ML24052A070: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 23: Line 23:


==Dear Dr. Frey:==
==Dear Dr. Frey:==
During the week of April 29. 2024, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your University of California-Davis reactor.
During the week of April 29. 2024, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your University of California-Davis reactor.
The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.
The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.
Line 33: Line 32:
: 2. Written examination cc: w/enclosures to GovDelivery SubscribersMay 20, 2024 Signed by Tate, Travis on 05/20/24
: 2. Written examination cc: w/enclosures to GovDelivery SubscribersMay 20, 2024 Signed by Tate, Travis on 05/20/24


ML24052A070                                                                                         NRR-079 OFFICE     NRR/DANU/UNPO/CE       NRR/DANU/UNPO/OLA         NRR/DANU/UNPO/BC NAME       MDeSouza               NJones                   TTate DATE       5/20/2024               5/20/2024                 5/20/2024 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT
ML24052A070 NRR-079 OFFICE NRR/DANU/UNPO/CE NRR/DANU/UNPO/OLA NRR/DANU/UNPO/BC NAME MDeSouza NJones TTate DATE 5/20/2024 5/20/2024 5/20/2024 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT


REPORT NO.:                       50-607/OL-24-01
REPORT NO.: 50-607/OL-24-01


FACILITY DOCKET NO.:     50-607
FACILITY DOCKET NO.: 50-607


FACILITY LICENSE NO.:     R-130
FACILITY LICENSE NO.: R-130


FACILITY:                             University of California - Davis/McClellan Reactor
FACILITY: University of California - Davis/McClellan Reactor


EXAMINATION DATES:       April 30, 2024
EXAMINATION DATES: April 30, 2024


SUBMITTED BY:                                           ________             05/01/2024 Michele C. DeSouza, Chief Examiner                 Date
SUBMITTED BY: ________ 05/01/2024 Michele C. DeSouza, Chief Examiner Date


==SUMMARY==
==SUMMARY==
During the week of April 30, 2024, the NRC administered operator licensing examinations to one Reactor Operator (RO) candidate. The candidate passed all applicable portions of the examinations and tests.
During the week of April 30, 2024, the NRC administered operator licensing examinations to one Reactor Operator (RO) candidate. The candidate passed all applicable portions of the examinations and tests.


REPORT DETAILS
REPORT DETAILS
: 1.       Examiner:       Michele C. DeSouza, Chief Examiner, NRC
: 1. Examiner: Michele C. DeSouza, Chief Examiner, NRC
: 2.       Results:
: 2. Results:
RO PASS/FAIL     SRO PASS/FAIL       TOTAL PASS/FAIL
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL


Written                 1/0               NA                   1/0
Written 1/0 NA 1/0


Operating Tests         1/0               NA                   1/0
Operating Tests 1/0 NA 1/0


Overall                 1/0               NA                   1/0
Overall 1/0 NA 1/0
: 3.       Exit Meeting:
: 3. Exit Meeting:
Wesley Frey, Reactor Director, University of California - Davis/McClellan Reactor Michele C. DeSouza, Chief Examiner, NRC
Wesley Frey, Reactor Director, University of California - Davis/McClellan Reactor Michele C. DeSouza, Chief Examiner, NRC


Line 74: Line 72:
Week of April 29, 2024 U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR LICENSE EXAMINATION
Week of April 29, 2024 U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR LICENSE EXAMINATION


FACILITY:                             University of California-Davis
FACILITY: University of California-Davis


REACTOR TYPE:                 TRIGA
REACTOR TYPE: TRIGA


DATE ADMINISTERED:       April 29, 2024
DATE ADMINISTERED: April 29, 2024


CANDIDATE:                         _______________________
CANDIDATE: _______________________


INSTRUCTIONS TO CANDIDATE:
INSTRUCTIONS TO CANDIDATE:
Answers are to be written on the Answer sheet provided. Attach all Answer sheets to the examination. Point values are indicated in parentheses for each question. A 70% in each category is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
Answers are to be written on the Answer sheet provided. Attach all Answer sheets to the examination. Point values are indicated in parentheses for each question. A 70% in each category is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.


                                                              % OF CATEGORY % OF CANDIDATE'S   CATEGORY VALUE     TOTAL     SCORE             VALUE               CATEGORY
% OF CATEGORY % OF CANDIDATE'S CATEGORY VALUE TOTAL SCORE VALUE CATEGORY


19.00         33.3                                                 A. REACTOR THEORY, THERMODYNAMICS AND FACILITY OPERATING CHARACTERISTICS
19.00 33.3 A. REACTOR THEORY, THERMODYNAMICS AND FACILITY OPERATING CHARACTERISTICS


20.00       33.3                                                 B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS
20.00 33.3 B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS


20.00       33.3                                                 C. FACILITY AND RADIATION MONITORING SYSTEMS
20.00 33.3 C. FACILITY AND RADIATION MONITORING SYSTEMS


