                                                              U.S. NUCLEAR REGULATORY COMISSION
U.S. NUCLEAR REGULATORY COMISSION
                                                                          REGION III
REGION III
                        Report No. 50-002/86002.(DRP)
Report No. 50-002/86002.(DRP)
                        Docket No. 50-002                                                                   License No. R-28
Docket No. 50-002
                        Licensee: University of Michigan
License No. R-28
                          v              Michigan Memorial-Phoenix Project
Licensee: University of Michigan
                                          Phoenix Memorial Laboratory
Michigan Memorial-Phoenix Project
                                          Ann Arbor, MI 48105
v
                        Facility Name:           Ford Nuclear Reactor
Phoenix Memorial Laboratory
f'S 0                   Inspectian Conducted: December 9-11, 1986
Ann Arbor, MI 48105
                        Inspector:       C. H. Brown
Facility Name:
Ford Nuclear Reactor
f'S 0
Inspectian Conducted: December 9-11, 1986
Inspector:
C. H. Brown
i
i
                                                    Mbb
                                                  .
(
(
Mbb
.
Approved By: .. L. Forney', hief
^/Jo/pc
l
l
                        Approved By: .. L. Forney', hief                                                    ^/Jo/pc
Peactor Projects Section IA
                                            Peactor Projects Section IA                                     Dat'e
Dat'e
                                            t
t
                        Inspection Summar)               1
Inspection Summar)
                        Inspection on December 9-11, 1986 (Report No. 50-002/86002(DRP))
1
                        Areas Inspected: Routine, unannounceo inspection of organization, logs
Inspection on December 9-11, 1986 (Report No. 50-002/86002(DRP))
                        and records, reviews and audits, requalification training, procedures,
Areas Inspected: Routine, unannounceo inspection of organization, logs
                        surveillance (maintenance), experiments, refueling, transportation
and records, reviews and audits, requalification training, procedures,
                        activities, review of periodic and special reports, and radiation control.
surveillance (maintenance), experiments, refueling, transportation
            b
activities, review of periodic and special reports, and radiation control.
              ,        Results: No violations were identified in the areas inspected,
Results: No violations were identified in the areas inspected,
    't
,
        x s      ,
b
                                      -
't
                                              '
x
  .:
-
  i                                  ~
,
            w1
s
                  <
'
                    _,/'
.:i
                            s
~
                              ~
w1
                      *        ''w
<
                                                          .,
_,/'
                                                      : *
s
                                                  Ig
*
                    ,s    'i 070105%k$h0OO2
~ ''w
                                PDR     A                   PDR
.,
                  g           O
:
I
*
g
070105%k$h0OO2
PDR
A
PDR
'i
,s
g
O
2
2
                        s(
s(
                                                -               - ___         _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
- ___
_ _ _ _ _ _ _ _ _ _ _ _ _ _


