ML23341A008: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML23341A008 | | number = ML23341A008 | ||
| issue date = 12/07/2023 | | issue date = 12/07/2023 | ||
| title = M231212: Slides - K. Wendtland - Discussion of the | | title = M231212: Slides - K. Wendtland - Discussion of the Administrations Short- and Long-Term Domestic Uranium Fuel Strategy | ||
| author name = Wendtland K | | author name = Wendtland K | ||
| author affiliation = NRC/OCM | | author affiliation = NRC/OCM | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Nuclear Regulatory Commission Short-and Long -Term Domestic Uranium Fuel Strategy and NRCs Readiness to Support Licensing Oversight | ||
Uranium Recovery Program Operations and License Applications in Wyoming | |||
NRC Commission | |||
December 12, 2023 | |||
Kyle Wendtland Wyoming Department of Environmental Quality Land Quality Division Administrator | |||
1 Conventional Mill/Tailings In-situ Recovery | |||
: 1) Anadarko Bear Creek 1) UR-Energy Lost Creek | |||
: 2) ExxonMobil Highland 2) AUC Reno Creek | |||
: 3) Cameco Smith Ranch/Highland | |||
: 3) Orano LuckyMc | |||
: 4) UEC Uranium Corp. Willow Creek | |||
: 4) Umetco Gas Hills 5) Strata Ross | |||
: 5) Pathfinder Shirley Basin North 6) Energy Fuels Nichols Ranch | |||
: 6) Kennecott Sweetwater 7) UEC Wyoming Corp. Moore Ranch | |||
: 8) Pathfinder Shirley Basin ISR | |||
2 Title II Site Summaries | |||
Company Facility Site Status Anadarko Petroleum Bear Creek Decommissioning - Near License Termination Corporation ExxonMobil Corporation Highland Decommissioning | |||
Areva NC, Inc. Lucky Mc Mill Decommissioning Umetco Minerals Gas Hills East Decommissioning Corporation Pathfinder Mines Shirley Basin North Accepting 11e.(2) waste Corporation Kennecott Uranium Sweetwater Mill Standby - company keeps all equipment Company functional (4.1 Million Pounds of Yellowcake Annual Production Limit ) | |||
* Western Nuclear Inc. Split Rock Decommissioning Complete Site Transferred to Department of Energy for Long Term Care and Maintenance | |||
3 ISR Licensed Annual Capacity | |||
Company Facility Site Status Licensed Annual Production Capacity | |||
Cameco 1) Smith Ranch-Highland GW Restoration / Standby Resources | |||
: 2) North Butte GW Restoration / Standby Total capacity all sites 5.5 Million Pounds | |||
: 3) Gas Hills GW Restoration / Standby | |||
: 4) Ruth Not Yet Constructed | |||
: 5) Reynolds Ranch Not Yet Constructed | |||
Energy Fuels Nichols Ranch GW Restoration / Standby 2.0 Million Pounds | |||
Strata Energy Ross Facility Producing 3.0 Million Pounds Inc. | |||
UEC Wyoming 1) Moore Ranch Not Yet Constructed 3.0 Million Pounds Corp. | |||
4 ISR Licensed Annual Capacity (Continued) | |||
Company Facility Site Status Licensed Annual Production Capacity | |||
(continued) 2) Willow Creek GW Restoration / Standby | |||
* Christensen Ranch /Irigary UEC Uranium 3) Ludeman 2.5 Million Pounds Corp. Not Yet Constructed | |||
Lost Creek ISR, Lost Creek Producing 2.2 Million Pounds LLC | |||
AUC LLC Reno Creek Not Yet Constructed 2.0 Million Pounds | |||
Pathfinder Shirley Basin ISR Not Yet Constructed 2.0 Million Pounds Mines Corporation | |||
5 Wyoming Licensed Production Capacity | |||
Facility Type Licensed Annual Production Capacity | |||
Title II Sites (conventional / surface) (Sweetwater) 4.1 Million Pounds | |||
Producing (ISR) (Ross, Lost Creek) 5.2 Million Pounds | |||
Standby (ISR) (Smith Ranch-Highland, North Butte, Gas Hills, Nichols Ranch, Willow 10 Million Pounds Creek) | |||
Not Yet Constructed (ISR) (Ruth, Reynolds Ranch, Moore Ranch, Ludeman, Reno 7 Million Pounds Creek, Shirley Basin) | |||
All Licensed Capacity (ISR) 22.2 Million Pounds | |||
All (Title II plus ISR) 26.3 Million Pounds | |||
6 Challenges to Production Increases | |||
Federal Regulatory Actions and Approvals (e.g. timely EPA aquifer exemption approvals) | |||
Streamline and add certainty to the permitting process (e.g. clarification of EPAs role) | |||
