2CAN012401, U.S. Additional Protocol: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:S) entergy                                                                                     Riley D. Keele, Jr.
{{#Wiki_filter:S) entergy 2CAN012401 January 17, 2024 Riley D. Keele, Jr.
Manager, Regulatory Assurance Arkansas Nuclear One Tel 479-858-7826 2CAN012401 January 17, 2024 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Manager, Regulatory Assurance Arkansas Nuclear One Tel 479-858-7826 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Subject:==
==Subject:==
==References:==
U.S. Additional Protocol Arkansas Nuclear One - Unit 2 NRC Docket No. 50-368 Renewed Facility Operating License No. NPF-6
U.S. Additional Protocol Arkansas Nuclear One - Unit 2 NRC Docket No. 50-368 Renewed Facility Operating License No. NPF-6
 
: 1.
==References:==
Entergy Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC), "U.S. Additional Protocol," (2CAN020902), dated February 10, 2009.
: 1. Entergy Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC), "U.S. Additional Protocol," (2CAN020902), dated February 10, 2009.
: 2.
: 2. Entergy letter to NRC, "U.S. Additional Protocol," (2CAN011501 ), dated January 22, 2015.
Entergy letter to NRC, "U.S. Additional Protocol," (2CAN011501 ), dated January 22, 2015.
: 3. NRC_AP _Reports Email to Riley Keele (Arkansas Nuclear One), "Final Report - Completion of Required Additional Protocol (AP) Information in accordance with the U.S. - IAEA Treaty Obligations," (2CNA 122301) dated December 6, 2023.
: 3.
NRC_AP _Reports Email to Riley Keele (Arkansas Nuclear One), "Final Report - Completion of Required Additional Protocol (AP) Information in accordance with the U.S. -
IAEA Treaty Obligations," (2CNA 122301) dated December 6, 2023.
By letters dated February 10, 2009 (Reference 1) and January 22, 2015 (Reference 2), Entergy Operations, Inc., transmitted forms for Arkansas Nuclear One, Unit 2, in support of the U.S.
By letters dated February 10, 2009 (Reference 1) and January 22, 2015 (Reference 2), Entergy Operations, Inc., transmitted forms for Arkansas Nuclear One, Unit 2, in support of the U.S.
Additional Protocol per 10 CFR 75.11 (c). This submittal provides a "no changes" report (Form AP-Q) which is enclosed.
Additional Protocol per 1 O CFR 75.11 (c). This submittal provides a "no changes" report (Form AP-Q) which is enclosed.
By email correspondence dated December 6, 2023 (Reference 3), Entergy Operations, Inc understands this is the last annual report for Arkansas Nuclear One, Unit 2.
By email correspondence dated December 6, 2023 (Reference 3), Entergy Operations, Inc understands this is the last annual report for Arkansas Nuclear One, Unit 2.
This letter contains no new regulatory commitments.
This letter contains no new regulatory commitments.
If there are any questions or if additional information is needed, please contact Riley Keele, Manager, Regulatory Assurance, at 479-858-7826.
If there are any questions or if additional information is needed, please contact Riley Keele, Manager, Regulatory Assurance, at 479-858-7826.
Respectfully, ft---A/A.__l- -
Respectfully, ft---A/A.__l --
Brian Adkison ''Acting" Regulatory Assurance Manager for Riley D. Keele, Jr.
Brian Adkison ''Acting" Regulatory Assurance Manager for Riley D. Keele, Jr.
RDK/dkb Entergy Operations, Inc. 1448 S.R 333 Russellville, AR 72802
RDK/dkb Entergy Operations, Inc. 1448 S.R 333 Russellville, AR 72802  


2CAN012401 Page 2 of 2
2CAN012401 Page 2 of 2  


==Enclosure:==
==Enclosure:==
Arkansas Nuclear One, Unit 2 Additional Protocol No Change Report (AP-Q) cc:   NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager - Arkansas Nuclear One Designated State Official Arkansas
Arkansas Nuclear One, Unit 2 Additional Protocol No Change Report (AP-Q) cc:
NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager - Arkansas Nuclear One Designated State Official Arkansas  


ENCLOSURE 2CAN012401 Arkansas Nuclear One, Unit 2 Additional Protocol No Change Report (AP-Q)
ENCLOSURE 2CAN012401 Arkansas Nuclear One, Unit 2 Additional Protocol No Change Report (AP-Q)  