        .
.
      .
.
    .g
.g
                                              '
'
.                                                     DETAILS
.
              1.   Persons Contacted
DETAILS
1.
Persons Contacted
'
'
                                                                                              "
*R. Burn, Reactor Manager
                    *R. Burn, Reactor Manager
"
                    *G. Cook, Assistant Reactor Manager
*G. Cook, Assistant Reactor Manager
                    *M. Driscoll, Health Physicist
*M. Driscoll, Health Physicist
                      P. Simpson, Reactor Operator
P. Simpson, Reactor Operator
                                    ')
')
                    * Denotes those present at one or more exit interviews.
* Denotes those present at one or more exit interviews.
                                        ''
''
              2. % General
2. % General
                -
-
                    This inspection was conducted to examine the research reactor program
This inspection was conducted to examine the research reactor program
                    atithe University of Michigan. The facility was toured shortly after
atithe University of Michigan. The facility was toured shortly after
                    arrival at the laboratory. The general housekeeping was found to be
arrival at the laboratory. The general housekeeping was found to be
                    satisfactory. ~ The reactor is generally operated 24 hours a day for a
satisfactory. ~ The reactor is generally operated 24 hours a day for a
  ,                5-day week. One half of the run time is presently being used for
5-day week. One half of the run time is presently being used for
                  1 training and the, other half for irradiations. The water loss from the
,
                '
' 1 training and the, other half for irradiations. The water loss from the
                    pool remains at approximately the historical amount of 250 gallons per
pool remains at approximately the historical amount of 250 gallons per
                    day. The majority of this loss is by evaporation. The pool leakage
day. The majority of this loss is by evaporation. The pool leakage
            -
-
                    (100 gallon per day) component usually increases during the winter due
(100 gallon per day) component usually increases during the winter due
    ,              to the heatirig and cooling of the structure. The pool leakage is
to the heatirig and cooling of the structure. The pool leakage is
                    collected and. processed as rad waste. The high enriched uranium (HEU)
,
                    fuel- stored onsite was recently measured and found to be self
collected and. processed as rad waste. The high enriched uranium (HEU)
                    protecting. The HEU is to be shipped as soon as the shipping cask
fuel- stored onsite was recently measured and found to be self
                    becomes available.
protecting. The HEU is to be shipped as soon as the shipping cask
d.                 An NRC licensing exam was given to two operators in October 1986. One
becomes available.
                    operator passed all sections. The other operator did not pass the
d.
          ,; -     theory section and a retest was requested.
An NRC licensing exam was given to two operators in October 1986. One
              3.   Organization, Loc: and Records (39745)
operator passed all sections. The other operator did not pass the
        .
,; -
                    The facility organization was reviewed and verified to be consistent with
theory section and a retest was requested.
                    the Technical Specifications. The minimum staffing requirements were
3.
                    verified to be present during reactor operation, and fuel
Organization, Loc: and Records (39745)
                    handling / refueling operations.
.
                    The reactor logs and records were reviewa4 to v. rify that:
The facility organization was reviewed and verified to be consistent with
                    a.     Records were available for inspect $ca.
the Technical Specifications. The minimum staffing requirements were
                    b.     Required entries were made,
verified to be present during reactor operation, and fuel
                    c.     Significant problems or incidents were documented,
handling / refueling operations.
                    d.     The facility was being maintained properly.
The reactor logs and records were reviewa4 to v. rify that:
                  -The facility has nine licensed personnel at the present time. One
a.
                    operator recently passed his license exam and another should be taking
Records were available for inspect $ca.
                    his re-exam in the near future.
b.
                    No violations or deviations were identified.
Required entries were made,
                                                          2
c.
Significant problems or incidents were documented,
d.
The facility was being maintained properly.
-The facility has nine licensed personnel at the present time. One
operator recently passed his license exam and another should be taking
his re-exam in the near future.
No violations or deviations were identified.
2


