ML24025A043: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: | {{#Wiki_filter:From: | ||
Cc: | Timothy Sippel To: | ||
Paulson, Lon E. (GE Power Portfolio); Ollis, Phillip D. (GE Power Portfolio) | |||
Cc: | |||
Paul Startz; Justin Raudabaugh; Joel Rivera Ortiz | |||
==Subject:== | ==Subject:== | ||
Document Request for NCS/TRANS inspection Date: | Document Request for NCS/TRANS inspection Date: | ||
Wednesday, January 10, 2024 4:14:00 PM Attachments: | |||
Phil, Lon, | 2024-001 GNF NCS-TRANS Document Request.docx Phil, Lon, Ill be conducting a nuclear criticality safety inspection at your facility during the week of February 5, 2024. Which will use Inspection Procedure (IP) 88015, Nuclear Criticality Safety. | ||
Ill be conducting a nuclear criticality safety inspection at your facility during the week of February 5, 2024. Which will use Inspection Procedure (IP) 88015, Nuclear Criticality Safety. | |||
Also with me will be Justin Raudabaugh and Paul Startz, who will be performing a transportation inspection using IP 86740, Inspection of Transportation Activities. | Also with me will be Justin Raudabaugh and Paul Startz, who will be performing a transportation inspection using IP 86740, Inspection of Transportation Activities. | ||
Experience has shown that these inspections are resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to conduct a productive inspection, I have attached a request for documents needed for this inspection. It is important that all of these documents are up to date, complete, and ready for the inspectors upon arrival at the facility. Please also let us know if we need to complete any site access training or take other actions to get onsite. | Experience has shown that these inspections are resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to conduct a productive inspection, I have attached a request for documents needed for this inspection. It is important that all of these documents are up to date, complete, and ready for the inspectors upon arrival at the facility. Please also let us know if we need to complete any site access training or take other actions to get onsite. | ||
If possible, an entrance meeting should be scheduled for 14:00 on Monday. Id also like to schedule an exit meeting for Thursday at 16:00. If there are any questions about this inspection or the material requested, particularly in the you find the request unclear or unduly burdensome, please contact me by email, or at 404-997-4525. | If possible, an entrance meeting should be scheduled for 14:00 on Monday. Id also like to schedule an exit meeting for Thursday at 16:00. If there are any questions about this inspection or the material requested, particularly in the you find the request unclear or unduly burdensome, please contact me by email, or at 404-997-4525. | ||
Thank you. - Tim. | Thank you. - Tim. | ||
ML24025A043 | |||
NUCLEAR CRITICALITY SAFETY TRANSPORTATION ACTIVITIES INSPECTION DOCUMENT REQUEST SITE: GNF-A INSPECTION REPORT NUMBER: 2024-001 PRE-INSPECTION VISIT: | |||
NA INSPECTION DATES: | |||
February 5 - 8, 2024 NRC INSPECTORS: | |||
Lead: Timothy Sippel, Timothy.Sippel@nrc.gov Paul Startz, Paul.Startz@nrc.gov Justin Raudabaugh, Justin.Raudabaugh@nrc.gov ACCOMPANYING PERSONNEL: | |||
None ASSOCIATED PROCEDURES: | |||
IP 88015 - Nuclear Criticality Safety (NCS) | |||
IP 86740 - Inspection of Transportation Activities (TRANS) | |||
IDENTIFIED LICENSEE CONTACTS: | IDENTIFIED LICENSEE CONTACTS: | ||
Licensing: | |||
Phillip (Phil) Ollis, Phillip.Ollis@ge.com EHS Manager: | |||
Jonathan Rohner, Jonathan.Rohner@ge.com NCS: | |||
Lon Paulson, Lon.Paulson@ge.com Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing during the inspection visit. The current version of these documents is expected unless specified otherwise. The lead inspector can answer questions regarding specific information needs with licensee staff and may request additional documents. | |||
DOCUMENTATION REQUESTED 1. | |||
Information and Support Requested for NCS Inspection (Sippel) a. | |||
Any new and/or revised CSAs completed since the last NCS inspection (in August) b. | |||
Any new or revised NCS procedures, manuals, and guidance since the last NCS inspection c. | |||
CSAs and QRAs for Node 208, as well as any TDs and IROFS specification documents for the NCS IROFS in Node 208 d. | |||
For the NCS IROFS in Node 208 please also provide any routine testing, maintenance or calibration procedures; including records of the two most recently completed e. | |||
The most recent audit of the NCS program (if any since the last NCS inspection) f. | |||
Any new and/or revised validation reports completed since the last NCS inspection g. | |||
List of NCS and CAAS-related Corrective Action Program entries and any related NCS | |||
safety analyses or evaluations since the last NCS inspection h. | |||
NCS audit reports since the last NCS inspection, schedule for walkdowns and inspections in 2024 i. | |||
Qualification and training records for any NCS staff that have completed a NCS qualification since the last NCS inspection j. | |||
