{{#Wiki_filter:_
[             ') Commonwealth Edloon
[
                            - One First National Plaza Chicago, Illinois
') Commonwealth Edloon
              ;\     ''      l Address Reply to: Post Office Box 767
- One First National Plaza Chicago, Illinois
                \               Chicago, Illinois 60690 - 0767 January 21, 1987 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC.               20555 Subj ect: Byron Station Unit 2 Fire Protection NRC Docket No. 50-455
;\\
l Address Reply to: Post Office Box 767
\\
Chicago, Illinois 60690 - 0767 January 21, 1987 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC.
20555 Subj ect: Byron Station Unit 2 Fire Protection NRC Docket No. 50-455


==Reference:==
==Reference:==
Line 26: Line 30:


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
Reference (a) provided a listing of NFPA Code deviations for Byron Unit 2 which were not identified on the Byron Unit I list. Attached is a revised listing of NFPA Code deviations for Byron Unit 2.
Reference (a) provided a listing of NFPA Code deviations for Byron Unit 2 which were not identified on the Byron Unit I list. Attached is a revised listing of NFPA Code deviations for Byron Unit 2. This list has been revised to deletc a deviation from NFPA 30 regarding an overflow line for the diesel oil storage tanks in the river screen house and to correct some typographical errors on the list.
This list has been revised to deletc a deviation from NFPA 30 regarding an overflow line for the diesel oil storage tanks in the river screen house and to correct some typographical errors on the list.
A pre-set meter will'bo used in the fill line from the diesel oil i       supply source when filling the stcrage tanks in the river screen hoase. This j       is in accordance with NFPA 30 section 2-4.4.8. Therefore, the deviation from NFPA 30 has been deleted. The pre -set meter will be procured as soon as practicable.             In the interie, if the tanke need to be refilled, an equipment attendant will he stationed at the tanks to monitor the filling operation.
A pre-set meter will'bo used in the fill line from the diesel oil i
supply source when filling the stcrage tanks in the river screen hoase. This j
is in accordance with NFPA 30 section 2-4.4.8.
Therefore, the deviation from NFPA 30 has been deleted. The pre -set meter will be procured as soon as practicable.
In the interie, if the tanke need to be refilled, an equipment attendant will he stationed at the tanks to monitor the filling operation.
Please direct any questions regarding this matter to this office.
Please direct any questions regarding this matter to this office.
Very truly yours,
Very truly yours,
[
[
K. A. Ainger Nuclear Licensing Administrator f
K. A. Ainger Nuclear Licensing Administrator f
        /kij Attachment ec:     Byron Resident Inspector Region III Office 2631K                                                                                                   ggh fA"!888R88a8433                                                                                           'h PDR
/kij Attachment ec:
Byron Resident Inspector Region III Office ggh 2631K fA"!888R88a8433
'h PDR


                                                                                                                                                                                            ,              a<~
a<~
Fire Zone                                                                       NFPA Reference               Recc.w.endation Resolution All water spray                                                                   15 - 1985           A suitable flushing connection   ,        System main drain tests are
Fire Zone NFPA Reference Recc.w.endation Resolution All water spray 15 - 1985 A suitable flushing connection System main drain tests are systems 2-13 should'be incorporated into performed which will flush the water' spray systems to piping up to system piping.
* systems                                                                                 2-13           should'be incorporated into
5 facilitate routine flushing.
* performed which will flush
,.The system can be pnuematically
                                                                                                              ,              the water' spray systems to               piping up to system piping.       -
~
5 facilitate routine flushing.         , .The system can be pnuematically
~
                                                                                                                                                                              ~
~ ~ ~ ~
                                                                                                                                                                                                                            ~
cleaned if determined necessary.
cleaned if determined necessary.         ~~~~
, ~
                                                                                                                                                , ~
E I
E   I       No further action required.
No further action required.
All automatic 15 - 1985           A gage connection should be               Hydraulic analysis verified water spray                                                                         4-9.25               provided at or near the                   the adequacy of the water systems.                                                     , ,
All automatic 15 - 1985 A gage connection should be Hydraulic analysis verified water spray 4-9.25 provided at or near the the adequacy of the water systems.
nozzle calculated as having               supply to meet the greatest the least pressure ynder                 hydraulic demand. A review normal flow conditions.                   of the individual water spray systems calculation against the design and water supply confirm
nozzle calculated as having supply to meet the greatest the least pressure ynder hydraulic demand. A review normal flow conditions.
                                              .                                                                                                                          the calculation with respect to the system design. A gage on this system is not considered necessary.
of the individual water spray systems calculation against the design and water supply confirm the calculation with respect to the system design. A gage on this system is not considered necessary.
No further action required.
No further action required.
s H
s H
e,
e,
                                                                                                                                                                                                                                  ~ '
~ '
s MFP/cle/8846b
s MFP/cle/8846b