                                                                                .         -
.
                                                                                              .
-
  .
.
    .
.
                                                                                                      ;
.
      4.   Reviews and Audits (40745)                                                               .
;
4.
Reviews and Audits (40745)
.
2
2
            The licensee's review and audit program records were examined by the
The licensee's review and audit program records were examined by the
            inspector to verify that:
inspector to verify that:
          a.       Reviews of facility changes, operating and maintenance procedures,
a.
                    design changes, and unreviewed experiments had been conducted by a
Reviews of facility changes, operating and maintenance procedures,
                    safety review cannittee as required by Technical Specifications.
design changes, and unreviewed experiments had been conducted by a
          b.       That the review committee and/or subcommittees were composed of
safety review cannittee as required by Technical Specifications.
                    qualified members and that quorum requirements and frequency of
b.
                    meetings had been met.
That the review committee and/or subcommittees were composed of
          c.       Required safety audits had been conducted in accordance with
qualified members and that quorum requirements and frequency of
meetings had been met.
c.
Required safety audits had been conducted in accordance with
Technical Specification requirements and that any identified
4
4
                    Technical Specification requirements and that any identified
problems were resolved.
                    problems were resolved.
The bylaws of the Safety Review Committee (SRC) allow individual polling
          The bylaws of the Safety Review Committee (SRC) allow individual polling
of the committee members if a quorum is not present. The licensee stated
          of the committee members if a quorum is not present. The licensee stated
that polling procedure has not been used since it was approved.
          that polling procedure has not been used since it was approved.                           '
:          A review of the Nuclear Reactor Committee meetings indicated the
          committee was meeting all requirements.
          No violations or deviations were identified.
      5.  Requalification Training (41745)
          The inspector reviewed procedures, logs, and training records; and
          interviewed personnel to verify that the requalification training program
          was being carried out in conformance with the facility's approved plan
'
'
          and NRC regulations. The 'requalification examinations had been conducted
:
          in 1985 and 1986. The inspector reviewed selected portions of the
A review of the Nuclear Reactor Committee meetings indicated the
;        _ completed 1985 training programs and portions of the partially completed
committee was meeting all requirements.
.
No violations or deviations were identified.
          1986 training programs.
5.
,          No violations or deviations were identified.
Requalification Training (41745)
      6.  Procedures
The inspector reviewed procedures, logs, and training records; and
                                                                                                      P
interviewed personnel to verify that the requalification training program
          The inspector reviewed the licensee's procedures to detennine if
was being carried out in conformance with the facility's approved plan
and NRC regulations. The 'requalification examinations had been conducted
'
in 1985 and 1986. The inspector reviewed selected portions of the
_ completed 1985 training programs and portions of the partially completed
;
1986 training programs.
.
No violations or deviations were identified.
,
,
          procedures were issued, reviewed,_ changed or updated, and approved in
6.
          accordance with Technical Specifications and SAR requirements. This
Procedures
          review also verified:
P
          a.         That procedure content was adequhte to safely operate, refuel and
The inspector reviewed the licensee's procedures to detennine if
                    maintain the facility.                                                           -
procedures were issued, reviewed,_ changed or updated, and approved in
          b.         That responsibilities were clearly defined.
,
          c.         That required checklists and forms were used.
accordance with Technical Specifications and SAR requirements. This
:
review also verified:
                                                      3
a.
              , _ _           _ _ . _ . . - . . . - _    _ _ _ . _ ~ _ _ . . ,       _. _
That procedure content was adequhte to safely operate, refuel and
                                                                                            -
maintain the facility.
                                                                                                _ _ .
-
b.
That responsibilities were clearly defined.
c.
That required checklists and forms were used.
:
3
, _ _
.
. . - . . . -
.
_ _ _ . _ ~ _ _ . . ,
_. _
-
_ _ .


                                                                                        .
.
          .
.
          .
.
        .
.
                    The licensee has incorporated most operating and administrative
The licensee has incorporated most operating and administrative
                    procedures into a word processor during the last few years. During
procedures into a word processor during the last few years. During
                    this period, the SRC had reviewed cperational, administrative, and
this period, the SRC had reviewed cperational, administrative, and
                    maintenance (surveillance) procedures. The format used with word
maintenance (surveillance) procedures. The format used with word
                    . processor for the procedures is the generic format. The procedure for
. processor for the procedures is the generic format. The procedure for
                    writing procedures was reviewed and was considered adequate. The
writing procedures was reviewed and was considered adequate. The
                      inspector determined that the required procedures were available to the
inspector determined that the required procedures were available to the
                    operators and a selected number of administrative, operational and
operators and a selected number of administrative, operational and
                    maintenance and surveillance procedures were reviewed and found to be
maintenance and surveillance procedures were reviewed and found to be
                    satisfactory.
satisfactory.
                    No violations or deviations were identified.
No violations or deviations were identified.
              7.   Surveillance (Maintenance) (61745)
7.
                    The inspector reviewed procedures, surveillance test schedules and test
Surveillance (Maintenance) (61745)
                    records and discussed the surveillance program with responsible personnel
The inspector reviewed procedures, surveillance test schedules and test
                    to verify:
records and discussed the surveillance program with responsible personnel
                    a.     That when necessary, procedures were available and adequate to
to verify:
                            perform tests,
a.
                    b.     That tests were completed within the required time schedule.
That when necessary, procedures were available and adequate to
                    c.     Test. records were available.
perform tests,
,                    The licensee's surveillance program appeared to be satisfactory.
b.
                    No violations or deviations were identified.
That tests were completed within the required time schedule.
              8.   Experiments (69745)
c.
                    The inspector verified by reviewing experiment records and other reactor
Test. records were available.
                    logs that:
The licensee's surveillance program appeared to be satisfactory.
;                   a.     Experiments were conducted using approved procedures and under
,
                            approved reactor conditions,
No violations or deviations were identified.
                    b.     New experiments or changes in experiments were properly reviewed
8.
                            and approved,
Experiments (69745)
                    c.     The experiments did not involve an unreviewed safety question,
The inspector verified by reviewing experiment records and other reactor
                            i.e.,10 CFR 50.59 requirements regarding experiments were met.
logs that:
                    d.     Experiments involving potential hazards or reactivity changes were
;
                            identified in procedures.
a.
                    e.      Reactivity limits were not or could not have been exceeded during
Experiments were conducted using approved procedures and under
                            an experiment. The inspector reviewed several experiment approval
approved reactor conditions,
                            sheets and noted that the procedures had been followed and the
b.
                            completed forms were available to the operator.
New experiments or changes in experiments were properly reviewed
                    No violations or deviations were identified.
and approved,
                                                                                    4
c.
  . . .     .
The experiments did not involve an unreviewed safety question,
                  .       .
i.e.,10 CFR 50.59 requirements regarding experiments were met.
                                    .     _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ -   _
d.
Experiments involving potential hazards or reactivity changes were
identified in procedures.
Reactivity limits were not or could not have been exceeded during
e.
an experiment. The inspector reviewed several experiment approval
sheets and noted that the procedures had been followed and the
completed forms were available to the operator.
No violations or deviations were identified.
4
. . .
.
.
.
.
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ -
_