General NCS training material provided to operators k. | |||
Documentation for any recent changes to the CAAS l. | |||
Plans, training, procedures and drill/evacuation records for criticality accident response, including re-entry and post-accident dose assessment | |||
: m. List of any planned CAAS tests; NCS audits; NCS NDA activities; NCS related IROFS tests, PMs, or calibrations scheduled for the inspection week; other NCS related activities occurring during the inspection week n. | |||
Please schedule an NCS weekly walk-down for the NRC to observe 2. | |||
Information and Support Requested for TRANS Inspection (Raudabaugh, Startz) a. | |||
Organization chart for the transportation department b. | |||
Listing the type(s) of package(s) currently used for shipping/receiving UF6, SNM materials and fuel assemblies c. | |||
Inspection, operation, and maintenance procedures used for the preparation and packaging of transportation packages for shipping/receipt of UF6, SNM materials and fuel assemblies, this includes both the manufacturers and licensees procedures as applicable d. | |||
Registration for the transportation packages e. | |||
Drawings/manufacturers specifications for the transportation packages, limited to top tier drawings, please provide large size drawings, these documents can be provided during the inspection f. | |||
Manifests and records for shipments over the last 2 years for each type of package used for each shipment, this request is limited to 3 samples for each type of package over the last 2 years g. | |||
List of condition reports since the last TRANS inspection pertaining to radioactive material (RAM) shipment and transportation activities h. | |||
Any independent audits or assessments of the RAM transportation program (e.g., audit reports, QA surveillances) since the last TRANS inspection i. | |||
List of any 71.95 reports since the last TRANS inspection; and discussion of any that are in progress, or planned for the near future (the next 90 days), these documents can be provided during the inspection j. | |||
: m. | Qualification plans and required training lists for individuals responsible for RAM shipping and transportation, these documents can be provided during the inspection week | ||
* Will request training records for select personnel during the inspection week k. | |||
Inspection checklist for the last outgoing RAM shipments include contents of the package, to include weight, isotope, and physical form, limited to 2 samples of each type of package l. | |||
Radiological survey records for the packages for the last two shipments of each type as well as the survey records for the (outgoing) delivery vehicle | |||
: m. Receipt inspections/surveys for the packages for the last two shipments of each type and the (incoming) delivery vehicle n. | |||
Schedule of transportation activities scheduled for the week of the inspection | |||
* Will request training records for select personnel during the inspection week | |||
: m. | |||
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.}} | o. | ||
In-person review of DOE/NRC Form 741 Nuclear Material Transaction Reporting activities. | |||
PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average 1 hour per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503. | |||
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.}} | |||
Latest revision as of 20:41, 24 November 2024
| ML24025A043 | |
| Person / Time | |
|---|---|
| Issue date: | 01/10/2024 |
| From: | Timothy Sippel NRC/RGN-II/DFFI/FFB1 |
| To: | Ollis P, Paulson L GE-Hitachi Nuclear Energy Americas |
| References | |
| Download: ML24025A043 (1) | |
Text
From:
Timothy Sippel To:
Paulson, Lon E. (GE Power Portfolio); Ollis, Phillip D. (GE Power Portfolio)
Cc:
Paul Startz; Justin Raudabaugh; Joel Rivera Ortiz
Subject:
Document Request for NCS/TRANS inspection Date:
Wednesday, January 10, 2024 4:14:00 PM Attachments:
2024-001 GNF NCS-TRANS Document Request.docx Phil, Lon, Ill be conducting a nuclear criticality safety inspection at your facility during the week of February 5, 2024. Which will use Inspection Procedure (IP) 88015, Nuclear Criticality Safety.
Also with me will be Justin Raudabaugh and Paul Startz, who will be performing a transportation inspection using IP 86740, Inspection of Transportation Activities.
Experience has shown that these inspections are resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to conduct a productive inspection, I have attached a request for documents needed for this inspection. It is important that all of these documents are up to date, complete, and ready for the inspectors upon arrival at the facility. Please also let us know if we need to complete any site access training or take other actions to get onsite.
If possible, an entrance meeting should be scheduled for 14:00 on Monday. Id also like to schedule an exit meeting for Thursday at 16:00. If there are any questions about this inspection or the material requested, particularly in the you find the request unclear or unduly burdensome, please contact me by email, or at 404-997-4525.
