{{#Wiki_filter:Industry Perspective on NRC Oversight of PRA Configuration Control NRC Public Meeting March 30, 2023
{{#Wiki_filter:©2023 Nuclear Energy Institute Industry Perspective on NRC Oversight of PRA Configuration Control NRC Public Meeting March 30, 2023


©2023 Nuclear Energy Institute Overview
©2023 Nuclear Energy Institute 2 Overview Guiding principles for effort Industry lessons learned from tabletop evaluations Future and ongoing industry actions Continuing points for future evaluation


Guiding principles for effort
©2023 Nuclear Energy Institute 3 Guiding Principles for PRA Configuration Control Tabletop Inspection Effort Build on previous reviews (licensing reviews, peer reviews)
Consistent with existing regulations, regulatory guides, and license conditions Industry and NRC resource allocation appropriate for relative safety impact


Industry lessons learned from tabletop evaluations
©2023 Nuclear Energy Institute 4 Overarching theme: clarity and documentation are vital Use and definition of various models  
 
Future and ongoing industry actions
 
Continuing points for future evaluation
 
©2023 Nuclear Energy Institute 2 Guiding Principles for PRA Configuration Control Tabletop Inspection Effort
 
Industry and NRC resource Consistent with allocation existing appropriate for regulations, relative safety Build on previous regulatory guides, impact reviews (licensing and license reviews, peer conditions reviews)
 
©2023 Nuclear Energy Institute 3 Key Industry Lessons Learned from Tabletop Inspection Process
 
Overarching theme: clarity and documentation are vital
* Use and definition of various models


Model of record
Model of record
Line 40: Line 28:
Working models
Working models


Application specific models
Application specific models Process for incorporating new types of equipment/operational procedures (e.g. FLEX, OPC)
* Process for incorporating new types of equipment/operational procedures (e.g. FLEX, OPC)
Documentation and procedures for engagement with engineering on modification reviews Key Industry Lessons Learned from Tabletop Inspection Process
* Documentation and procedures for engagement with engineering on modification reviews
 
©2023 Nuclear Energy Institute 4 Industry Actions Moving Forward
 
Internal industry best practices Owners Continued Group report engagement on best with NRC practices
 
High performance in licensee P R A
 
configuration control


©2023 Nuclear Energy Institute 5 Future Engagement with NRC
©2023 Nuclear Energy Institute 5 Industry Actions Moving Forward High performance in licensee PRA configuration control Owners Group report on best practices Internal industry best practices Continued engagement with NRC


Orderly and predictable roll-out Scope of training for NRC regional staff and other staff supporting inspections
©2023 Nuclear Energy Institute 6 Orderly and predictable roll-out Scope of training for NRC regional staff and other staff supporting inspections Consistency in interpretations Delineation between information and operating experience Appropriately sized inspection process Inspection team size Scope of inspection Ensure no repetition of previous reviews Inspection interval Four years conflicts with schedule for application-driven model updates Consider lengthening to make best use of NRC and licensee resources Future Engagement with NRC}}
* Consistency in interpretations
* Delineation between information and operating experience Appropriately sized inspection process
* Inspection team size
* Scope of inspection
* Ensure no repetition of previous reviews Inspection interval
* Four years conflicts with schedule for application-driven model updates
* Consider lengthening to make best use of NRC and licensee resources
©2023 Nuclear Energy Institute 6}}

Latest revision as of 07:40, 27 November 2024

NEI Presentation - March 30, 2023 PRA Configuration Control Public Meeting
ML23088A082
Person / Time
Site: Nuclear Energy Institute
Issue date: 03/30/2023
From:
Nuclear Energy Institute
To:
NRC/NRR/DRA/APOB
References
Download: ML23088A082 (1)


Text

©2023 Nuclear Energy Institute Industry Perspective on NRC Oversight of PRA Configuration Control NRC Public Meeting March 30, 2023

©2023 Nuclear Energy Institute 2 Overview Guiding principles for effort Industry lessons learned from tabletop evaluations Future and ongoing industry actions Continuing points for future evaluation

©2023 Nuclear Energy Institute 3 Guiding Principles for PRA Configuration Control Tabletop Inspection Effort Build on previous reviews (licensing reviews, peer reviews)

Consistent with existing regulations, regulatory guides, and license conditions Industry and NRC resource allocation appropriate for relative safety impact

©2023 Nuclear Energy Institute 4 Overarching theme: clarity and documentation are vital Use and definition of various models

Model of record

Working models

Application specific models Process for incorporating new types of equipment/operational procedures (e.g. FLEX, OPC)

Documentation and procedures for engagement with engineering on modification reviews Key Industry Lessons Learned from Tabletop Inspection Process

©2023 Nuclear Energy Institute 5 Industry Actions Moving Forward High performance in licensee PRA configuration control Owners Group report on best practices Internal industry best practices Continued engagement with NRC

©2023 Nuclear Energy Institute 6 Orderly and predictable roll-out Scope of training for NRC regional staff and other staff supporting inspections Consistency in interpretations Delineation between information and operating experience Appropriately sized inspection process Inspection team size Scope of inspection Ensure no repetition of previous reviews Inspection interval Four years conflicts with schedule for application-driven model updates Consider lengthening to make best use of NRC and licensee resources Future Engagement with NRC