59.00                                                           %   TOTALS FINAL GRADE
59.00 % TOTALS FINAL GRADE


All work done on this examination is my own. I have neither given nor received aid.
All work done on this examination is my own. I have neither given nor received aid.
Line 100: Line 98:


NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
: 1.       Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
: 2.       After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
: 3.       Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
: 4.       Use black ink or dark pencil only to facilitate legible reproductions.
: 4. Use black ink or dark pencil only to facilitate legible reproductions.
: 5.       Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each Answer sheet.
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each Answer sheet.
: 6.       Mark your Answers on the Answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
: 6. Mark your Answers on the Answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
: 7.       The point value for each question is indicated in [brackets] after the question.
: 7. The point value for each question is indicated in [brackets] after the question.
: 8.       If the intent of a question is unclear, ask questions of the examiner only.
: 8. If the intent of a question is unclear, ask questions of the examiner only.
: 9.       When turning in your examination, assemble the completed examination with examination questions, examination aids and Answer sheets. In addition turn in all scrap paper.
: 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and Answer sheets. In addition turn in all scrap paper.
: 10.     Ensure all information you wish to have evaluated as part of your Answer is on your Answer sheet. Scrap paper will be disposed of immediately following the examination.
: 10. Ensure all information you wish to have evaluated as part of your Answer is on your Answer sheet. Scrap paper will be disposed of immediately following the examination.
: 11.     To pass the examination you must achieve a grade of 70 percent or greater in each category and an overall grade of 70 percent or greater.
: 11. To pass the examination you must achieve a grade of 70 percent or greater in each category and an overall grade of 70 percent or greater.
: 12.     There is a time limit of three (3) hours for completion of the examination.
: 12. There is a time limit of three (3) hours for completion of the examination.
Category A: Reactor Theory, Thermodynamics, & Facility Operating Characteristics
Category A: Reactor Theory, Thermodynamics, & Facility Operating Characteristics


A N S W E R   S H E E T
A N S W E R S H E E T


Multiple Choice (Circle or X your choice)
Multiple Choice (Circle or X your choice)
If you change your answer, write your selection in the blank.
If you change your answer, write your selection in the blank.


A01   a   b   c   d   _____
A01 a b c d _____


A02   a   b   c   d   _____
A02 a b c d _____


A03   a __________ b __________ c __________ d __________ (0.25 each)
A03 a __________ b __________ c __________ d __________ (0.25 each)


A04   a   b   c   d   _____ NRC DELETED QUESTION, MISSING INFORMATION
A04 a b c d _____ NRC DELETED QUESTION, MISSING INFORMATION


A05   a   b   c   d   _____
A05 a b c d _____


A06   a   b   c   d   _____
A06 a b c d _____


A07   a   b   c   d   _____
A07 a b c d _____


A08   a   b   c   d   _____
A08 a b c d _____


A09   a   b   c   d   _____
A09 a b c d _____


A10   a   b   c   d   _____
A10 a b c d _____


A11 a   b   c   d   _____
A11 a b c d _____


A12   a   b   c   d   _____
A12 a b c d _____


A13   a   b   c   d   _____
A13 a b c d _____


A14   a   b   c   d   _____
A14 a b c d _____


A15   a   b   c   d   _____
A15 a b c d _____


A16   a   b   c   d   _____
A16 a b c d _____


A17   a   b   c   d   _____
A17 a b c d _____


A18   a   b   c   d   _____
A18 a b c d _____


A19   a   b   c   d   _____
A19 a b c d _____


A20   a   b   c   d   _____
A20 a b c d _____


(***** END OF CATEGORY A *****)
(***** END OF CATEGORY A *****)
Category B: Normal/Emergency Operating Procedures and Radiological Controls
Category B: Normal/Emergency Operating Procedures and Radiological Controls


A N S W E R   S H E E T
A N S W E R S H E E T


Multiple Choice (Circle or X your choice)
Multiple Choice (Circle or X your choice)
If you change your answer, write your selection in the blank.
If you change your answer, write your selection in the blank.


B01   a __________ b __________ c __________ d __________ (0.25 each)
B01 a __________ b __________ c __________ d __________ (0.25 each)


B02   a   b   c   d   _____
B02 a b c d _____


B03   a   b   c   d   _____
B03 a b c d _____


B04   a   b   c   d   _____
B04 a b c d _____


B05   a   b   c   d   _____
B05 a b c d _____


B06   a   b   c   d   _____
B06 a b c d _____


B07   a   b   c   d   _____
B07 a b c d _____


B08   a   b   c   d   _____
B08 a b c d _____


B09   a   b   c   d   _____
B09 a b c d _____


B10   a __________ b __________ c __________ (0.33 each)
B10 a __________ b __________ c __________ (0.33 each)