FORM APPROVED* 0MB NO. 0694-0135 U.S. DEPARTMENT OF COMMERCE Date Received Bureau of Industry and Security                               (Leave Blank)
FORM APPROVED* 0MB NO. 0694-0135 U.S. DEPARTMENT OF COMMERCE Bureau of Industry and Security Date Received (Leave Blank)
U.S. NUCLEAR REGULATORY COMMISSION Office of Nuclear Materials Safety and Safe2uards ADDITIONAL PROTOCOL REPORT FORM AP-Q: NO CHANGES REPORT This No Changes Report form may only be used by your site to certify that the information reported in your last submitted Initial, Annual Update or Amended Report has not changed. If you did not submit an Initial, Annual Update, Amended, or a No Changes Report last year, you may not use this form.
U.S. NUCLEAR REGULATORY COMMISSION Office of Nuclear Materials Safety and Safe2uards ADDITIONAL PROTOCOL REPORT FORM AP-Q: NO CHANGES REPORT This No Changes Report form may only be used by your site to certify that the information reported in your last submitted Initial, Annual Update or Amended Report has not changed. If you did not submit an Initial, Annual Update, Amended, or a No Changes Report last year, you may not use this form.
Q.l       Company or Organization Name:
Q.l Company or Organization Name:
Enterav Ooerations. Inc Q.2       Site Name and Site Code:
Enterav Ooerations. Inc Q.2 Site Name and Site Code:
Arkansas Nuclear One - Unit 2 (AP-XKR)
Arkansas Nuclear One - Unit 2 (AP-XKR)
NOTE: The company name as well as the Site Name and Site Code reported in Questions Q.l and Q.2 must be the same as those reported in Forms AP-A and AP-B of last year's Initial, Annual Update, or Amended Report.
NOTE: The company name as well as the Site Name and Site Code reported in Questions Q.l and Q.2 must be the same as those reported in Forms AP-A and AP-B of last year's Initial, Annual Update, or Amended Report.
CERTIFICATION I hereby certify that the information reported in last year's Initial, Annual Update, Amended or No Changes Report is unchanged for the reporting year listed in Question Q.4 below. To the best of my knowledge and belief, the submitted information is true and complete.
CERTIFICATION I hereby certify that the information reported in last year's Initial, Annual Update, Amended or No Changes Report is unchanged for the reporting year listed in Question Q.4 below. To the best of my knowledge and belief, the submitted information is true and complete.
Name and title of responsible official (type or print):
Name and title of responsible official (type or print):
Brian Adkison "Acting" Regulatory Assurance Manager for Q.3         Riley D. Keele, Jr.
Brian Adkison "Acting" Regulatory Assurance Manager for Q.3 Riley D. Keele, Jr.
Manager, Regulatory Assurance s~
Manager, Regulatory Assurance s~
Date Signed (MM-DD-YYYY): 01-17-2024 Q.4       REPORTING YEAR (YYYY): 2023
Date Signed (MM-DD-YYYY): 01-17-2024 Q.4 REPORTING YEAR (YYYY): 2023  


FORM AP-Q: No Changes Report Reporting requirements are set forth in 10     organization official who certifies the CFR Parts 75 and 110 of the U.S. Nuclear       accuracy and completeness of the Regulatory Commission (NRC) Regulations.        information submitted. The signature block must contain an original signature.
FORM AP-Q: No Changes Report Reporting requirements are set forth in 10 CFR Parts 75 and 110 of the U.S. Nuclear Regulatory Commission (NRC) Regulations.
INSTRUCTIONS:
INSTRUCTIONS:
Submit this No Changes Report form only to     Question 0.4 Reporting Year Information:
Submit this No Changes Report form only to certify that all of the information (including POC, address, and activity) reported in the last submitted Initial, Annual Update, Amended or No Changes Report for your site has not changed. If you have not previously submitted a report, you may not use this form.
certify that all of the information (including Provide the reporting year for which this No POC, address, and activity) reported in the     Changes Report applies.
last submitted Initial, Annual Update, Amended or No Changes Report for your site has not changed. If you have not previously submitted a report, you may not use this form.
Question O.lCompany or Organization Name: Provide the name of the company or organization that controls activities for this site. This should be the same company or organization name that was provided on Form AP-A of your last submitted Initial, Annual Update, Amended, or No Changes Report.
Question O.lCompany or Organization Name: Provide the name of the company or organization that controls activities for this site. This should be the same company or organization name that was provided on Form AP-A of your last submitted Initial, Annual Update, Amended, or No Changes Report.
Question 0.2 Site Name and Site Code:
Question 0.2 Site Name and Site Code:
Provide the Site Name and Site Reporting Code of your site. The site name and site code must match those provided on the associated Form AP-B of your last submitted Initial or Annual Update Report.
Provide the Site Name and Site Reporting Code of your site. The site name and site code must match those provided on the associated Form AP-B of your last submitted Initial or Annual Update Report.
Question 0.3 Certification: The report must be signed and dated by a company or}}
Question 0.3 Certification: The report must be signed and dated by a company or organization official who certifies the accuracy and completeness of the information submitted. The signature block must contain an original signature.
Question 0.4 Reporting Year Information:
Provide the reporting year for which this No Changes Report applies.}}

Latest revision as of 06:58, 25 November 2024

U.S. Additional Protocol
ML24017A168
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/17/2024
From: Keele R
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
2CAN012401
Download: ML24017A168 (1)


Text

S) entergy 2CAN012401 January 17, 2024 Riley D. Keele, Jr.

