454 AND STN 50-455 l
            . p:MyttrsW132. doc
. p:MyttrsW132. doc


OPERATING DATA REPORT UNIT ONE DOCKET NO.     50-454 UNIT NAME       Byron One DATE           09/07/99 COMPLETED BY   R. Colalazier TELEPHONE       (815) 234-5441 X2609 REPORTING PERIOD:                 Auoust.1999 (Month / Year)
OPERATING DATA REPORT UNIT ONE DOCKET NO.
MONTH   YEAR TO DATE     CUMULATIVE
50-454 UNIT NAME Byron One DATE 09/07/99 COMPLETED BY R. Colalazier TELEPHONE (815) 234-5441 X2609 REPORTING PERIOD:
: 1.       Design Electrical Rating (Mwe-Net).                   1,120   N/A             N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
Auoust.1999 (Month / Year)
: 2.       Maximum Dependable Capacity (Mwe-Net).               1,105   N/A             N/A         l The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
MONTH YEAR TO DATE CUMULATIVE 1.
3.'       Number of Hours the Reactor was Critical.             744     5,045.63         100,900.03 The total number of hours during the gross hours of the reporting period that the reactor was critical.
Design Electrical Rating (Mwe-Net).
: 4.       Number of Hours the Generator was On Line.           744     5,016.82         99,991.22 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the                                               ;
1,120 N/A N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
generator was on line plus the total outage hours should equal the gross hours in the reporting period.
2.
: 5.       Unit Reserve Shutdown Hours.                         0       0                 38 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.-
Maximum Dependable Capacity (Mwe-Net).
: 6.       Net Electrical Energy (MWH).                         836,935   5,585,199     100,433,535 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station $rvice loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
1,105 N/A N/A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
PA99byltrs\990132. doc
3.'
Number of Hours the Reactor was Critical.
744 5,045.63 100,900.03 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4.
Number of Hours the Generator was On Line.
744 5,016.82 99,991.22 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5.
Unit Reserve Shutdown Hours.
0 0
38 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.-
6.
Net Electrical Energy (MWH).
836,935 5,585,199 100,433,535 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station $rvice loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
PA99byltrs\\990132. doc


