ENS 57374: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 24: | Line 24: | ||
THIS MATERIAL EVENT CONTAINS A 'Less than Cat 3' LEVEL OF RADIOACTIVE MATERIAL | THIS MATERIAL EVENT CONTAINS A 'Less than Cat 3' LEVEL OF RADIOACTIVE MATERIAL | ||
Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf | Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20241018en.html#en57374 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 07:20, 18 October 2024
Where | |
---|---|
Dunn Construction Birmingham, Alabama (NRC Region 1) | |
License number: | RML 812 |
Organization: | Alabama Radiation Control |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+37.22 h1.551 days <br />0.222 weeks <br />0.051 months <br />) | |
Opened: | Cason Coan 18:13 Oct 10, 2024 |
NRC Officer: | Karen Cotton-Gross |
Last Updated: | Oct 10, 2024 |
57374 - NRC Website | |