Manager, Regulatory Assurance Arkansas Nuclear One Tel 479-858-7826 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

References:

U.S. Additional Protocol Arkansas Nuclear One - Unit 2 NRC Docket No. 50-368 Renewed Facility Operating License No. NPF-6

1.

Entergy Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC), "U.S. Additional Protocol," (2CAN020902), dated February 10, 2009.

2.

Entergy letter to NRC, "U.S. Additional Protocol," (2CAN011501 ), dated January 22, 2015.

3.

NRC_AP _Reports Email to Riley Keele (Arkansas Nuclear One), "Final Report - Completion of Required Additional Protocol (AP) Information in accordance with the U.S. -

IAEA Treaty Obligations," (2CNA 122301) dated December 6, 2023.

By letters dated February 10, 2009 (Reference 1) and January 22, 2015 (Reference 2), Entergy Operations, Inc., transmitted forms for Arkansas Nuclear One, Unit 2, in support of the U.S.

Additional Protocol per 1 O CFR 75.11 (c). This submittal provides a "no changes" report (Form AP-Q) which is enclosed.

By email correspondence dated December 6, 2023 (Reference 3), Entergy Operations, Inc understands this is the last annual report for Arkansas Nuclear One, Unit 2.

This letter contains no new regulatory commitments.

If there are any questions or if additional information is needed, please contact Riley Keele, Manager, Regulatory Assurance, at 479-858-7826.

Respectfully, ft---A/A.__l --

Brian Adkison Acting" Regulatory Assurance Manager for Riley D. Keele, Jr.

RDK/dkb Entergy Operations, Inc. 1448 S.R 333 Russellville, AR 72802

2CAN012401 Page 2 of 2

Enclosure:

Arkansas Nuclear One, Unit 2 Additional Protocol No Change Report (AP-Q) cc:

NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager - Arkansas Nuclear One Designated State Official Arkansas

ENCLOSURE 2CAN012401 Arkansas Nuclear One, Unit 2 Additional Protocol No Change Report (AP-Q)

FORM APPROVED* 0MB NO. 0694-0135 U.S. DEPARTMENT OF COMMERCE Bureau of Industry and Security Date Received (Leave Blank)

U.S. NUCLEAR REGULATORY COMMISSION Office of Nuclear Materials Safety and Safe2uards ADDITIONAL PROTOCOL REPORT FORM AP-Q: NO CHANGES REPORT This No Changes Report form may only be used by your site to certify that the information reported in your last submitted Initial, Annual Update or Amended Report has not changed. If you did not submit an Initial, Annual Update, Amended, or a No Changes Report last year, you may not use this form.

Q.l Company or Organization Name:

Enterav Ooerations. Inc Q.2 Site Name and Site Code:

Arkansas Nuclear One - Unit 2 (AP-XKR)

NOTE: The company name as well as the Site Name and Site Code reported in Questions Q.l and Q.2 must be the same as those reported in Forms AP-A and AP-B of last year's Initial, Annual Update, or Amended Report.

CERTIFICATION I hereby certify that the information reported in last year's Initial, Annual Update, Amended or No Changes Report is unchanged for the reporting year listed in Question Q.4 below. To the best of my knowledge and belief, the submitted information is true and complete.

Name and title of responsible official (type or print):

Brian Adkison "Acting" Regulatory Assurance Manager for Q.3 Riley D. Keele, Jr.

Manager, Regulatory Assurance s~

Date Signed (MM-DD-YYYY): 01-17-2024 Q.4 REPORTING YEAR (YYYY): 2023

FORM AP-Q: No Changes Report Reporting requirements are set forth in 10 CFR Parts 75 and 110 of the U.S. Nuclear Regulatory Commission (NRC) Regulations.

INSTRUCTIONS:

Submit this No Changes Report form only to certify that all of the information (including POC, address, and activity) reported in the last submitted Initial, Annual Update, Amended or No Changes Report for your site has not changed. If you have not previously submitted a report, you may not use this form.

Question O.lCompany or Organization Name: Provide the name of the company or organization that controls activities for this site. This should be the same company or organization name that was provided on Form AP-A of your last submitted Initial, Annual Update, Amended, or No Changes Report.

Question 0.2 Site Name and Site Code:

Provide the Site Name and Site Reporting Code of your site. The site name and site code must match those provided on the associated Form AP-B of your last submitted Initial or Annual Update Report.

Question 0.3 Certification: The report must be signed and dated by a company or organization official who certifies the accuracy and completeness of the information submitted. The signature block must contain an original signature.

Question 0.4 Reporting Year Information:

Provide the reporting year for which this No Changes Report applies.