_                              1 4
14 r4 e 5 e
r4 e
m 9 a 4 S
5 e       m -        S n  9 a 4 4 O9 l
n 3
a 32        N 5 n7 o )
N O9 a 2 9
                      /  l 9
O l
0 O
4
I o0 C 51        6     T M
/
l 5
n7 o )
0 I
M o0 C 5 6
T r/
1 2
C y9
. 8 (5B0 R(
X A.
E S
V T
.N I
Y T
E B
C~
E M
O'
. DE R
M E ''
tN R
O N M~
1:O O
C T A L H C
t E N m
K E P P
/
E E
a CT TM L S
mr I
c ONAOE U
aS r
DUDCT A
c/
)
p C
Si in
/ r na pT o l cip ir t x TiaE t
l au(
laa n
uumir e nnotnh daa uot t
oMMACO h
te-M12345 S
F
)
N OG) 2 2
(
(
r/
N(
y9        .
W DI O
2    C 5B0        R(8    X    A .
O TN TW D
E      S V      T T .N I
H U T
Y B            C~ E   M E
T H O U
                        . DE O'E ''        :          R      M N M~          tN          R      O 1:O        O      C TA          LHt C
E S D H
E K N                      /                          m EPP              E CT TM L I
M S
ONAOE E       S U
T INU
mrac DUDCT                    A                       aS r
)
c/        )
1(
p C                    Si          in
N O
                                                              / r pT    o nal r cip i
s t
t x l
S u
aa TiaE l
A g
t au( n uumir          e daa  nnotnh t uot hoMMACO t
E u
e- - - - -
R A
M12345 S                            F              )
f o
N                            OG) N( 2 2
h N) t n
OS n
e o
T R I
M a
t A U RO e
in h
m UH t
a D(
g x
9 n
)
E 9
ir in
)
9 u
e n
1 D
D la s
a i
t.
E p
n lp s
L e
x ne x
u n
E itoc E
o E DU iL
(
(
W                            DI O                            O TN D                            H U TW T                            T E H  O                                            _
U
U                                S  D H                            M                                                  _
S                                                                                _
T I
N U                            )
1
(
(
N O          t s
u P ED et ig r
S            u g
A            u E
R          A f
o                                      _
h                                        .
N)        t n                      n              _
OS          o                      e              _
TR I
t M                        a                _
AU          e                    in                -
RO        h                        m              -
UH        t g                      a                _
D(                                  x                .
9 9                n    )              E      )
9              ir u    in                e      n 1          D  D      la                s    i a
E            p              n    lp t.
s        L    e      x          ne          x u              n    E            oc        E o E DU      U      (            it  iL      (
u P ED         n      et s r
c/
c/
ig r          r o
A Y CE n
A   Y CE       O      lue          tsin        r D
r s rt n o
T RH OC   e   e   ia T          eni eEir )n O       FS   n o O n   Fe c n
lue si T RH O
Rav yT a lap ri t      la    -
i T en rr )n D
e nagort                nx I                      t
OC e
: :                        r R       FS   N                           or m      niatosiE t
e a
i eEi c
ri la O
FS n
n Fe Rav lap t
I o
O n n yT a nx t
R FS N
r t
e agort o r
E i
E i
n              nt                   c -
m niatosiE nt c
P                          el             i t (     o U     ipt   nu el   uri ana       re r         d. -
n el i t (
G  E              nuif                             2 o q a egemeph 3
o P
N   T         Y e pd         t 1 .
U G
I T
E ipt el ana r d.
A D        R    sEMRROA                 OO     W R              A M
uri r e
a e-       -------                 s r
2 nu nuif gemeph 3
O                  RABCDEFGH                         R y
N T
P     .
Y o q a e e pd t
M                                     b 9
1 R
O         U   )                                 9 A
sEMRROA OO W
R    N         S   1
I A
(                                 p
T D
a R
A e- - - - - - - -
s O
M RABCDEFGH rRy P
M b9 E
O U
)
9 1
A R
N S
(
p


r UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month of August,1999 l   1. . Safety / Relief valve operations for Unit One. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4.
r UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month of August,1999 l
                          ~ VALVES-     NO & TYPE         PLANT           DESCRIPTION DATE             ACTUATED     ACTUATION         CONDITION       OF EVENT None
: 1.. Safety / Relief valve operations for Unit One. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4.
: 2. Licensee generated changes to ODCM.
~ VALVES-NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None 2.
None
Licensee generated changes to ODCM.
: 3. Indications of failed fuel.
None 3.
Indications of failed fuel.
None. Fuel Reliability Indicator. FRi = 1.00 E-06 Ci/cc.
None. Fuel Reliability Indicator. FRi = 1.00 E-06 Ci/cc.
4,   Licensee Event Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit One, occurring during the reporting period, August 1,1999 through August 31,1999. This information is
4, Licensee Event Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit One, occurring during the reporting period, August 1,1999 through August 31,1999. This information is
        . provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
. provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number                     Date                       Title of Occurrence None l
Occurrence Licensee Event Report Number Date Title of Occurrence None l
p:99bytrs\990132. doc l
p:99bytrs\\990132. doc


