Inspection Manual Change Notice 23-010,: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NRC INSPECTION MANUAL | {{#Wiki_filter:Issue Date: 03/29/23 1 | ||
Number | 23-010 NRC INSPECTION MANUAL IRIB CHANGE NOTICE 23-010 DELETED: | ||
: 1. IMC 0801 | TRANSMITTED: | ||
REMARKS: | Number Date Number Date | ||
: 1. | |||
IMC 0801 03/17/20 IMC 0801 03/29/23 TRAINING: | |||
No special training is required for any documents issued with this Change Notice. | |||
REMARKS: | |||
IMC 0801, "Inspection Program Feedback Process." Removed references to the branch chief counterpart meeting. Removed requirement for regional supervisor review of FBFs prior to submittal. Simplified and modified FBF to reflect current technological practices. Updated resources. Updated flowchart. Added final coordinator steps for closure of FBFs. Updated FBF template and directions. | |||
Expectation No. 15 of the NRC Memorandum titled, Staff Expectations for Inspection Procedure and Inspection Manual Leads of Reactor Oversight Process Governance Documents, (non-Public ML19219A225) August 8, 2019, is included in this revision. | Expectation No. 15 of the NRC Memorandum titled, Staff Expectations for Inspection Procedure and Inspection Manual Leads of Reactor Oversight Process Governance Documents, (non-Public ML19219A225) August 8, 2019, is included in this revision. | ||
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required): | EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required): | ||
| Line 25: | Line 30: | ||
Standard Official Use Only (OUO)-Security Related Information. | Standard Official Use Only (OUO)-Security Related Information. | ||
Please contact: ______ Phone: ________ | Please contact: ______ Phone: ________ | ||
END | END}} | ||
Latest revision as of 07:39, 27 November 2024
| ML23088A178 | |
| Person / Time | |
|---|---|
| Issue date: | 03/29/2023 |
| From: | Madeleine Arel NRC/NRR/DRO/IRIB |
| To: | |
| References | |
| CN 23-010 | |
| Download: ML23088A178 (1) | |
Text
Issue Date: 03/29/23 1
23-010 NRC INSPECTION MANUAL IRIB CHANGE NOTICE 23-010 DELETED:
TRANSMITTED:
Number Date Number Date
- 1.
IMC 0801 03/17/20 IMC 0801 03/29/23 TRAINING:
No special training is required for any documents issued with this Change Notice.
REMARKS:
IMC 0801, "Inspection Program Feedback Process." Removed references to the branch chief counterpart meeting. Removed requirement for regional supervisor review of FBFs prior to submittal. Simplified and modified FBF to reflect current technological practices. Updated resources. Updated flowchart. Added final coordinator steps for closure of FBFs. Updated FBF template and directions.
Expectation No. 15 of the NRC Memorandum titled, Staff Expectations for Inspection Procedure and Inspection Manual Leads of Reactor Oversight Process Governance Documents, (non-Public ML19219A225) August 8, 2019, is included in this revision.
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
DISTRIBUTION:
Standard Official Use Only (OUO)-Security Related Information.
Please contact: ______ Phone: ________
END