Thank you. - Tim.
NUCLEAR CRITICALITY SAFETY TRANSPORTATION ACTIVITIES INSPECTION DOCUMENT REQUEST SITE: GNF-A INSPECTION REPORT NUMBER: 2024-001 PRE-INSPECTION VISIT:
NA INSPECTION DATES:
February 5 - 8, 2024 NRC INSPECTORS:
Lead: Timothy Sippel, Timothy.Sippel@nrc.gov Paul Startz, Paul.Startz@nrc.gov Justin Raudabaugh, Justin.Raudabaugh@nrc.gov ACCOMPANYING PERSONNEL:
None ASSOCIATED PROCEDURES:
IP 88015 - Nuclear Criticality Safety (NCS)
IP 86740 - Inspection of Transportation Activities (TRANS)
IDENTIFIED LICENSEE CONTACTS:
Licensing:
Phillip (Phil) Ollis, Phillip.Ollis@ge.com EHS Manager:
Jonathan Rohner, Jonathan.Rohner@ge.com NCS:
Lon Paulson, Lon.Paulson@ge.com Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing during the inspection visit. The current version of these documents is expected unless specified otherwise. The lead inspector can answer questions regarding specific information needs with licensee staff and may request additional documents.
DOCUMENTATION REQUESTED 1.
Information and Support Requested for NCS Inspection (Sippel) a.
Any new and/or revised CSAs completed since the last NCS inspection (in August) b.
Any new or revised NCS procedures, manuals, and guidance since the last NCS inspection c.
CSAs and QRAs for Node 208, as well as any TDs and IROFS specification documents for the NCS IROFS in Node 208 d.
For the NCS IROFS in Node 208 please also provide any routine testing, maintenance or calibration procedures; including records of the two most recently completed e.
The most recent audit of the NCS program (if any since the last NCS inspection) f.
Any new and/or revised validation reports completed since the last NCS inspection g.
List of NCS and CAAS-related Corrective Action Program entries and any related NCS
safety analyses or evaluations since the last NCS inspection h.
NCS audit reports since the last NCS inspection, schedule for walkdowns and inspections in 2024 i.
Qualification and training records for any NCS staff that have completed a NCS qualification since the last NCS inspection j.
General NCS training material provided to operators k.
Documentation for any recent changes to the CAAS l.
Plans, training, procedures and drill/evacuation records for criticality accident response, including re-entry and post-accident dose assessment
- m. List of any planned CAAS tests; NCS audits; NCS NDA activities; NCS related IROFS tests, PMs, or calibrations scheduled for the inspection week; other NCS related activities occurring during the inspection week n.
Please schedule an NCS weekly walk-down for the NRC to observe 2.
Information and Support Requested for TRANS Inspection (Raudabaugh, Startz) a.
Organization chart for the transportation department b.
Listing the type(s) of package(s) currently used for shipping/receiving UF6, SNM materials and fuel assemblies c.
Inspection, operation, and maintenance procedures used for the preparation and packaging of transportation packages for shipping/receipt of UF6, SNM materials and fuel assemblies, this includes both the manufacturers and licensees procedures as applicable d.
Registration for the transportation packages e.
Drawings/manufacturers specifications for the transportation packages, limited to top tier drawings, please provide large size drawings, these documents can be provided during the inspection f.
Manifests and records for shipments over the last 2 years for each type of package used for each shipment, this request is limited to 3 samples for each type of package over the last 2 years g.
List of condition reports since the last TRANS inspection pertaining to radioactive material (RAM) shipment and transportation activities h.
Any independent audits or assessments of the RAM transportation program (e.g., audit reports, QA surveillances) since the last TRANS inspection i.
List of any 71.95 reports since the last TRANS inspection; and discussion of any that are in progress, or planned for the near future (the next 90 days), these documents can be provided during the inspection j.
Qualification plans and required training lists for individuals responsible for RAM shipping and transportation, these documents can be provided during the inspection week
- Will request training records for select personnel during the inspection week k.
Inspection checklist for the last outgoing RAM shipments include contents of the package, to include weight, isotope, and physical form, limited to 2 samples of each type of package l.
Radiological survey records for the packages for the last two shipments of each type as well as the survey records for the (outgoing) delivery vehicle
- m. Receipt inspections/surveys for the packages for the last two shipments of each type and the (incoming) delivery vehicle n.
Schedule of transportation activities scheduled for the week of the inspection
o.
In-person review of DOE/NRC Form 741 Nuclear Material Transaction Reporting activities.
PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.