ML20237K038: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Q Ll H f ,i l Ll Q | {{#Wiki_filter:Q Ll H f,i l Ll Q POk a | ||
Communications | Communications | ||
[*iff Report I!!!!l111111lllllll. | |||
CES | il company: | ||
O com'ereece aePori TV Electric | CES h | ||
Item 4. S W E C N A-1140 Report | T'''' | ||
O com'ereece aePori TV Electric 84056 CPSES IAP Phase 4 cate-5/14/87 Subject | |||
: Time, Inspection Requirements for Pipe Supports 1:55 p.m. | |||
Item 4. S W E C N A-1140 Report Bannockburn IL Participants-of R. Klause W. Evans, R. Read, D. Boe SWEC J. H uffett TU Electric S. Tum minelli, N. Willia ms Cygna Required item Comments Action By | |||
) | ) | ||
After discussing the matter further, S W E C has concluded that the inspection requirement is not a safety concern. Since it is not required per ASM E, the inspection will not be performed. S W E C will revise the N A-1140 report actordingi 8709040167 070514 PDR | After discussing the matter further, S W E C has concluded that the inspection requirement is not a safety concern. Since it is not required per ASM E, the inspection will not be performed. S W E C will revise the N A-1140 report actordingi 8709040167 070514 PDR ADOCK 05000445 O | ||
PDR Signed Page of A | |||
A See Attached Distribution Sheet. | |||
Distnbution m | Distnbution m | ||
l i | l i | ||
DISTRIBUTION LIST | DISTRIBUTION LIST l | ||
i Mr. | |||
Mr. J. Redding | J. Redding | ||
{ | { | ||
Mr. L. Nace | Mr. | ||
Mr. W. Counsil | L. Nace Mr. W. Counsil l | ||
Ms. A. Vietti-Cook | Mr. | ||
Mr. E. Siskin | J. Muffett Mr. | ||
Mr. B. Ramsey | D. | ||
l | Pigott Ms. A. Vietti-Cook l | ||
1 | Mr2LCF.' Grimes.u, Mr. E. | ||
Siskin Mr. | |||
B. | |||
Ramsey l | |||
Ms. | |||
N. Williams 1 | |||
Mr. C. Wong Mr. | |||
R. Pascaretta Project File l | |||
l 5 | |||
l 1 | |||
l l | l l | ||
l I | |||
i 1 | |||
I i | I i | ||
1 I | 1 I | ||
t I | |||
I | i l | ||
I l | |||
l | l 1 | ||
l | J}} | ||
Latest revision as of 07:00, 2 December 2024
| ML20237K038 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/14/1987 |
| From: | Williams N CYGNA ENERGY SERVICES |
| To: | |
| References | |
| CON-84056 NUDOCS 8709040167 | |
| Download: ML20237K038 (2) | |
Text
Q Ll H f,i l Ll Q POk a
Communications
[*iff Report I!!!!l111111lllllll.
il company:
CES h
T'
O com'ereece aePori TV Electric 84056 CPSES IAP Phase 4 cate-5/14/87 Subject
- Time, Inspection Requirements for Pipe Supports 1:55 p.m.
Item 4. S W E C N A-1140 Report Bannockburn IL Participants-of R. Klause W. Evans, R. Read, D. Boe SWEC J. H uffett TU Electric S. Tum minelli, N. Willia ms Cygna Required item Comments Action By
)
After discussing the matter further, S W E C has concluded that the inspection requirement is not a safety concern. Since it is not required per ASM E, the inspection will not be performed. S W E C will revise the N A-1140 report actordingi 8709040167 070514 PDR ADOCK 05000445 O
PDR Signed Page of A
A See Attached Distribution Sheet.
Distnbution m
l i
DISTRIBUTION LIST l
i Mr.
J. Redding
{
Mr.
L. Nace Mr. W. Counsil l
Mr.
J. Muffett Mr.
D.
Pigott Ms. A. Vietti-Cook l
Mr2LCF.' Grimes.u, Mr. E.
Siskin Mr.
B.
Ramsey l
Ms.
N. Williams 1
Mr. C. Wong Mr.
R. Pascaretta Project File l
l 5
l 1
l l
l I
i 1
I i
1 I
t I
i l
I l
l 1
J