1 1
1 OPERATING DATA REPORT UNIT TWO l
'.                                            OPERATING DATA REPORT UNIT TWO l
I DOCKET NO.
DOCKET NO.       50-455                   I UNIT NAME         Byron Two DATE             09/07/99 COMPLETED BY     R. Cololazier TELEPHONE         (815) 234-5441 X2609 REPORTING PERIOD:               Auaust.1999 (Month / Year) j MONTH   YEAR TO DATE       CUMULATIVE 1
50-455 UNIT NAME Byron Two DATE 09/07/99 COMPLETED BY R. Cololazier TELEPHONE (815) 234-5441 X2609 REPORTING PERIOD:
: 1.        Design Electrical Rating (Mwe-Net).                   1,120   N/A               N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
Auaust.1999 (Month / Year) j MONTH YEAR TO DATE CUMULATIVE 1.
: 2.         Maximum Dependable Capacity (Mwe-Net).               1,105   N/A               N/A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.                                                           i
Design Electrical Rating (Mwe-Net).
: 3.         Number of Hours the Reactor was Critical.             744     5,831             93,600.4 The total number of hours during the gross hours of the reporting period that reactor was critical.
1,120 N/A N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
: 4.         Number of Hours the Generator was On Line.           744     5,831             92,877.9 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
2.
: 5.         Unit Reserve Shutdown Hours.                         0       0                   0 The total number of hours during the gross hours of the reporting period that the unit was removed                                           ,
Maximum Dependable Capacity (Mwe-Net).
from service for economic or similar reasons but                                             l was available for operation.                                                                 '
1,105 N/A N/A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
1
3.
: 6.         Net Electrical Energy (MWH).                         838,558 6,556,249         93,544,032 l The gross electrical output of the unit measured at                                         l the output terminals of the turbine-generator minus                                         ]
Number of Hours the Reactor was Critical.
the normal station service loads during the gross                                           l hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
744 5,831 93,600.4 The total number of hours during the gross hours of the reporting period that reactor was critical.
p \99byttrs\990132 doc
4.
Number of Hours the Generator was On Line.
744 5,831 92,877.9 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
5.
Unit Reserve Shutdown Hours.
0 0
0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
1 6.
Net Electrical Energy (MWH).
838,558 6,556,249 93,544,032 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus
]
the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.
p \\99byttrs\\990132 doc


j 1
j 1
4 r4 e 5-o   .
4 r4 e 5 iz o
iz w 9l a    4 3       S 5 T 9         a 2 9     N 5 n 7 lo
. a 4 w 9l 3
                        /
S T 9 a 2 9
4 o
N 5
                                ) 0      O r 0 C     5 6     I 0 y 9
/
                        /      1        T 8 2      C 5 B0 R(             X     A E       S V       T Y            I T      N B           C       E DE           E       M OE          EN           R       M N                         R       O M      T E O TA E           LH          O       C K N                      C                             m EPP    E       /
5 n 7 lo 0
CT   I TM L             E S                         mrac ONAOE                    U                         aS r
O
DUDCT                    A                         c/  p     )
)
Si         in C                       / r pTol   na r cip i
4 o 0 C 5 I
t x l
6 T
aa TiaE l
r
t au(
/
uumirn e daa nnotnh  t uot hoMMACO t
1 2
e- - - - -
0 y 9
M12345 S                             F               )
. 8 5 B0 R(
2 N                             OG) N( 2
X CA E
S V
TN Y
T I
B E
C O
DE E
M E
EN R
M N M T O R
O T A E
E L H O
C K
E P P C
m N
/
E a
CT TM L I
E mr ONAOE S
c DUDCT U
aS rc/
)
A p
Si in C
/ r na pTol cip ir t x TiaE t
l au(
laa n
uumir e
nnotnh daa uot t
oMMACO h
te-M12345 S
F
)2 N
OG)
(
2 W
DiN(
O O l N HuW D
i T
T H O U
E S D H
M S
IT N
)
U 1(
N O
t S
s A
ug E
u R
A fo N) h t
n OS I
n o
T R o
it AU M
a RO e
in UH h
m t
D(
a g
x 9
E 9
in
)
9 n
)
r ia s
i u
e n
1 D
D lp n
lp a
t.
E s
L e
x ne n
oc x
u EDU i
E it L
(
(
W                            Di O                            O l N D                            HuW i
i E
T THO U                            E H                            M  SD S
g L
_          T I
N                            )
U                            1
(
(
N O            t s
u PED et c/
S              u A              g E              u R            A f
ig r
o N)          h n
A YCE n
OS          t n                      o TR I
r s rt n o
o                    i t
TRH O
AU          M in a
lue si r) i T enieEin r
RO            e UH          h                        m D(          t g
:D OC e
a 9                                          x 9                inr
o a
                                                              )
O FS n
n              E        )
w Fe Rav lalp a
9                  u    ia                e s      i n
c ri t
1            D  D      lp                n        a
I o
: t.          E    e      x            ne        lp s          L    n    E              oc          x u
T n n yT a t
g EDU          i      (            it i
r n x R
E u PED         L et           c/ L      (
FS N
r n      r s        ig r
E it e agort r
A   YCE                 lue          tsin          o
nt o
: TRH         O     i T                         r) r D       OC     e   o     a           enieEina O       FS     n w   Fe c n
n m niatosiE c
Rav yT a r lalp ri t e nagort T     t n
el i t (
o x I
o P
R      FS     N r
U G
E P
E ipt el ana r d.
it U
uri r nu e
n     m ipt    elniatosiE nt el uri ana r
2 nuif gemeph 3
i t (
N T
re c
Y o q a e e pd 1
o d.
t 0
G  E                nuif     nu gemeph                 2 3
R sEMRROA OO I
N   T           Y o q a e e pd                   t 1 I
A 9
A            R   sEMRROA OO                         0 9
T D
T R
9 R
D            A M
A a- - - - - - - -
a-e        -------                 9
\\
                                                                                              \
e s
s r
O M
O M
RABCDEFGH                           tt y
RABCDEFGH tt r
P     .                                                  b 9
y P
E   O           U   )                                   9
M b9 E
                                                                                              \
O U
R   N           S   1
)
9
\\
1 R
N S
(
(
p
p