B11   a   b   c   d   _____
B11 a b c d _____


B12   a   b   c   d   _____
B12 a b c d _____


B13   a   b   c   d   _____
B13 a b c d _____


B14   a   b   c   d   _____
B14 a b c d _____


B15   a __________ b __________ c __________ (0.33 each)
B15 a __________ b __________ c __________ (0.33 each)


B16   a   b   c   d   _____
B16 a b c d _____


B17   a   b   c   d   _____
B17 a b c d _____


B18   a   b   c   d   _____
B18 a b c d _____


B19   a   b   c   d   _____
B19 a b c d _____


B20   a   b   c   d   _____
B20 a b c d _____


(***** END OF CATEGORY B *****)
(***** END OF CATEGORY B *****)
Category C: Facility and Radiation Monitoring Systems
Category C: Facility and Radiation Monitoring Systems


A N S W E R   S H E E T
A N S W E R S H E E T


Multiple Choice (Circle or X your choice)
Multiple Choice (Circle or X your choice)
If you change your answer, write your selection in the blank.
If you change your answer, write your selection in the blank.


C01   a   b   c   d   _____
C01 a b c d _____


C02   a   b   c   d   _____
C02 a b c d _____


C03   a   b   c   d   _____
C03 a b c d _____


C04   a   b   c   d   _____
C04 a b c d _____


C05   a   b   c   d   _____
C05 a b c d _____


C06   a   b   c   d   _____
C06 a b c d _____


C07   a   b   c   d   _____
C07 a b c d _____


C08   a   b   c   d   _____
C08 a b c d _____


C09   a   b   c   d   _____
C09 a b c d _____


C10   a   b   c   d   _____
C10 a b c d _____


C11   a   b   c   d   _____
C11 a b c d _____


C12   a   b   c   d   _____
C12 a b c d _____


C13   a   b   c   d   _____
C13 a b c d _____


C14   a   b   c   d   _____
C14 a b c d _____


C15   a   b   c   d   _____
C15 a b c d _____


C16   a   b   c   d   _____
C16 a b c d _____


C17   a   b   c   d   _____
C17 a b c d _____


C18   a   b   c   d   _____
C18 a b c d _____


C19   a   b   c   d   _____
C19 a b c d _____


C20   a   b   c   d   _____
C20 a b c d _____


(***** END OF CATEGORY C *****)
(***** END OF CATEGORY C *****)
Line 259: Line 257:
EQUATION SHEET
EQUATION SHEET


2                   0.1sec1 QmcPTmH UAT               Pmax 2                     eff
2 0.1sec1 QmcPTmH UAT Pmax 2 eff


t                         S     S
t S S
* 4 P P0e                     SCR                           110 sec 1 Keff
* 4 P P0e SCR 110 sec 1 Keff


eff           CR1 1CR22       CR 1K CR 1K SUR 26.06                                           1   eff1   2   eff2
eff CR1 1CR22 CR 1K CR 1K SUR 26.06 1 eff1 2 eff2


1                     M     1   CR2                 P P 10SUR(t)
1 M 1 CR2 P P 10SUR(t)
P       P0                       1 K   CR                       0 eff   1
P P0 1 K CR 0 eff 1


1 Keff1                         1 K
1 Keff1 1 K
* M 1 K                         SDM       eff                  
* M 1 K SDM eff  


eff2                           Keff                          
eff2 Keff  


= +                                   0.693                       K   K eff2 eff1 T1 2                               K K eff1eff2
= + 0.693 K K eff2 eff1 T1 2 K K eff1eff2


Keff1                       DR DR et                     2       2 K                                 0                   DR1 d1 DR2d2 eff
Keff1 DR DR et 2 2 K 0 DR1 d1 DR2d2 eff


6CiE n                     2   2 DR                               2       1 R2                         Peak2     Peak1
6CiE n 2 2 DR 2 1 R2 Peak2 Peak1


1 Curie = 3.7 x 1010 dis/sec                     1 kg = 2.21 lb 1 Horsepower = 2.54 x 103 BTU/hr                 1 Mw = 3.41 x 106 BTU/hr
1 Curie = 3.7 x 1010 dis/sec 1 kg = 2.21 lb 1 Horsepower = 2.54 x 103 BTU/hr 1 Mw = 3.41 x 106 BTU/hr


1 BTU = 778 ft-lb                               °F = 9/5 °C + 32 1 gal (H2O) 8 lb                               °C = 5/9 (°F - 32) cP = 1.0 BTU/hr/lb/°F                           cp = 1 cal/sec/gm/°C Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
1 BTU = 778 ft-lb °F = 9/5 °C + 32 1 gal (H2O) 8 lb °C = 5/9 (°F - 32) cP = 1.0 BTU/hr/lb/°F cp = 1 cal/sec/gm/°C Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics


QUESTION   A.01   [1.0 point]
QUESTION A.01 [1.0 point]
Which ONE of the following is how delayed neutrons are produced?
Which ONE of the following is how delayed neutrons are produced?
: a. Directly from fission
: a. Directly from fission
Line 291: Line 289:
: d. Decay of fission fragments
: d. Decay of fission fragments


QUESTION   A.02   [1.0 point]
QUESTION A.02 [1.0 point]
Which ONE of the following describes the term PROMPT DROP?
Which ONE of the following describes the term PROMPT DROP?
: a. Reactor is subcritical at negative 80-second period
: a. Reactor is subcritical at negative 80-second period
Line 298: Line 296:
: d. Instantaneous change in power level due to withdrawing a control rod
: d. Instantaneous change in power level due to withdrawing a control rod


QUESTION   A.03   [1.0 point, 0.25 each]
QUESTION A.03 [1.0 point, 0.25 each]
Replace X with the type of primary decay necessary (Alpha, Positron, Gamma or Neutron emission) to produce the following reactions. Choices may be used once, more than once, or not at all.
Replace X with the type of primary decay necessary (Alpha, Positron, Gamma or Neutron emission) to produce the following reactions. Choices may be used once, more than once, or not at all.
: a. 92U238       90Th234   + X
: a. 92U238 90Th234 + X
: b. 83Bi203       82Pb203 + X
: b. 83Bi203 82Pb203 + X
: c. 2He4 + 4Be9         6C12 + X
: c. 2He4 + 4Be9 6C12 + X
: d. 84Po210         82Pb206 + X
: d. 84Po210 82Pb206 + X


QUESTION   A.04   [1.0 point] NRC DELETED QUESTION, MISSING INFORMATION In a reactor, at 50-watt power, adding 1.0% k/k worth of reactivity will cause which ONE of the following?
QUESTION A.04 [1.0 point] NRC DELETED QUESTION, MISSING INFORMATION In a reactor, at 50-watt power, adding 1.0% k/k worth of reactivity will cause which ONE of the following?
: a. 22.9 kW
: a. 22.9 kW
: b. 14.8 kW
: b. 14.8 kW
: c. 4.91 kW
: c. 4.91 kW
: d. 1.31 kW Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
: d. 1.31 kW Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics


QUESTION   A.05   [1.0 point]
QUESTION A.05 [1.0 point]
If reactor period is ________, then reactor power is ________.
If reactor period is ________, then reactor power is ________.
: a. Positive, stable
: a. Positive, stable
Line 318: Line 316:
: d. Negative, increasing
: d. Negative, increasing


QUESTION   A.06   [1.0 point]
QUESTION A.06 [1.0 point]
Which ONE of the following describes the relationship between reactivity and criticality?
Which ONE of the following describes the relationship between reactivity and criticality?
: a. The smaller the absolute value of reactivity in the core, the further the reactor is from criticality.
: a. The smaller the absolute value of reactivity in the core, the further the reactor is from criticality.
Line 325: Line 323:
: d. Reactivity is zero when the reactor is critical, reactivity is positive when the reactor is subcritical.
: d. Reactivity is zero when the reactor is critical, reactivity is positive when the reactor is subcritical.


QUESTION   A.07   [1.0 point]
QUESTION A.07 [1.0 point]
Which ONE of the following is the expected stable neutron count rate, given a source strength of 1000 Neutrons/second and a multiplication factor of 0.8?
Which ONE of the following is the expected stable neutron count rate, given a source strength of 1000 Neutrons/second and a multiplication factor of 0.8?
: a. 700 N/sec
: a. 700 N/sec
: b. 5000 N/sec
: b. 5000 N/sec
: c. 10,000 N/sec
: c. 10,000 N/sec
: d. 20,000 N/sec Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
: d. 20,000 N/sec Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics


QUESTION   A.08   [1.0 point]
QUESTION A.08 [1.0 point]
Which ONE of the following design characteristics is the reason for the decrease in reactivity following an increase in fuel temperature in a TRIGA reactor?
Which ONE of the following design characteristics is the reason for the decrease in reactivity following an increase in fuel temperature in a TRIGA reactor?
: a. Hexagonal fuel matrix
: a. Hexagonal fuel matrix
Line 339: Line 337:
: d. Long delay time for transferring heat to the core cooling water
: d. Long delay time for transferring heat to the core cooling water


QUESTION   A.09   [1.0 point]
QUESTION A.09 [1.0 point]
Several processes occur that may increase or decrease the available number of neutrons.
Several processes occur that may increase or decrease the available number of neutrons.
SELECT ONE of the following, six-factor formula term, that describes an INCREASE in the number of neutrons during the cycle.
SELECT ONE of the following, six-factor formula term, that describes an INCREASE in the number of neutrons during the cycle.
Line 347: Line 345:
: d. Thermal Non-Leakage Probability
: d. Thermal Non-Leakage Probability