Fire Zone         NFPA Reference             Recommendation                                                 '
Fire Zone NFPA Reference Recommendation Res olut i on
Res olut i on
.r 3.3A-2 12A - 1985 Only listed or approved equipment The Halon check valves are 3.38-2 2-7.4 and devices shall be used in the not specifically listed 3.3C-2 system. Halon check valves Model independently, however 3.3D-2 No. 1-061-733, Serial No. H-2964 provided as a component of this halon system design which was reviewed and found to have been designed, installed and tested in accordance with the recommendation of NFPA.
                                                                                                            .r 3.3A-2               12A - 1985   Only listed or approved equipment   The Halon check valves are 3.38-2                     2-7.4   and devices shall be used in the     not specifically listed 3.3C-2                             system. Halon check valves Model     independently, however 3.3D-2                             No. 1-061-733, Serial No. H-2964     provided as a component of this halon system design which was reviewed and found to have been designed, installed and tested in accordance with the recommendation of NFPA.
The preoperational test of these systems will verify operability of these valves.
The preoperational test of these systems will verify operability of these valves.
These valves are considered to be adequate. No further action required.
These valves are considered to be adequate. No further action required.
All automatic water     15 - 1985   The solenoid switch manufactured     The testing procedures confirms spray systems             2-1.2   by Automatic Switch Company and     component operability. This installed on the automatic water     is considered acceptable.
All automatic water 15 - 1985 The solenoid switch manufactured The testing procedures confirms spray systems 2-1.2 by Automatic Switch Company and component operability. This installed on the automatic water is considered acceptable.
spray systems should be U.L. listed.
spray systems should be U.L. listed.
11.7,-0, 11.7-1         15 - 1985   Individual strainers should be       Strainers are provided                     .
11.7,-0, 11.7-1 15 - 1985 Individual strainers should be Strainers are provided 11.7-2, 18.4-2 4-11.3 provided at each nozzle where upstream of the fire pumps.
11.7-2, 18.4-2         4-11.3       provided at each nozzle where       upstream of the fire pumps.
3.3A-2, 3.3A-1 water passage ways are smaller Also, flushing procedures
3.3A-2, 3.3A-1                     water passage ways are smaller       Also, flushing procedures
.than 1/8 inch, will eliminate any debris.
                                    .than 1/8 inch,                       will eliminate any debris.
:?
:?
MFP/cle/8846b
- MFP/cle/8846b i
                .}}
.}}

Latest revision as of 04:04, 4 December 2024

Forwards Revised Listing of NFPA Code Deviations to Delete Deviations from NFPA 30 Re Overflow Line for Diesel Oil Storage Tanks in River Screen House & to Correct Typos
ML20212Q574
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/21/1987
From: Ainger K
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
2631K, NUDOCS 8702020300
Download: ML20212Q574 (3)


Text

_

[

') Commonwealth Edloon

- One First National Plaza Chicago, Illinois

\\

l Address Reply to: Post Office Box 767

\\

Chicago, Illinois 60690 - 0767 January 21, 1987 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC.

20555 Subj ect: Byron Station Unit 2 Fire Protection NRC Docket No. 50-455

Reference:

(a) September 23, 1986 letter from K. A. Ainger to H. R. Denton

Dear Mr. Denton:

Reference (a) provided a listing of NFPA Code deviations for Byron Unit 2 which were not identified on the Byron Unit I list. Attached is a revised listing of NFPA Code deviations for Byron Unit 2.

This list has been revised to deletc a deviation from NFPA 30 regarding an overflow line for the diesel oil storage tanks in the river screen house and to correct some typographical errors on the list.

A pre-set meter will'bo used in the fill line from the diesel oil i

supply source when filling the stcrage tanks in the river screen hoase. This j

is in accordance with NFPA 30 section 2-4.4.8.

Therefore, the deviation from NFPA 30 has been deleted. The pre -set meter will be procured as soon as practicable.

In the interie, if the tanke need to be refilled, an equipment attendant will he stationed at the tanks to monitor the filling operation.

Please direct any questions regarding this matter to this office.

Very truly yours,

[

K. A. Ainger Nuclear Licensing Administrator f

/kij Attachment ec:

Byron Resident Inspector Region III Office ggh 2631K fA"!888R88a8433

'h PDR

a<~

Fire Zone NFPA Reference Recc.w.endation Resolution All water spray 15 - 1985 A suitable flushing connection System main drain tests are systems 2-13 should'be incorporated into performed which will flush the water' spray systems to piping up to system piping.

5 facilitate routine flushing.

,.The system can be pnuematically

~

~

~ ~ ~ ~

cleaned if determined necessary.

, ~

E I

No further action required.

All automatic 15 - 1985 A gage connection should be Hydraulic analysis verified water spray 4-9.25 provided at or near the the adequacy of the water systems.

nozzle calculated as having supply to meet the greatest the least pressure ynder hydraulic demand. A review normal flow conditions.

of the individual water spray systems calculation against the design and water supply confirm the calculation with respect to the system design. A gage on this system is not considered necessary.

No further action required.

s H

e,

~ '

s MFP/cle/8846b

Fire Zone NFPA Reference Recommendation Res olut i on

.r 3.3A-2 12A - 1985 Only listed or approved equipment The Halon check valves are 3.38-2 2-7.4 and devices shall be used in the not specifically listed 3.3C-2 system. Halon check valves Model independently, however 3.3D-2 No. 1-061-733, Serial No. H-2964 provided as a component of this halon system design which was reviewed and found to have been designed, installed and tested in accordance with the recommendation of NFPA.

The preoperational test of these systems will verify operability of these valves.

These valves are considered to be adequate. No further action required.

All automatic water 15 - 1985 The solenoid switch manufactured The testing procedures confirms spray systems 2-1.2 by Automatic Switch Company and component operability. This installed on the automatic water is considered acceptable.

spray systems should be U.L. listed.

11.7,-0, 11.7-1 15 - 1985 Individual strainers should be Strainers are provided 11.7-2, 18.4-2 4-11.3 provided at each nozzle where upstream of the fire pumps.

3.3A-2, 3.3A-1 water passage ways are smaller Also, flushing procedures

.than 1/8 inch, will eliminate any debris.

?

- MFP/cle/8846b i

.