W- T
W-
    .
T
    .
.
  .
.
      9.     Refueling (60745)
.
            The refueling and fuel handling procedures were reviewed by the
9.
              inspector. The review included confirming that approved procedures for
Refueling (60745)
            refueling and fuel element movements were available, and the adequacy of
The refueling and fuel handling procedures were reviewed by the
              the procedural statements of Technical Specifications and security plan
inspector. The review included confirming that approved procedures for
            requirements. The technical adequacy of radiation protection and
refueling and fuel element movements were available, and the adequacy of
            criticality " safety" appeared satisfactory. The review of the records
the procedural statements of Technical Specifications and security plan
              indicated that refueling was performed per the procedures.
requirements. The technical adequacy of radiation protection and
            No violations or deviations were identified.
criticality " safety" appeared satisfactory. The review of the records
      10. TransportationActivities(86740)
indicated that refueling was performed per the procedures.
            Transportation activities were not reviewed during this inspection as the
No violations or deviations were identified.
            licensee is awaiting the arrival of the fuel shipping cask to complete
10. TransportationActivities(86740)
            the removal of the remaining HEU fuel elements.
Transportation activities were not reviewed during this inspection as the
      11.   Review of Periodic and Special Reports (90713)
licensee is awaiting the arrival of the fuel shipping cask to complete
            The inspector reviewed the 1985 annual report and the Report on Reactor
the removal of the remaining HEU fuel elements.
            Operations, a reactor refuel cycle report, for the previous nine 28 day
11.
            cycles ending October 11, 1986. The number of unscheduled shutdowns were
Review of Periodic and Special Reports (90713)
            noted to be higher than the historical average, but a negative trend was
The inspector reviewed the 1985 annual report and the Report on Reactor
            not noted. The Emergency Drill had been performed on November 11, 1986,
Operations, a reactor refuel cycle report, for the previous nine 28 day
            and the critique was held and a report written to the SRC for their
cycles ending October 11, 1986. The number of unscheduled shutdowns were
            review.
noted to be higher than the historical average, but a negative trend was
            No violations cr deviations were identified.
not noted. The Emergency Drill had been performed on November 11, 1986,
      12. Radwaste Control     (83743)
and the critique was held and a report written to the SRC for their
            The inspector reviewed the posted areas and some of the waste discharges.
review.
            The signs and posted areas were noted to be adequate. The gaseous and
No violations cr deviations were identified.
            liquid discharges in the Semi-Annual Report for 1986 were compared to
12. Radwaste Control
            the same period in 1985 in an internal memo and a considerable decrease
(83743)
            was noted as the results of the efforts made to reduce the amount of
The inspector reviewed the posted areas and some of the waste discharges.
            discharge. The reactor and the lab discharges are combined in the
The signs and posted areas were noted to be adequate. The gaseous and
            report. The controllable amounts discharged were substantially reduced
liquid discharges in the Semi-Annual Report for 1986 were compared to
            by use of filters, resins, and other controls.
the same period in 1985 in an internal memo and a considerable decrease
            No violations or deviations were identified.
was noted as the results of the efforts made to reduce the amount of
      13. Previous Inspection Items
discharge.
            (Closed) 50-002/85004-01 Notice of Violation. A Notice of Violation
The reactor and the lab discharges are combined in the
            was issued to the facility for failure to conform to Section 6.1(1) of
report. The controllable amounts discharged were substantially reduced
            the Technical Specifications (TS) which states that the organization
by use of filters, resins, and other controls.
            structure shall have the position of Supervisor of Reactor Operations
No violations or deviations were identified.
            in the line organization. The person filling this position had resigned
13. Previous Inspection Items
            in April 1985 and the licensee had not filled the position at the time
(Closed) 50-002/85004-01 Notice of Violation. A Notice of Violation
            of the inspection. The licensee agreed to submit a TS revision to delete
was issued to the facility for failure to conform to Section 6.1(1) of
                                                5
the Technical Specifications (TS) which states that the organization
structure shall have the position of Supervisor of Reactor Operations
in the line organization. The person filling this position had resigned
in April 1985 and the licensee had not filled the position at the time
of the inspection. The licensee agreed to submit a TS revision to delete
5


