ML20236M739: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ -
{{#Wiki_filter:_ _ _ _. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ -
Gimmonw calth Idison O)mpany liraidwood Generating Station
Gimmonw calth Idison O)mpany liraidwood Generating Station Route a1. Ilox R1 tiracculle. IL 60107%19 Tel 815-4 SR2Hol July 8,1998 United States Nuclear Regulatory Co.mmission Attn: Document Control Desk Washington D.C. 20555 - 0001
      .        Route a1. Ilox R1
  ,            tiracculle. IL 60107%19 Tel 815-4 SR2Hol July 8,1998 United States Nuclear Regulatory Co.mmission Attn: Document Control Desk Washington D.C. 20555 - 0001


==Subject:==
==Subject:==
Line 26: Line 24:
==References:==
==References:==
G. Stanley and K. Graesser (Commonwealth Edison) letter to USNRC,
G. Stanley and K. Graesser (Commonwealth Edison) letter to USNRC,
                              " Conversion to the Improved Standard Technical Specifications," dated December 13,1996 Commonwealth Edison (Comed) is providing the attached list of the generic Technical Specification Task Force (TSTF) changes which have not been approved by the NRC and are incorporated into the Byron and Braidwood ITS submittal currently under NRC review. To assist in expediting the process, and to support the November SER, Comed has prioritized the subject TSTFs based on our perceived importance. Those TSTFs annotated as having a "hi" priority, are believed to be critical to the implementation of ITS in addition to providing operational enhancement. Those TSTFs annotated as " low" also provide enhancement, however, not as critical.
" Conversion to the Improved Standard Technical Specifications," dated December 13,1996 Commonwealth Edison (Comed) is providing the attached list of the generic Technical Specification Task Force (TSTF) changes which have not been approved by the NRC and are incorporated into the Byron and Braidwood ITS submittal currently under NRC review. To assist in expediting the process, and to support the November SER, Comed has prioritized the subject TSTFs based on our perceived importance. Those TSTFs annotated as having a "hi" priority, are believed to be critical to the implementation of ITS in addition to providing operational enhancement. Those TSTFs annotated as " low" also provide enhancement, however, not as critical.
Comed is ready to discuss or assist the NRC in resolving any issues involving these TSTFs at the NRCs earliest convenience.
Comed is ready to discuss or assist the NRC in resolving any issues involving these TSTFs at the NRCs earliest convenience.
i                                                                                                                                                                             \
i
f tw
\\
                                                                                                                                                                          /k O 9907140241 990708 l
/k O f
fA                                    .
tw 9907140241 990708 fA l
l             A Unicom Gimpany
l A Unicom Gimpany
(
(


Document Control Desk -
Document Control Desk -
                                                      . Jdly 8,1998 Page 2 Please address any comments or questions regarding this matter to our Nuclear Licensing
. Jdly 8,1998 Page 2 Please address any comments or questions regarding this matter to our Nuclear Licensing
: Department.
: Department.
Sincerely, ;
Sincerely, ;
v#                         -
v#
1 a
1 a
Timothy J. Tulon                                                                                                                       1
Timothy J. Tulon 1
                                                        . Site Vice President Braidwood Nuclear Generating Station
. Site Vice President Braidwood Nuclear Generating Station


==Attachment:==
==Attachment:==
Pending TSTF Priority cc:                                                         Regional Administrator-RIII Senior Resident inspector - Braidwood
Pending TSTF Priority cc:
: Senior Resident Inspector- Byron Office of Nuclear Facility Safety -IDNS mc/9804ifjt doc l
Regional Administrator-RIII Senior Resident inspector - Braidwood
: Senior Resident Inspector-Byron Office of Nuclear Facility Safety -IDNS mc/9804ifjt doc


          , ,                                                  Attachment Byron / Braidwood Pending TSTF Priority (Improved Technical Specification Submittal) 1 i
Attachment Byron / Braidwood Pending TSTF Priority (Improved Technical Specification Submittal) 1 i
l l
l i
i j
j l
l


i
i
  ,em,                                           ATTACHMENT BYRON / BRAIDWOOD PENDING TSTF PRIORITY (IMPROVED TECHNICAL SPECIFICATION SUBMITTAL)
,em, ATTACHMENT BYRON / BRAIDWOOD PENDING TSTF PRIORITY (IMPROVED TECHNICAL SPECIFICATION SUBMITTAL)
TSTF                     RAI Number               Comed Priority TSTF-2                   3.8.3-01                 low                                                                                       j TSTF-21                   3.9-02 Item 2             hi TSTF-111                 ITS B 3.3.1 and           hi ITS B 3.3.2 TSTF-204                 3.8.5-01                 hi TSTF 205                 1.0-05                   hi TSTF-234                 3.1.7-01                 low i
TSTF RAI Number Comed Priority TSTF-2 3.8.3-01 low j
TSTF-235                 3.7.1-01                 low TSTF-241                 3.2.4-01                 h1                                                                                         I 3.2.4-02 TSTF-258                 5.0-01                   hi                                                                                         i
TSTF-21 3.9-02 Item 2 hi TSTF-111 ITS B 3.3.1 and hi ITS B 3.3.2 TSTF-204 3.8.5-01 hi TSTF 205 1.0-05 hi TSTF-234 3.1.7-01 low i
(_)\
TSTF-235 3.7.1-01 low TSTF-241 3.2.4-01 h1 3.2.4-02 TSTF-258 5.0-01 hi
(_.         TSTF-263                 3.4.6-01                 hi 3.4.7-01 3.4.7-07 3.4.8-01                                                                                                             i 3.4.8-08 TSTF-266                 ITS LCO 3.3.4             low TSTF-268                 3.7.5-01                 hi TSTF-270                 1.0-06                   hi TSTF-280                 3.4-01 Item 32           hi TSTF-281                 3.7.2-01                 hi v
(_)\\
I L       --              ---  - -                        -                    - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - _ - - -
(_.
TSTF-263 3.4.6-01 hi 3.4.7-01 3.4.7-07 3.4.8-01 3.4.8-08 TSTF-266 ITS LCO 3.3.4 low TSTF-268 3.7.5-01 hi TSTF-270 1.0-06 hi TSTF-280 3.4-01 Item 32 hi TSTF-281 3.7.2-01 hi v
I L


