ML20249A410: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:__ | {{#Wiki_filter:__ | ||
l t | l t | ||
W ' ~_ LE= | l 1 | ||
W ' ~_ LE= | |||
Davis-Besse Nuclear Power Station i | |||
gn 5501 North State Route 2 l | |||
m Oak Harbor Ohio 43449-9760 l | |||
June 12,1998 CCN: P-6-98-05 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen: | June 12,1998 CCN: P-6-98-05 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen: | ||
Monthly Operating Report, May 1998 Davis-Besse Nuclear Power Station Unit 1 | Monthly Operating Report, May 1998 Davis-Besse Nuclear Power Station Unit 1 l | ||
Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of May 1998. | |||
If you have any questions, please contact E, C. Matranga at (419) 321-8369. | Also attached is Revision 1 to the April 1998 Monthly Operating Report. The April report was revised l | ||
Very truly yours, O | to correct items 3 and 4 of the Operating Data Report (Number ofliours the Reactor Was Critical and i | ||
ames H. Lash | Number ofIlours the Generator Was On Line). | ||
If you have any questions, please contact E, C. Matranga at (419) 321-8369. | |||
l cc: | l I | ||
A. G. llansen | Very truly yours, O | ||
/ | |||
/ | |||
ames H. Lash l | |||
R | g) | ||
Plant Manager M-Davis-Besse Nuclear Power Station ECM/ljk Enclosure l | |||
l cc: | |||
A. B. Beach 1 | |||
l NRC Region 111 Administrator l | |||
l A. G. llansen | |||
) | |||
NRC Project Manager | |||
,s]3 S. J. Campbell i | |||
- NRC Senior Resident inspector 9906160413 990612 PDR ADOCK 05000346: | |||
R PH l | |||
. _ - _ _ _}} | |||
Latest revision as of 14:16, 30 November 2024
| ML20249A410 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/12/1998 |
| From: | Lash J CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20249A411 | List: |
| References | |
| CCN:P-6-98-05, CCN:P-6-98-5, NUDOCS 9806160413 | |
| Download: ML20249A410 (1) | |
Text
__
l t
l 1
W ' ~_ LE=
Davis-Besse Nuclear Power Station i
gn 5501 North State Route 2 l
m Oak Harbor Ohio 43449-9760 l
June 12,1998 CCN: P-6-98-05 Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ladies and Gentlemen:
Monthly Operating Report, May 1998 Davis-Besse Nuclear Power Station Unit 1 l
Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of May 1998.
Also attached is Revision 1 to the April 1998 Monthly Operating Report. The April report was revised l
to correct items 3 and 4 of the Operating Data Report (Number ofliours the Reactor Was Critical and i
Number ofIlours the Generator Was On Line).
If you have any questions, please contact E, C. Matranga at (419) 321-8369.
l I
Very truly yours, O
/
/
ames H. Lash l
g)
Plant Manager M-Davis-Besse Nuclear Power Station ECM/ljk Enclosure l
l cc:
A. B. Beach 1
l NRC Region 111 Administrator l
l A. G. llansen
)
NRC Project Manager
,s]3 S. J. Campbell i
- NRC Senior Resident inspector 9906160413 990612 PDR ADOCK 05000346:
R PH l
. _ - _ _ _