r
r
    ' ~
' ~
UNIQUE REPORTING REQUIREMENTS (UNIT 2) far tro month of August,1999 1,   Safety / Relief valve operations for Unit Two. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4.
UNIQUE REPORTING REQUIREMENTS (UNIT 2) far tro month of August,1999 1,
VALVES       NO & TYPE         PLANT           DESCRIPTION DATlE             ACTUATED     ACTUATION         CONDITION       OF EVENT None
Safety / Relief valve operations for Unit Two. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4.
: 2. Licensee generated changes to ODCM.
VALVES NO & TYPE PLANT DESCRIPTION DATlE ACTUATED ACTUATION CONDITION OF EVENT None 2.
None
Licensee generated changes to ODCM.
: 3. Indications of failed fuel.
None 3.
None.' Fuel Reliability Indicator FRI = 1.00 E-06 pCi/cc
Indications of failed fuel.
: 4. Licensee Event Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit Two, occurring during the reporting period, August 1,1999 through August 31,1999. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
None.' Fuel Reliability Indicator FRI = 1.00 E-06 pCi/cc 4.
I Occurrence Licensee Event Report Number                   Date                       Title of Occurrence None l
Licensee Event Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit Two, occurring during the reporting period, August 1,1999 through August 31,1999. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
l I
I Occurrence Licensee Event Report Number Date Title of Occurrence None l
1 p:\99byttrs\990132. doc I}}
1 p:\\99byttrs\\990132. doc}}

Latest revision as of 07:48, 5 December 2024

Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With
ML20212B926
Person / Time
Site: Byron  
Issue date: 08/31/1999
From: Colglazier R, Lopriore R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-99-0132, NUDOCS 9909210061
Download: ML20212B926 (8)


Text

Cesnunonu(,thh lahwn Comp.in)

11) run (,corrating %tation iISO North (4rrrnan ( hurt h Ro.kl
11) run 11. 6iO l0 979 i TriMIS/H $4:1 September 14,1999 LTR:

BYRON 99-0132 File:

2.7.200 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Monthly Operating Report in accordance with Technical Specification 5.6.4, " Monthly Operating Reports," we are submitting the Monthly Operating Report for Byron Station, Units 1 and 2. This report covers the period August 1,1999, to August 31,1999.