I I
I I
; (~'T                 WOG ,                             .                                              RAI Number                 Priority
; (~'T WOG,
- 5       a
RAI Number Priority
    ~- j' TSTF-282                                                                           3.4-01 Items 25 & 31       low BYS 5.0 TSTF-283                                                                           BYS 12.0                   hi TSTF-288                                                                           3.4-01 Item 21             low TSTF-289                                                                           3.7.2-03                   low WOG-117                                                                           3.2.1-02                   hi i
- 5 a
i i
~- j' TSTF-282 3.4-01 Items 25 & 31 low BYS 5.0 TSTF-283 BYS 12.0 hi TSTF-288 3.4-01 Item 21 low TSTF-289 3.7.2-03 low WOG-117 3.2.1-02 hi i
I l
i I
  ,c 8 i
,c 8 i
    % ,Y l
%,Y l
l
\\
                                                                                                                                                              \
l l
l l
  +     1
+
  \     l x._/
1
\\
l x._/
l
l
[}}
[}}

Latest revision as of 00:54, 3 December 2024

Forwards List of Generic TS Task Force Changes Which Have Not Been Approved by NRC & Are Incorporated Into Byron & Braidwood Improved Tech Spec Submittal Currently Under NRC Review
ML20236M739
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/08/1998
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9807140241
Download: ML20236M739 (5)


Text

_ _ _ _. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ -

Gimmonw calth Idison O)mpany liraidwood Generating Station Route a1. Ilox R1 tiracculle. IL 60107%19 Tel 815-4 SR2Hol July 8,1998 United States Nuclear Regulatory Co.mmission Attn: Document Control Desk Washington D.C. 20555 - 0001

Subject:

Improved Technical Specifications (ITS) Submittal, Generic Change Priority Byron Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-37 and NPF-66 NRC Docket Numbers: 50-454 and 50-455 Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Numbers: 50-456 and 50-457

References:

G. Stanley and K. Graesser (Commonwealth Edison) letter to USNRC,

" Conversion to the Improved Standard Technical Specifications," dated December 13,1996 Commonwealth Edison (Comed) is providing the attached list of the generic Technical Specification Task Force (TSTF) changes which have not been approved by the NRC and are incorporated into the Byron and Braidwood ITS submittal currently under NRC review. To assist in expediting the process, and to support the November SER, Comed has prioritized the subject TSTFs based on our perceived importance. Those TSTFs annotated as having a "hi" priority, are believed to be critical to the implementation of ITS in addition to providing operational enhancement. Those TSTFs annotated as " low" also provide enhancement, however, not as critical.

Comed is ready to discuss or assist the NRC in resolving any issues involving these TSTFs at the NRCs earliest convenience.

i

\\

/k O f

tw 9907140241 990708 fA l

l A Unicom Gimpany

(

Document Control Desk -

. Jdly 8,1998 Page 2 Please address any comments or questions regarding this matter to our Nuclear Licensing

Department.

Sincerely, ;

v#

1 a

Timothy J. Tulon 1

. Site Vice President Braidwood Nuclear Generating Station

Attachment:

Pending TSTF Priority cc:

Regional Administrator-RIII Senior Resident inspector - Braidwood

Senior Resident Inspector-Byron Office of Nuclear Facility Safety -IDNS mc/9804ifjt doc

Attachment Byron / Braidwood Pending TSTF Priority (Improved Technical Specification Submittal) 1 i

l i

j l

i

,em, ATTACHMENT BYRON / BRAIDWOOD PENDING TSTF PRIORITY (IMPROVED TECHNICAL SPECIFICATION SUBMITTAL)

TSTF RAI Number Comed Priority TSTF-2 3.8.3-01 low j

TSTF-21 3.9-02 Item 2 hi TSTF-111 ITS B 3.3.1 and hi ITS B 3.3.2 TSTF-204 3.8.5-01 hi TSTF 205 1.0-05 hi TSTF-234 3.1.7-01 low i

TSTF-235 3.7.1-01 low TSTF-241 3.2.4-01 h1 3.2.4-02 TSTF-258 5.0-01 hi

(_)\\

(_.

TSTF-263 3.4.6-01 hi 3.4.7-01 3.4.7-07 3.4.8-01 3.4.8-08 TSTF-266 ITS LCO 3.3.4 low TSTF-268 3.7.5-01 hi TSTF-270 1.0-06 hi TSTF-280 3.4-01 Item 32 hi TSTF-281 3.7.2-01 hi v

I L

I I

(~'T WOG,

RAI Number Priority

- 5 a

~- j' TSTF-282 3.4-01 Items 25 & 31 low BYS 5.0 TSTF-283 BYS 12.0 hi TSTF-288 3.4-01 Item 21 low TSTF-289 3.7.2-03 low WOG-117 3.2.1-02 hi i

i I

,c 8 i

%,Y l

\\

l l

+

1

\\

l x._/

l

[