QUESTION   A.10   [1.0 point]
QUESTION A.10 [1.0 point]
Which ONE of the following describes the difference between prompt and delayed neutrons?
Which ONE of the following describes the difference between prompt and delayed neutrons?
: a. Prompt neutrons are produced from spontaneous fission of U-235 in the fuel, and delayed neutrons are the result of fission in U-238.
: a. Prompt neutrons are produced from spontaneous fission of U-235 in the fuel, and delayed neutrons are the result of fission in U-238.
Line 353: Line 351:
: c. Prompt neutrons are responsible for the ability to control the rate at which power can rise in the reactor and delayed neutrons are responsible for the rate at which a reactor can be shut down.
: c. Prompt neutrons are responsible for the ability to control the rate at which power can rise in the reactor and delayed neutrons are responsible for the rate at which a reactor can be shut down.
: d. Prompt neutrons ensure there is a sufficient neutron population to overcome the effects of fission product poisoning following a shutdown and delayed neutrons are responsible for lengthening the neutron generation time to ensure the reactor does not go prompt critical.
: d. Prompt neutrons ensure there is a sufficient neutron population to overcome the effects of fission product poisoning following a shutdown and delayed neutrons are responsible for lengthening the neutron generation time to ensure the reactor does not go prompt critical.
Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics


QUESTION   A.11   [1.0 point]
QUESTION A.11 [1.0 point]
Which ONE of the following is the definition of Thermal Utilization Factor?
Which ONE of the following is the definition of Thermal Utilization Factor?
: a. The ratio of the number of fast neutrons absorbed in fuel to the number of fast neutrons absorbed in the reactor material.
: a. The ratio of the number of fast neutrons absorbed in fuel to the number of fast neutrons absorbed in the reactor material.
Line 362: Line 360:
: d. The ratio of the number of fast neutrons produced by thermal fission to the number of thermal neutrons absorbed in the fuel.
: d. The ratio of the number of fast neutrons produced by thermal fission to the number of thermal neutrons absorbed in the fuel.


QUESTION   A.12   [1.0 point]
QUESTION A.12 [1.0 point]
The following shows part of a decay chain for the radioactive element Pb-190:
The following shows part of a decay chain for the radioactive element Pb-190:


82Pb190               83Bi190. This decay chain is an example of _______ decay.
82Pb190 83Bi190. This decay chain is an example of _______ decay.
: a. Alpha
: a. Alpha
: b. Beta
: b. Beta
Line 371: Line 369:
: d. Neutron
: d. Neutron


QUESTION   A.13   [1.0 point]
QUESTION A.13 [1.0 point]
During reg rod calibration, doubling time was recorded to be 68 seconds. What was the reactor period?
During reg rod calibration, doubling time was recorded to be 68 seconds. What was the reactor period?
: a. 47 seconds
: a. 47 seconds
: b. 98 seconds
: b. 98 seconds
: c. 113 seconds
: c. 113 seconds
: d. 136 seconds Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
: d. 136 seconds Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics


QUESTION   A.14   [1.0 point]
QUESTION A.14 [1.0 point]
Which ONE of the following conditions will DECREASE the core excess reactivity of a reactor?
Which ONE of the following conditions will DECREASE the core excess reactivity of a reactor?
: a. Fuel depletion
: a. Fuel depletion
Line 385: Line 383:
: d. Lowering moderator temperature (assume a negative temperature coefficient)
: d. Lowering moderator temperature (assume a negative temperature coefficient)


QUESTION   A.15   [1.0 point]
QUESTION A.15 [1.0 point]
In a subcritical reactor, keff is increased from 0.885 to 0.943. Which ONE of the following is the amount of reactivity that was added to the core?
In a subcritical reactor, keff is increased from 0.885 to 0.943. Which ONE of the following is the amount of reactivity that was added to the core?
: a. 4.68 % k/k
: a. 4.68 % k/k
Line 392: Line 390:
: d. 7.45 % k/k
: d. 7.45 % k/k


QUESTION   A.16   [1.0 point]
QUESTION A.16 [1.0 point]
The count rate for a reactor is 100 cps. An operator inserts an experiment into the core, and the count rate decreases to 55 cps. Given the initial keff of the reactor was 0.95, what is the worth of the experiment?
The count rate for a reactor is 100 cps. An operator inserts an experiment into the core, and the count rate decreases to 55 cps. Given the initial keff of the reactor was 0.95, what is the worth of the experiment?
: a.   = - 0.02
: a. = - 0.02
: b.   = + 0.02
: b. = + 0.02
: c.   = - 0.05
: c. = - 0.05
: d.   = + 0.05
: d. = + 0.05


QUESTION   A.17   [1.0 point]
QUESTION A.17 [1.0 point]
Which ONE of the following is defined as the balance between production of neutrons and their absorption in the core for which core leakage can be neglected?
Which ONE of the following is defined as the balance between production of neutrons and their absorption in the core for which core leakage can be neglected?
: a. Utilization factor
: a. Utilization factor
: b. Reproduction factor
: b. Reproduction factor
: c. Infinite multiplication factor Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
: c. Infinite multiplication factor Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
: d. Effective multiplication factor
: d. Effective multiplication factor


