ML20238A032: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ . . _ _ _ _     ___
{{#Wiki_filter:_ _ _ _ _.. _ _ _ _
                                                                                                          $([ ? ?l.
$([ ? ?l.
Towa Electric Light and Power Company August 25, 1987 DAEC-87-0872 Mr. A. Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois           60137
Towa Electric Light and Power Company August 25, 1987 DAEC-87-0872 Mr. A. Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137


==Subject:==
==Subject:==
Line 25: Line 25:


==Dear Mr. Davis:==
==Dear Mr. Davis:==
 
Please find enclosed a copy of the Semi-Annual Report for the Duane Arnold Energy Center, Unit No. 1, for the period January 1, 1987, through June 30, 1987.
Please find enclosed a copy of the Semi-Annual Report for the Duane Arnold Energy Center, Unit No. 1, for the period January 1, 1987, through June 30, 1987. This report satisfies as the requirements for the Semi-Annual Effluent Release Report, stated in the Radiological Technical Specifications, (Appendix A to the Operating License DPR-49).
This report satisfies the requirements for the Semi-Annual Effluent Release Report, as stated in the Radiological Technical Specifications, (Appendix A to the Operating License DPR-49).
ncerel Rick     -  Hannon Plant Superintendent RLH/RL/hc
ncerel Rick Hannon Plant Superintendent RLH/RL/hc


==Enclosure:==
==Enclosure:==
Semi-Annual Effluent Release Report (203 pages) cc:  Director of Inspection and Enforcement (w/ attachment)
Semi-Annual Effluent Release Report (203 pages)
U.S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D. C.           20555                                                                           l I
Director of Inspection and Enforcement (w/ attachment) cc:
NRC Resident Inspector (w/ attachment)
U.S. Nuclear Regulatory Commission Attn:
A. Cappucci, NRC Project Manager File:   A-118e, NRC-7a 8708280278 870825 7s
Document Control Desk Washington, D.
                                                                                                                    /
C.
g I
20555 l
PDR   ADOCK 05000331 R                 PDR Duane Arnold Energv Center
I NRC Resident Inspector (w/ attachment)
A. Cappucci, NRC Project Manager File:
A-118e, NRC-7a 7s V
8708280278 870825 I
/
g PDR ADOCK 05000331 R
PDR Duane Arnold Energv Center
* 3277 DAEC lload
* 3277 DAEC lload
* l'ala, Iowa 52324 31 gigs 2 7s21
* l'ala, Iowa 52324 31 gigs 2 7s21


l I
l i
i 1
1 J
l l
1
J 1
)
                              )
l l
l 3
l 3
9 e9s g
9 9s e
w;r.
g s
s
w
                          -3 6-            -
. 6-
    @                    1
;r.
      '6
-3
            $f.G   #    -
$f.
1
'6 G
1 s
1 s
v         e}}
v e}}

Latest revision as of 06:11, 2 December 2024

Forwards Radioactive Effluent Releases Semiannual Rept for Jan-June 1987, Per Radiological Tech Specs
ML20238A032
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/25/1987
From: Hannen R
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML112230286 List:
References
DAEC-87-0872, DAEC-87-872, NUDOCS 8708280278
Download: ML20238A032 (2)


Text

_ _ _ _ _.. _ _ _ _

$([ ? ?l.

Towa Electric Light and Power Company August 25, 1987 DAEC-87-0872 Mr. A. Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Semi-Annval Effluent Release Report January 1, 1987, through June 30, 1987, for the Duane Arnold Energy Center, Unit No. 1

Dear Mr. Davis:

Please find enclosed a copy of the Semi-Annual Report for the Duane Arnold Energy Center, Unit No. 1, for the period January 1, 1987, through June 30, 1987.

This report satisfies the requirements for the Semi-Annual Effluent Release Report, as stated in the Radiological Technical Specifications, (Appendix A to the Operating License DPR-49).

ncerel Rick Hannon Plant Superintendent RLH/RL/hc

Enclosure:

Semi-Annual Effluent Release Report (203 pages)

Director of Inspection and Enforcement (w/ attachment) cc:

U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 l

I NRC Resident Inspector (w/ attachment)

A. Cappucci, NRC Project Manager File:

A-118e, NRC-7a 7s V

8708280278 870825 I

/

g PDR ADOCK 05000331 R

PDR Duane Arnold Energv Center

  • l'ala, Iowa 52324 31 gigs 2 7s21

l i

1 J

1

)

l 3

9 9s e

g s

w

. 6-

r.

-3

$f.

1

'6 G

1 s

v e