    :
:
  ..
..
            this position in the line organization. The submittal has been made.
this position in the line organization. The submittal has been made.
            The duties of the position were assumed at the time of the resignation by
The duties of the position were assumed at the time of the resignation by
            the Reactor Manager and the Assistant Reactor Manager. The facility
the Reactor Manager and the Assistant Reactor Manager. The facility
            procedures have been revised accordingly. This item is considered
procedures have been revised accordingly. This item is considered
            closed.
closed.
14. Exit Interview (30703)
,
,
      14. Exit Interview (30703)
The inspector met with the licensee representatives (denoted in Paragraph
            The inspector met with the licensee representatives (denoted in Paragraph
1) at the conclusion of the inspection and summarized the findings. The
            1) at the conclusion of the inspection and summarized the findings. The
inspector discussed the content of the inspection report and the licensee
            inspector discussed the content of the inspection report and the licensee
did not identify any_ material that was considered proprietary.
,
,
            did not identify any_ material that was considered proprietary.
No violations or deviations were identified.
            No violations or deviations were identified.
.
                                                                                                            .
d
d
                                                  6
6
              . _ . . _.         _ . _ _ . _ _ _ . _ . . _ _ _ _ . - _ _ _ .--.___ _ _ _ _ ____ ._._ . __
.
. .
_.
_ . _ _ . _ _
_
. _ . . _ _ _ _ . - _ _ _
.--.___ _ _ _ _ ____ ._._ . __
}}
}}

Latest revision as of 06:29, 4 December 2024

Insp Rept 50-002/86-02 on 861209-11.No Violations Noted. Major Areas Inspected:Organization,Logs & Records,Reviews & Audits,Requalification Training,Surveillance & Maint, Refueling,Transportation & Radiation Control
ML20212E313
Person / Time
Site: University of Michigan
Issue date: 12/30/1986
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20212E283 List:
References
50-002-86-02-01, 50-2-86-2-1, NUDOCS 8701050295
Download: ML20212E313 (5)


See also: IR 05000002/1986002

Text

,

.

..

U.S. NUCLEAR REGULATORY COMISSION

REGION III

Report No. 50-002/86002.(DRP)

Docket No.50-002

License No. R-28

Licensee: University of Michigan

Michigan Memorial-Phoenix Project

v

Phoenix Memorial Laboratory

Ann Arbor, MI 48105

Facility Name:

Ford Nuclear Reactor

f'S 0

Inspectian Conducted: December 9-11, 1986

Inspector:

C. H. Brown

i

(

Mbb

.