If you have any questions regarding this report, please contact Mr. Brad Adams, Regulatory Assurance Mansger, at (815) 234-5441, extension 2280.

Respectfully, f

/

Richard P. Lopriore Station Manager Byron Station RPURC/dpk cc:

Regional Administrator-NRC Region til

\\f NRC Senior Resident inspector - Byron Station

  1. hg

//

W 9909210061 990931 DR ADOCK 05 4y4 p:\\99byltrs\\990132. doc A l'tucom Compan3

c.

' ~

s x

BYRON STATION UNIT 1 AND UNIT 2 MONTHLY OPERATING REPORT COMMONWEALTH EDISON COMPANY FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 NRC DOCKET NOS. STN 50-454 AND STN 50-455 l

. p:MyttrsW132. doc

OPERATING DATA REPORT UNIT ONE DOCKET NO.

50-454 UNIT NAME Byron One DATE 09/07/99 COMPLETED BY R. Colalazier TELEPHONE (815) 234-5441 X2609 REPORTING PERIOD:

Auoust.1999 (Month / Year)

MONTH YEAR TO DATE CUMULATIVE 1.

Design Electrical Rating (Mwe-Net).

1,120 N/A N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2.

Maximum Dependable Capacity (Mwe-Net).

1,105 N/A N/A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.

3.'

Number of Hours the Reactor was Critical.

744 5,045.63 100,900.03 The total number of hours during the gross hours of the reporting period that the reactor was critical.

4.

Number of Hours the Generator was On Line.

744 5,016.82 99,991.22 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

5.

Unit Reserve Shutdown Hours.

0 0

38 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.-

6.

Net Electrical Energy (MWH).

836,935 5,585,199 100,433,535 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the normal station $rvice loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.

PA99byltrs\\990132. doc

14 r4 e 5 e

m 9 a 4 S

n 3

N O9 a 2 9

O l

4

/

l 5

n7 o )

0 I

M o0 C 5 6

T r/

1 2

C y9

. 8 (5B0 R(

X A.

E S

V T

.N I

Y T

E B

C~

E M

O'

. DE R

M E

tN R

O N M~

1:O O

C T A L H C

t E N m

K E P P

/

E E

a CT TM L S

mr I

c ONAOE U

aS r

DUDCT A

c/

)

p C

Si in

/ r na pT o l cip ir t x TiaE t

l au(

laa n

uumir e nnotnh daa uot t

oMMACO h

te-M12345 S

F

)

N OG) 2 2

(

N(

W DI O

O TN TW D

H U T

T H O U

E S D H

M S

T INU

)

1(

N O

s t

S u

A g

E u

R A

f o

h N) t n

OS n

e o

T R I

M a

t A U RO e

in h

m UH t

a D(

g x

9 n

)

E 9

ir in

)

9 u

e n

1 D

D la s

a i

t.

E p

n lp s

L e

x ne x

u n

E itoc E

o E DU iL

(

U

(

u P ED et ig r

c/

A Y CE n

r s rt n o

lue si T RH O

i T en rr )n D

OC e

e a

i eEi c

ri la O

FS n

n Fe Rav lap t

I o

O n n yT a nx t

R FS N

r t

e agort o r

E i

m niatosiE nt c

n el i t (

o P

U G

E ipt el ana r d.

uri r e

2 nu nuif gemeph 3

N T

Y o q a e e pd t

1 R

sEMRROA OO W

I A

T D

a R

A e- - - - - - - -

s O

M RABCDEFGH rRy P

M b9 E

O U

)

9 1

A R

N S

(

p

r UNIQUE REPORTING REQUIREMENTS (UNIT 1) for the month of August,1999 l

1.. Safety / Relief valve operations for Unit One. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4.

~ VALVES-NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None 2.

Licensee generated changes to ODCM.

None 3.

Indications of failed fuel.

None. Fuel Reliability Indicator. FRi = 1.00 E-06 Ci/cc.