QUESTION   A.18   [1.0 point]
QUESTION A.18 [1.0 point]
FAST FISSION FACTOR is defined as a ratio of which ONE of the following?
FAST FISSION FACTOR is defined as a ratio of which ONE of the following?
: a. The number of neutrons that reach thermal energy over the number of fast neutrons that start to slow down.
: a. The number of neutrons that reach thermal energy over the number of fast neutrons that start to slow down.
Line 413: Line 411:
: d. The number of fast neutrons produced from all fission over the number of fast neutrons produced from thermal fission.
: d. The number of fast neutrons produced from all fission over the number of fast neutrons produced from thermal fission.


QUESTION   A.19   [1.0 point]
QUESTION A.19 [1.0 point]
Which ONE of the following parameters is MOST significant in determining the differential rod worth of a control rod?
Which ONE of the following parameters is MOST significant in determining the differential rod worth of a control rod?
: a. Rod speed
: a. Rod speed
Line 420: Line 418:
: d. Fuel Temperature
: d. Fuel Temperature


QUESTION   A.20   [1.0 point]
QUESTION A.20 [1.0 point]
Which ONE of the following parameter changes will require control rod INSERTION to maintain constant power level following the change?
Which ONE of the following parameter changes will require control rod INSERTION to maintain constant power level following the change?
: a. Insertion of a void into the core
: a. Insertion of a void into the core
Line 430: Line 428:
Category B: Normal/Emergency Operating Procedures and Radiological Controls
Category B: Normal/Emergency Operating Procedures and Radiological Controls


QUESTION   B.01   [1.0 point, 0.25 each]
QUESTION B.01 [1.0 point, 0.25 each]
Fill out the blanks with the Limiting Conditions of Operation (LCO) listed in the UC-Davis McClellan Technical Specifications.
Fill out the blanks with the Limiting Conditions of Operation (LCO) listed in the UC-Davis McClellan Technical Specifications.


Safety System Parameter                                     LCO
Safety System Parameter LCO
: a. Excess Reactivity                               a. _____ $ (4.00/7.50/9.25)
: a. Excess Reactivity a. _____ $ (4.00/7.50/9.25)
: b. Shutdown Margin                                 b. _____ %k/k (0.25/0.35/0.75)
: b. Shutdown Margin b. _____ %k/k (0.25/0.35/0.75)
: c. Maximum Absolute Value of a Fixed               c. _____ $ (1.23/2.23/3.35)
: c. Maximum Absolute Value of a Fixed c. _____ $ (1.23/2.23/3.35)
Experiment Worth
Experiment Worth
: d. _____ MW (1.02/1.50/2.00)
: d. _____ MW (1.02/1.50/2.00)
: d. Maximum Steady State Power
: d. Maximum Steady State Power


QUESTION   B.02   [1.0 point]
QUESTION B.02 [1.0 point]
Which ONE of the following does the UC-Davis/McClellan NRC Director report directly to for the safe operation and maintenance of the facility?
Which ONE of the following does the UC-Davis/McClellan NRC Director report directly to for the safe operation and maintenance of the facility?
: a. UC-Davis/McClellan Nuclear Safety Committee
: a. UC-Davis/McClellan Nuclear Safety Committee
Line 448: Line 446:
: d. United States Nuclear Regulatory Commission
: d. United States Nuclear Regulatory Commission


QUESTION   B.03   [1.0 point]
QUESTION B.03 [1.0 point]
Which ONE of the following regulations states the UC-Davis/McClellan Requalification Program must be conducted for a continuous period not to exceed 24 months?
Which ONE of the following regulations states the UC-Davis/McClellan Requalification Program must be conducted for a continuous period not to exceed 24 months?
: a. 10 CFR 19
: a. 10 CFR 19
Line 455: Line 453:
: d. 10 CFR 55 Category B: Normal/Emergency Operating Procedures and Radiological Controls
: d. 10 CFR 55 Category B: Normal/Emergency Operating Procedures and Radiological Controls


QUESTION   B.04   [1.0 point]
QUESTION B.04 [1.0 point]
The Fuel Handling Checklist is required to be completed ________ any reactor storage pit fuel manipulation.
The Fuel Handling Checklist is required to be completed ________ any reactor storage pit fuel manipulation.
: a. at the end of
: a. at the end of
Line 462: Line 460:
: d. prior to the commencement of, and each day of
: d. prior to the commencement of, and each day of


QUESTION   B.05   [1.0 point]
QUESTION B.05 [1.0 point]
In accordance with 10 CFR 20, which ONE of the following correctly defines the total effective dose equivalent (TEDE)?
In accordance with 10 CFR 20, which ONE of the following correctly defines the total effective dose equivalent (TEDE)?
: a. The sum of the products of the weighting factors applicable to each of the body organs or tissues that are irradiated and the committed dose equivalent to these organs or tissues.
: a. The sum of the products of the weighting factors applicable to each of the body organs or tissues that are irradiated and the committed dose equivalent to these organs or tissues.
Line 469: Line 467:
: d. The sum of the products of the dose equivalent to the organ or tissue and the weighting factors applicable to each of the body organs or tissues that are irradiated.
: d. The sum of the products of the dose equivalent to the organ or tissue and the weighting factors applicable to each of the body organs or tissues that are irradiated.


