#REDIRECT [[M210053, GE Hitachi Nuclear Energy - Requesting to Extend Request for Additional Information Response Due Date to July 28, 2021]]
{{Adams
| number = ML21110A095
| issue date = 04/19/2021
| title = GE Hitachi Nuclear Energy - Requesting to Extend Request for Additional Information Response Due Date to July 28, 2021
| author name = Feyrer M
| author affiliation = GE Hitachi Nuclear Energy
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000018
| license number = DPR-001
| contact person =
| case reference number = M210053
| document type = Letter
| page count = 1
| project =
| stage = Request
}}
 
=Text=
{{#Wiki_filter:RR3
)
GEHitachi Nuclear Energy x;ny MattJ.
Feyrer Site
: Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053
: Sunol, CA94586 USA April 19,2021 T9259186018 U.S.Nuclear Regulatory Commission Matt.feyrer@ge.com Attn:
Document Control Desk Washington, D.C.20555-001
 
==Subject:==
GEHRequest to Extend Request forAdditional Information (RAI)
 
===Response===
DueDateto July 28,2021
 
==References:==
1)NRCLicense DPR-1, Docket 50-18 2)Letter GEHVallecitos Nuclear Center (VNC)
Request forAlternate Decommissioning Schedules for DPR-1, DR-10, andTR-1Licenses, 7/10/2015 3)Letter, J.D.Parrot (NRC) to M.F. Feyrer,GEHitachi Request forAlternate Decommissioning Schedule for VBWR atVNC
- Request forAdditional Information, (EPID L-2017-LLA-0052),
7/15/2020 4)Letter, M.F.Feyrer Requestingto Extend RequestforAdditional information Due DatetoApril 28,2021,8/14/2020 5)MSTEAMSmeeting between GEHand NRC presenting supplemental information regarding thestatus ofVBWRsamplingand
: analysis, 3/18/2021 6)Letter, M.F.Feyrer Supplemental Information for Request forAdditional information
 
===Response===
dueApril 28,2021,3/22/2021 GEHitachi Nuclear
: Energy, LLC(GEH) isrequesting toextend theresponse duedatefortheNRC's request foradditional information (RAI) related tothealternate decommissioning schedule fortheVBWR.
Theinitial request foranalternate decommissioning schedule wasmade7/10/2015 (Ref 2)andproposed aVBWRdecommissioning dateofApril 2041tofacilitate asingle holistic decommissioning oftheentire VNCsite.
inletter (Ref 3)dated 7/15/2020, theNRCrequested GEHprovide additional information related tothe structural integrity oftheVBWRtoenable anindependent assessment todetermine if the requested exemption to10CFR50.82(a)(3) wouldpresent anunduerisk topublic health andsafetyunder @
50.12(a).
Uponreviewing thenineRAlsinthat
: letter, GEHrequested (Ref 4)andwasauthorized until 4/28/2021 torespond toallow timeforextensive concrete structure coresampling,
: analysis, and evaluation.
GEHupdated theNRConthestatus ofthat effort andprovided adetailed planon3/18/2021 (Ref 4&5).
Sampling wascompleted on4/8/2021 Aresponse duedateof7/28/2021 isbeing requested inthis communication toallow timetoanalyze andevaluate thesampleresults andtocompose afinal response totheRAls.
Ifyouhaveanyquestions regarding this
: matter, please contact meat(925) 918-6018.
Sincerely,
, /
g p4-
~-
/M V
(/
MattFeyrer, Site Manager Vallecitos Nuclear Center cc:NRCRegion IVAdministrator S.Anderson, NRCRIV J.D.Parrott, NMSS/DUWP/RDB MJF21-006}}

Latest revision as of 09:41, 29 November 2024

GE Hitachi Nuclear Energy - Requesting to Extend Request for Additional Information Response Due Date to July 28, 2021
ML21110A095
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 04/19/2021
From: Feyrer M
GE Hitachi Nuclear Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
M210053
Download: ML21110A095 (1)


Text

RR3

)

GEHitachi Nuclear Energy x;ny MattJ.

Feyrer Site

Manager, Vallecitos Nuclear Center 6705Vallecitos Rd M210053
Sunol, CA94586 USA April 19,2021 T9259186018 U.S.Nuclear Regulatory Commission Matt.feyrer@ge.com Attn:

Document Control Desk Washington, D.C.20555-001

Subject:

GEHRequest to Extend Request forAdditional Information (RAI)

Response

DueDateto July 28,2021

References:

1)NRCLicense DPR-1, Docket 50-18 2)Letter GEHVallecitos Nuclear Center (VNC)

Request forAlternate Decommissioning Schedules for DPR-1, DR-10, andTR-1Licenses, 7/10/2015 3)Letter, J.D.Parrot (NRC) to M.F. Feyrer,GEHitachi Request forAlternate Decommissioning Schedule for VBWR atVNC

- Request forAdditional Information, (EPID L-2017-LLA-0052),

7/15/2020 4)Letter, M.F.Feyrer Requestingto Extend RequestforAdditional information Due DatetoApril 28,2021,8/14/2020 5)MSTEAMSmeeting between GEHand NRC presenting supplemental information regarding thestatus ofVBWRsamplingand

analysis, 3/18/2021 6)Letter, M.F.Feyrer Supplemental Information for Request forAdditional information

Response

dueApril 28,2021,3/22/2021 GEHitachi Nuclear

Energy, LLC(GEH) isrequesting toextend theresponse duedatefortheNRC's request foradditional information (RAI) related tothealternate decommissioning schedule fortheVBWR.

Theinitial request foranalternate decommissioning schedule wasmade7/10/2015 (Ref 2)andproposed aVBWRdecommissioning dateofApril 2041tofacilitate asingle holistic decommissioning oftheentire VNCsite.

inletter (Ref 3)dated 7/15/2020, theNRCrequested GEHprovide additional information related tothe structural integrity oftheVBWRtoenable anindependent assessment todetermine if the requested exemption to10CFR50.82(a)(3) wouldpresent anunduerisk topublic health andsafetyunder @

50.12(a).

Uponreviewing thenineRAlsinthat

letter, GEHrequested (Ref 4)andwasauthorized until 4/28/2021 torespond toallow timeforextensive concrete structure coresampling,
analysis, and evaluation.

GEHupdated theNRConthestatus ofthat effort andprovided adetailed planon3/18/2021 (Ref 4&5).

Sampling wascompleted on4/8/2021 Aresponse duedateof7/28/2021 isbeing requested inthis communication toallow timetoanalyze andevaluate thesampleresults andtocompose afinal response totheRAls.

Ifyouhaveanyquestions regarding this

matter, please contact meat(925) 918-6018.

Sincerely,

, /

g p4-

~-

/M V

(/

MattFeyrer, Site Manager Vallecitos Nuclear Center cc:NRCRegion IVAdministrator S.Anderson, NRCRIV J.D.Parrott, NMSS/DUWP/RDB MJF21-006