4, Licensee Event Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit One, occurring during the reporting period, August 1,1999 through August 31,1999. This information is

. provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence None l

p:99bytrs\\990132. doc

1 OPERATING DATA REPORT UNIT TWO l

I DOCKET NO.

50-455 UNIT NAME Byron Two DATE 09/07/99 COMPLETED BY R. Cololazier TELEPHONE (815) 234-5441 X2609 REPORTING PERIOD:

Auaust.1999 (Month / Year) j MONTH YEAR TO DATE CUMULATIVE 1.

Design Electrical Rating (Mwe-Net).

1,120 N/A N/A The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

2.

Maximum Dependable Capacity (Mwe-Net).

1,105 N/A N/A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.

3.

Number of Hours the Reactor was Critical.

744 5,831 93,600.4 The total number of hours during the gross hours of the reporting period that reactor was critical.

4.

Number of Hours the Generator was On Line.

744 5,831 92,877.9 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus. The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

5.

Unit Reserve Shutdown Hours.

0 0

0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.

1 6.

Net Electrical Energy (MWH).

838,558 6,556,249 93,544,032 The gross electrical output of the unit measured at the output terminals of the turbine-generator minus

]

the normal station service loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.

p \\99byttrs\\990132 doc

j 1

4 r4 e 5 iz o

. a 4 w 9l 3

S T 9 a 2 9

N 5

/

5 n 7 lo 0

O

)

4 o 0 C 5 I

6 T

r

/

1 2

0 y 9

. 8 5 B0 R(

X CA E

S V

TN Y

T I

B E

C O

DE E

M E

EN R

M N M T O R

O T A E

E L H O

C K

E P P C

m N

/

E a

CT TM L I

E mr ONAOE S

c DUDCT U

aS rc/

)

A p

Si in C

/ r na pTol cip ir t x TiaE t

l au(

laa n

uumir e

nnotnh daa uot t

oMMACO h

te-M12345 S

F

)2 N

OG)

(

2 W

DiN(

O O l N HuW D

i T

T H O U

E S D H

M S

IT N

)

U 1(

N O

t S

s A

ug E

u R

A fo N) h t

n OS I

n o

T R o

it AU M

a RO e

in UH h

m t

D(

a g

x 9

E 9

in

)

9 n

)

r ia s

i u

e n

1 D

D lp n

lp a

t.

E s

L e

x ne n

oc x

u EDU i

E it L

(

i E

g L

(

u PED et c/

ig r

A YCE n

r s rt n o

TRH O

lue si r) i T enieEin r

D OC e

o a

O FS n

w Fe Rav lalp a

c ri t

I o

T n n yT a t

r n x R

FS N

E it e agort r

nt o

n m niatosiE c

el i t (

o P

U G

E ipt el ana r d.

uri r nu e

2 nuif gemeph 3

N T

Y o q a e e pd 1

t 0

R sEMRROA OO I

A 9

T D

9 R

A a- - - - - - - -

\\

e s

O M

RABCDEFGH tt r

y P

M b9 E

O U

)

9

\\

1 R

N S

(

p

r

' ~

UNIQUE REPORTING REQUIREMENTS (UNIT 2) far tro month of August,1999 1,

Safety / Relief valve operations for Unit Two. This information is provided pursuant to the reporting requirements contained in Technical Specification 5.6.4.

VALVES NO & TYPE PLANT DESCRIPTION DATlE ACTUATED ACTUATION CONDITION OF EVENT None 2.

Licensee generated changes to ODCM.

None 3.

Indications of failed fuel.

None.' Fuel Reliability Indicator FRI = 1.00 E-06 pCi/cc 4.

Licensee Event Reports The following is a tabular summary of all Licensee Event Reports for Byron Station, Unit Two, occurring during the reporting period, August 1,1999 through August 31,1999. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

I Occurrence Licensee Event Report Number Date Title of Occurrence None l

1 p:\\99byttrs\\990132. doc