QUESTION   B.06   [1.0 point]
QUESTION B.06 [1.0 point]
Which ONE of the following surveillances is classified as a Channel Test?
Which ONE of the following surveillances is classified as a Channel Test?
: a. Expose a detector to a check source to verify that it responds.
: a. Expose a detector to a check source to verify that it responds.
Line 477: Line 475:
Category B: Normal/Emergency Operating Procedures and Radiological Controls
Category B: Normal/Emergency Operating Procedures and Radiological Controls


QUESTION   B.07   [1.0 point]
QUESTION B.07 [1.0 point]
The radiation level from an unshielded source is 1 rem/hr. Using a 50 mm thick shield (made from various materials) reduces the radiation level to 625 mrem/hr.
The radiation level from an unshielded source is 1 rem/hr. Using a 50 mm thick shield (made from various materials) reduces the radiation level to 625 mrem/hr.
What is the approximate half-value layer (HVL) of the shielding for this source?
What is the approximate half-value layer (HVL) of the shielding for this source?
Line 486: Line 484:
: d. 80mm
: d. 80mm


QUESTION   B.08   [1.0 point]
QUESTION B.08 [1.0 point]
A sample reads 456 mrem/hr at a distance of 3 feet from the source. How far away from the source will the reading be 10 mrem/hr?
A sample reads 456 mrem/hr at a distance of 3 feet from the source. How far away from the source will the reading be 10 mrem/hr?
: a. 17 feet
: a. 17 feet
Line 493: Line 491:
: d. 65 feet
: d. 65 feet


QUESTION   B.09   [1.0 point]
QUESTION B.09 [1.0 point]
An experiment reading 82.00 mrem/hr was removed from the reactor. Four hours later, it reads 8.00 mrem/h. What is the half-life of the radioisotope in the experiment sample?
An experiment reading 82.00 mrem/hr was removed from the reactor. Four hours later, it reads 8.00 mrem/h. What is the half-life of the radioisotope in the experiment sample?
: a. 1.01 hr
: a. 1.01 hr
Line 500: Line 498:
: d. 2.12 hr
: d. 2.12 hr


QUESTION   B.10   [1.0 point, 0.33 each]
QUESTION B.10 [1.0 point, 0.33 each]
For each ONE of the following, identify the required surveillance frequency as MONTHLY, QUARTERLY, SEMI-ANNUAL, ANNUALLY. Answers may be used once, more than once, or not at all.
For each ONE of the following, identify the required surveillance frequency as MONTHLY, QUARTERLY, SEMI-ANNUAL, ANNUALLY. Answers may be used once, more than once, or not at all.
: a. Reactor tank conductivity
: a. Reactor tank conductivity
Line 506: Line 504:
: c. Excess reactivity Category B: Normal/Emergency Operating Procedures and Radiological Controls
: c. Excess reactivity Category B: Normal/Emergency Operating Procedures and Radiological Controls


QUESTION   B.11   [1.0 point]
QUESTION B.11 [1.0 point]
Which ONE of the following is normally designated as the Emergency Control Station (ESC)?
Which ONE of the following is normally designated as the Emergency Control Station (ESC)?
: a. Assembly area
: a. Assembly area
Line 513: Line 511:
: d. Facility Directors office
: d. Facility Directors office


QUESTION   B.12   [1.0 point]
QUESTION B.12 [1.0 point]
10 CFR Part ________ requires all applicants for a reactor operator or senior reactor operator license to submit NRC Form 396 and 398 to the US NRC before taking the examination.
10 CFR Part ________ requires all applicants for a reactor operator or senior reactor operator license to submit NRC Form 396 and 398 to the US NRC before taking the examination.
: a. 19
: a. 19
Line 520: Line 518:
: d. 55
: d. 55


QUESTION   B.13   [1.0 point]
QUESTION B.13 [1.0 point]
In accordance with UC-Davis McClellan NRC procedure, which ONE of the following actions is NOT a Class I Facility Modification?
In accordance with UC-Davis McClellan NRC procedure, which ONE of the following actions is NOT a Class I Facility Modification?
: a. NRC approval prior to installation.
: a. NRC approval prior to installation.
Line 527: Line 525:
: d. Change involves an unreviewed safety question affecting the Safety Analysis Report.
: d. Change involves an unreviewed safety question affecting the Safety Analysis Report.