Approved By: .. L. Forney', hief

^/Jo/pc

l

Peactor Projects Section IA

Dat'e

t

Inspection Summar)

1

Inspection on December 9-11, 1986 (Report No. 50-002/86002(DRP))

Areas Inspected: Routine, unannounceo inspection of organization, logs

and records, reviews and audits, requalification training, procedures,

surveillance (maintenance), experiments, refueling, transportation

activities, review of periodic and special reports, and radiation control.

Results: No violations were identified in the areas inspected,

,

b

't

x

-

,

s

'

.:i

~

w1

<

_,/'

s

~ w

.,

I

g

070105%k$h0OO2

PDR

A

PDR

'i

,s

g

O

2

s(

-

- ___

_ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

.g

'

.

DETAILS

1.

Persons Contacted

'

  • R. Burn, Reactor Manager

"

  • G. Cook, Assistant Reactor Manager
  • M. Driscoll, Health Physicist

P. Simpson, Reactor Operator

')

  • Denotes those present at one or more exit interviews.

2. % General

-

This inspection was conducted to examine the research reactor program

atithe University of Michigan. The facility was toured shortly after

arrival at the laboratory. The general housekeeping was found to be

satisfactory. ~ The reactor is generally operated 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day for a

5-day week. One half of the run time is presently being used for

,

' 1 training and the, other half for irradiations. The water loss from the

pool remains at approximately the historical amount of 250 gallons per

day. The majority of this loss is by evaporation. The pool leakage

-

(100 gallon per day) component usually increases during the winter due

to the heatirig and cooling of the structure. The pool leakage is

,

collected and. processed as rad waste. The high enriched uranium (HEU)

fuel- stored onsite was recently measured and found to be self

protecting. The HEU is to be shipped as soon as the shipping cask

becomes available.

d.

An NRC licensing exam was given to two operators in October 1986. One

operator passed all sections. The other operator did not pass the

,; -

theory section and a retest was requested.

3.

Organization, Loc: and Records (39745)

.

The facility organization was reviewed and verified to be consistent with

the Technical Specifications. The minimum staffing requirements were

verified to be present during reactor operation, and fuel

handling / refueling operations.

The reactor logs and records were reviewa4 to v. rify that:

a.

Records were available for inspect $ca.

b.

Required entries were made,

c.

Significant problems or incidents were documented,

d.

The facility was being maintained properly.

-The facility has nine licensed personnel at the present time. One

operator recently passed his license exam and another should be taking

his re-exam in the near future.

No violations or deviations were identified.

2

.

-

.

.

.

4.

Reviews and Audits (40745)

.

2

The licensee's review and audit program records were examined by the

inspector to verify that:

a.

Reviews of facility changes, operating and maintenance procedures,

design changes, and unreviewed experiments had been conducted by a

safety review cannittee as required by Technical Specifications.

b.

That the review committee and/or subcommittees were composed of

qualified members and that quorum requirements and frequency of

meetings had been met.

c.

Required safety audits had been conducted in accordance with

Technical Specification requirements and that any identified

4

problems were resolved.

The bylaws of the Safety Review Committee (SRC) allow individual polling

of the committee members if a quorum is not present. The licensee stated

that polling procedure has not been used since it was approved.

'

A review of the Nuclear Reactor Committee meetings indicated the

committee was meeting all requirements.

No violations or deviations were identified.

5.

Requalification Training (41745)

The inspector reviewed procedures, logs, and training records; and

interviewed personnel to verify that the requalification training program

was being carried out in conformance with the facility's approved plan

and NRC regulations. The 'requalification examinations had been conducted

'

in 1985 and 1986. The inspector reviewed selected portions of the

_ completed 1985 training programs and portions of the partially completed

1986 training programs.

.

No violations or deviations were identified.

,

6.

Procedures

P

The inspector reviewed the licensee's procedures to detennine if

procedures were issued, reviewed,_ changed or updated, and approved in

,

accordance with Technical Specifications and SAR requirements. This

review also verified:

a.

That procedure content was adequhte to safely operate, refuel and

maintain the facility.

-

b.

That responsibilities were clearly defined.

c.

That required checklists and forms were used.

3

, _ _

.

. . - . . . -

.

_ _ _ . _ ~ _ _ . . ,

_. _

-

_ _ .

