ML20245C317: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ | {{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ | ||
. tr. | |||
( | ( | ||
\ | l i | ||
\\ | |||
I | I | ||
,( | |||
4 r UNITED STATES NUCLEAR REGULATORY CCMMISSION | |||
DUOVESNE LIGHT COMPANY OHIO EDISON COMPANY | /l 00CXET NO. 50-334 4 | ||
PENNSYLVANIA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE I | i DUOVESNE LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE I | ||
The U. S. Nuclear Regulatory Commission (the Comission) has issued Amendment No. 9 | The U. S. Nuclear Regulatory Commission (the Comission) has issued Amendment No. 9 to Facility Operating License No. OPR-66, issued to Duquesne Li@t Company Ohio Edison Company, and Pennsylvania Power Company | ||
~ | |||
Duquesne Li@t Company Ohio Edison Company, and Pennsylvania Power Company | i (the licensees), for operation of the Beaver Valley Power Station Unit No. | ||
1 (the facility) located in Beaver County, Pennsylvania. The amendment is effective as of its date of issuance. | 1 (the facility) located in Beaver County, Pennsylvania. The amendment is effective as of its date of issuance. | ||
The amendment incorporates into the Technical Specificr, ions changes resulting from a reanalysis of ECCS performance with the following assumptions: | The amendment incorporates into the Technical Specificr, ions changes resulting from a reanalysis of ECCS performance with the following assumptions: | ||
(1) upper head fluid temperature equal to hot leg tempera-tures; (2) one percent steam generator tube plugging; and (3) the rod bow linear power penalty removed for burnups less than 24,000 MWD /HTU. | |||
Monitoring System for in-core monitoring of axial power. | Changes to the Technical Specifications include raising the total nuclear peaking factor to 2.32 and a deletion of the use of the Axial Power Distribution i | ||
also terminates the Commission's Order for Modification of License dated August 27, 1976. | Monitoring System for in-core monitoring of axial power. | ||
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. | This amendment l | ||
l also terminates the Commission's Order for Modification of License dated August 27, 1976. | |||
I I | |||
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. | |||
The Comission has made appropriate 9710260071 770712 PDR ADOCK 05000344 P | |||
PDR | |||
3 | 3 | ||
( | ( | ||
( | |||
i i | |||
findings as required by the Act and the Comission's rules and regulations l | |||
\\ | |||
l l | l l | ||
in 10 CFR Chapter I, which are set forth in the license amendment. prior | in 10 CFR Chapter I, which are set forth in the license amendment. prior i | ||
public notice of this amendment was not required since the amendment does | |||
The Comission has detennined that the issuance of this amendment | ) | ||
not involve a significant hazards consideration. | |||
The Comission has detennined that the issuance of this amendment | |||
} | |||
t will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in | t will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in | ||
~ | |||
connection with issuance of this amendment. | connection with issuance of this amendment. | ||
For further details with respect to this action, see (1) the | For further details with respect to this action, see (1) the | ||
application for amendment dated February 11,1977,(2) knendment No. 9 | ] | ||
f A copy of items (2) and (3) tr.ay be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C. | application for amendment dated February 11,1977,(2) knendment No. 9 j | ||
to License No. OpR-66, and (3) the Commission's related Safety Evaluation. | |||
f All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N.W., Washington, D. C. and at the Beaver Area Memorial Library,100 College Avenue, Beaver, Pennsylvania. | |||
f A copy of items (2) and (3) tr.ay be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C. | |||
: 20555, Attention: | |||
Director, Division of Operating Reactors. | |||
Dated at Bethesda, Maryland,12th day of July 1977. | Dated at Bethesda, Maryland,12th day of July 1977. | ||
FOR THE NUCLEAR REGULATORY COMMISSION gh/ | FOR THE NUCLEAR REGULATORY COMMISSION gh/ | ||
rpf. | |||
t Robert W. Reid, Chief Operating Reactors Branch !? | |||
Division of Operating Reactors | Division of Operating Reactors | ||
_}} | |||
Latest revision as of 03:12, 2 December 2024
| ML20245C317 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 07/12/1977 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20245C312 | List: |
| References | |
| TAC-6811, NUDOCS 8710260071 | |
| Download: ML20245C317 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _
. tr.
(
l i
\\
I
,(
4 r UNITED STATES NUCLEAR REGULATORY CCMMISSION
/l 00CXET NO. 50-334 4
i DUOVESNE LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE I
The U. S. Nuclear Regulatory Commission (the Comission) has issued Amendment No. 9 to Facility Operating License No. OPR-66, issued to Duquesne Li@t Company Ohio Edison Company, and Pennsylvania Power Company
~
i (the licensees), for operation of the Beaver Valley Power Station Unit No.
1 (the facility) located in Beaver County, Pennsylvania. The amendment is effective as of its date of issuance.
The amendment incorporates into the Technical Specificr, ions changes resulting from a reanalysis of ECCS performance with the following assumptions:
(1) upper head fluid temperature equal to hot leg tempera-tures; (2) one percent steam generator tube plugging; and (3) the rod bow linear power penalty removed for burnups less than 24,000 MWD /HTU.
Changes to the Technical Specifications include raising the total nuclear peaking factor to 2.32 and a deletion of the use of the Axial Power Distribution i
Monitoring System for in-core monitoring of axial power.
This amendment l
l also terminates the Commission's Order for Modification of License dated August 27, 1976.
I I
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations.
The Comission has made appropriate 9710260071 770712 PDR ADOCK 05000344 P
3
(
(
i i
findings as required by the Act and the Comission's rules and regulations l
\\
l l
in 10 CFR Chapter I, which are set forth in the license amendment. prior i
public notice of this amendment was not required since the amendment does
)
not involve a significant hazards consideration.
The Comission has detennined that the issuance of this amendment
}
t will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in
~
connection with issuance of this amendment.
For further details with respect to this action, see (1) the
]
application for amendment dated February 11,1977,(2) knendment No. 9 j
to License No. OpR-66, and (3) the Commission's related Safety Evaluation.
f All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N.W., Washington, D. C. and at the Beaver Area Memorial Library,100 College Avenue, Beaver, Pennsylvania.
f A copy of items (2) and (3) tr.ay be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.
- 20555, Attention:
Director, Division of Operating Reactors.
Dated at Bethesda, Maryland,12th day of July 1977.
FOR THE NUCLEAR REGULATORY COMMISSION gh/
rpf.
t Robert W. Reid, Chief Operating Reactors Branch !?
Division of Operating Reactors
_