Streamline and add certainty the NEPA process | |||
Supply chain and labor challenges | |||
Technical challenges (expected and unexpected) | |||
Encourage exploration and new production | |||
Endangered species | |||
Litigation | |||
7 Questions? | |||
deq.wyoming.gov/land-quality/uranium/ | |||
8}} |
Revision as of 02:16, 6 October 2024
ML23341A008 | |
Person / Time | |
---|---|
Issue date: | 12/07/2023 |
From: | Wendtland K NRC/OCM |
To: | |
Shared Package | |
ML23307A078 | List: |
References | |
M231212 | |
Download: ML23341A008 (1) | |
Text
Nuclear Regulatory Commission Short-and Long -Term Domestic Uranium Fuel Strategy and NRCs Readiness to Support Licensing Oversight
Uranium Recovery Program Operations and License Applications in Wyoming
NRC Commission
December 12, 2023
Kyle Wendtland Wyoming Department of Environmental Quality Land Quality Division Administrator
1 Conventional Mill/Tailings In-situ Recovery
- 1) Anadarko Bear Creek 1) UR-Energy Lost Creek
- 2) ExxonMobil Highland 2) AUC Reno Creek
- 3) Cameco Smith Ranch/Highland
- 3) Orano LuckyMc
- 4) UEC Uranium Corp. Willow Creek
- 4) Umetco Gas Hills 5) Strata Ross
- 5) Pathfinder Shirley Basin North 6) Energy Fuels Nichols Ranch
- 6) Kennecott Sweetwater 7) UEC Wyoming Corp. Moore Ranch
- 8) Pathfinder Shirley Basin ISR
2 Title II Site Summaries
Company Facility Site Status Anadarko Petroleum Bear Creek Decommissioning - Near License Termination Corporation ExxonMobil Corporation Highland Decommissioning
Areva NC, Inc. Lucky Mc Mill Decommissioning Umetco Minerals Gas Hills East Decommissioning Corporation Pathfinder Mines Shirley Basin North Accepting 11e.(2) waste Corporation Kennecott Uranium Sweetwater Mill Standby - company keeps all equipment Company functional (4.1 Million Pounds of Yellowcake Annual Production Limit )
- Western Nuclear Inc. Split Rock Decommissioning Complete Site Transferred to Department of Energy for Long Term Care and Maintenance
3 ISR Licensed Annual Capacity
Company Facility Site Status Licensed Annual Production Capacity
Cameco 1) Smith Ranch-Highland GW Restoration / Standby Resources
- 2) North Butte GW Restoration / Standby Total capacity all sites 5.5 Million Pounds
- 3) Gas Hills GW Restoration / Standby
- 4) Ruth Not Yet Constructed
- 5) Reynolds Ranch Not Yet Constructed
Energy Fuels Nichols Ranch GW Restoration / Standby 2.0 Million Pounds
Strata Energy Ross Facility Producing 3.0 Million Pounds Inc.
UEC Wyoming 1) Moore Ranch Not Yet Constructed 3.0 Million Pounds Corp.
4 ISR Licensed Annual Capacity (Continued)
Company Facility Site Status Licensed Annual Production Capacity
(continued) 2) Willow Creek GW Restoration / Standby
- Christensen Ranch /Irigary UEC Uranium 3) Ludeman 2.5 Million Pounds Corp. Not Yet Constructed
Lost Creek ISR, Lost Creek Producing 2.2 Million Pounds LLC
AUC LLC Reno Creek Not Yet Constructed 2.0 Million Pounds
Pathfinder Shirley Basin ISR Not Yet Constructed 2.0 Million Pounds Mines Corporation
5 Wyoming Licensed Production Capacity
Facility Type Licensed Annual Production Capacity
Title II Sites (conventional / surface) (Sweetwater) 4.1 Million Pounds
Producing (ISR) (Ross, Lost Creek) 5.2 Million Pounds
Standby (ISR) (Smith Ranch-Highland, North Butte, Gas Hills, Nichols Ranch, Willow 10 Million Pounds Creek)
Not Yet Constructed (ISR) (Ruth, Reynolds Ranch, Moore Ranch, Ludeman, Reno 7 Million Pounds Creek, Shirley Basin)
All Licensed Capacity (ISR) 22.2 Million Pounds
All (Title II plus ISR) 26.3 Million Pounds
6 Challenges to Production Increases
Federal Regulatory Actions and Approvals (e.g. timely EPA aquifer exemption approvals)
Streamline and add certainty to the permitting process (e.g. clarification of EPAs role)
Streamline and add certainty the NEPA process
Supply chain and labor challenges
Technical challenges (expected and unexpected)
Encourage exploration and new production
Endangered species
Litigation
7 Questions?
deq.wyoming.gov/land-quality/uranium/
8