.

.

.

.

The licensee has incorporated most operating and administrative

procedures into a word processor during the last few years. During

this period, the SRC had reviewed cperational, administrative, and

maintenance (surveillance) procedures. The format used with word

. processor for the procedures is the generic format. The procedure for

writing procedures was reviewed and was considered adequate. The

inspector determined that the required procedures were available to the

operators and a selected number of administrative, operational and

maintenance and surveillance procedures were reviewed and found to be

satisfactory.

No violations or deviations were identified.

7.

Surveillance (Maintenance) (61745)

The inspector reviewed procedures, surveillance test schedules and test

records and discussed the surveillance program with responsible personnel

to verify:

a.

That when necessary, procedures were available and adequate to

perform tests,

b.

That tests were completed within the required time schedule.

c.

Test. records were available.

The licensee's surveillance program appeared to be satisfactory.

,

No violations or deviations were identified.

8.

Experiments (69745)

The inspector verified by reviewing experiment records and other reactor

logs that:

a.

Experiments were conducted using approved procedures and under

approved reactor conditions,

b.

New experiments or changes in experiments were properly reviewed

and approved,

c.

The experiments did not involve an unreviewed safety question,

i.e.,10 CFR 50.59 requirements regarding experiments were met.

d.

Experiments involving potential hazards or reactivity changes were

identified in procedures.

Reactivity limits were not or could not have been exceeded during

e.

an experiment. The inspector reviewed several experiment approval

sheets and noted that the procedures had been followed and the

completed forms were available to the operator.

No violations or deviations were identified.

4

. . .

.

.

.

.

_ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ -

_

W-

T

.

.

.

9.

Refueling (60745)

The refueling and fuel handling procedures were reviewed by the

inspector. The review included confirming that approved procedures for

refueling and fuel element movements were available, and the adequacy of

the procedural statements of Technical Specifications and security plan

requirements. The technical adequacy of radiation protection and

criticality " safety" appeared satisfactory. The review of the records

indicated that refueling was performed per the procedures.

No violations or deviations were identified.

10. TransportationActivities(86740)

Transportation activities were not reviewed during this inspection as the

licensee is awaiting the arrival of the fuel shipping cask to complete

the removal of the remaining HEU fuel elements.

11.

Review of Periodic and Special Reports (90713)

The inspector reviewed the 1985 annual report and the Report on Reactor

Operations, a reactor refuel cycle report, for the previous nine 28 day

cycles ending October 11, 1986. The number of unscheduled shutdowns were

noted to be higher than the historical average, but a negative trend was

not noted. The Emergency Drill had been performed on November 11, 1986,

and the critique was held and a report written to the SRC for their

review.

No violations cr deviations were identified.

12. Radwaste Control

(83743)

The inspector reviewed the posted areas and some of the waste discharges.

The signs and posted areas were noted to be adequate. The gaseous and

liquid discharges in the Semi-Annual Report for 1986 were compared to

the same period in 1985 in an internal memo and a considerable decrease

was noted as the results of the efforts made to reduce the amount of

discharge.

The reactor and the lab discharges are combined in the

report. The controllable amounts discharged were substantially reduced

by use of filters, resins, and other controls.

No violations or deviations were identified.

13. Previous Inspection Items

(Closed) 50-002/85004-01 Notice of Violation. A Notice of Violation

was issued to the facility for failure to conform to Section 6.1(1) of

the Technical Specifications (TS) which states that the organization

structure shall have the position of Supervisor of Reactor Operations

in the line organization. The person filling this position had resigned

in April 1985 and the licensee had not filled the position at the time

of the inspection. The licensee agreed to submit a TS revision to delete

5

..

this position in the line organization. The submittal has been made.

The duties of the position were assumed at the time of the resignation by

the Reactor Manager and the Assistant Reactor Manager. The facility

procedures have been revised accordingly. This item is considered

closed.

14. Exit Interview (30703)

,

The inspector met with the licensee representatives (denoted in Paragraph

1) at the conclusion of the inspection and summarized the findings. The

inspector discussed the content of the inspection report and the licensee

did not identify any_ material that was considered proprietary.

,

No violations or deviations were identified.

.