QUESTION   B.14   [1.0 point]
QUESTION B.14 [1.0 point]
Which ONE of the following is classified as a Protective Action?
Which ONE of the following is classified as a Protective Action?
: a. Actions to correct and terminate an emergency.
: a. Actions to correct and terminate an emergency.
Line 535: Line 533:
Category B: Normal/Emergency Operating Procedures and Radiological Controls
Category B: Normal/Emergency Operating Procedures and Radiological Controls


QUESTION   B.15   [1.0 point, 0.33 each]
QUESTION B.15 [1.0 point, 0.33 each]
Match the Emergency Terms in Column A to the Emergency Definitions in Column B, according to the UC-Davis/McClellan Emergency Plan.
Match the Emergency Terms in Column A to the Emergency Definitions in Column B, according to the UC-Davis/McClellan Emergency Plan.


Column A                                         Column B
Column A Column B
: a. Assessment Actions                               1. Actions measures taken to correct and terminate an emergency.
: a. Assessment Actions 1. Actions measures taken to correct and terminate an emergency.
: b. Corrective Actions
: b. Corrective Actions
: 2. Actions taken after the emergency to
: 2. Actions taken after the emergency to
: c. Recovery Actions                                   restore   the   facility   to   its   pre-emergency condition.
: c. Recovery Actions restore the facility to its pre-emergency condition.
: 3. Actions taken during or after an emergency to obtain and process information necessary to implement specific emergency procedures.
: 3. Actions taken during or after an emergency to obtain and process information necessary to implement specific emergency procedures.


QUESTION   B.16   [1.0 point]
QUESTION B.16 [1.0 point]
Per UC-Davis/McClellan Technical Specifications, which ONE of the following events does NOT require the direction of a licensed Senior Reactor Operator at the facility?
Per UC-Davis/McClellan Technical Specifications, which ONE of the following events does NOT require the direction of a licensed Senior Reactor Operator at the facility?
: a. Recovery from an unscheduled shutdown
: a. Recovery from an unscheduled shutdown
Line 552: Line 550:
: d. Insertion of a movable experiment with a worth less than $1.00
: d. Insertion of a movable experiment with a worth less than $1.00


QUESTION   B.17   [1.0 point]
QUESTION B.17 [1.0 point]
Which ONE of the following is the MINIMUM number of required radiation monitoring systems to be classified as operable in accordance with UC-Davis/McClellan Technical Specifications?
Which ONE of the following is the MINIMUM number of required radiation monitoring systems to be classified as operable in accordance with UC-Davis/McClellan Technical Specifications?
: a. 1 Radiation Area Monitor (RAM) and 1 Continuous Air Monitor (CAM)
: a. 1 Radiation Area Monitor (RAM) and 1 Continuous Air Monitor (CAM)
Line 559: Line 557:
: d. 1 reactor RAM, 1 demin RAM, 1 reactor CAM, and 1 stack CAM Category C: Facility and Radiation Monitoring Systems
: d. 1 reactor RAM, 1 demin RAM, 1 reactor CAM, and 1 stack CAM Category C: Facility and Radiation Monitoring Systems


QUESTION   B.18   [1.0 point]
QUESTION B.18 [1.0 point]
Which ONE of the following surveillances is classified as a Channel Calibration?
Which ONE of the following surveillances is classified as a Channel Calibration?
: a. Adjust the wide range linear channel to match the recent data collected during a reactor power calibration.
: a. Adjust the wide range linear channel to match the recent data collected during a reactor power calibration.
Line 566: Line 564:
: d. Expose a detector to a check source to verify that it responds.
: d. Expose a detector to a check source to verify that it responds.


QUESTION   B.19   [1.0 point]
QUESTION B.19 [1.0 point]
Which ONE of the following is NOT part of the Radiation Work Permit (RWP) procedure?
Which ONE of the following is NOT part of the Radiation Work Permit (RWP) procedure?
: a. Worker shall fill out part I
: a. Worker shall fill out part I
Line 573: Line 571:
: d. SRO can make pen and ink changes to the RWP expiration date
: d. SRO can make pen and ink changes to the RWP expiration date


QUESTION   B.20   [1.0 point]
QUESTION B.20 [1.0 point]
Assume you are currently a licensed operator at UC-Davis/McClellan reactor. Which ONE of the following is a requirement of 10 CFR 55, Operators Licenses?
Assume you are currently a licensed operator at UC-Davis/McClellan reactor. Which ONE of the following is a requirement of 10 CFR 55, Operators Licenses?
: a. All licensed operators must pass an annual written requalification exam.
: a. All licensed operators must pass an annual written requalification exam.
Line 583: Line 581:
Category C: Facility and Radiation Monitoring Systems
Category C: Facility and Radiation Monitoring Systems


QUESTION   C.01   [1.0 point]
QUESTION C.01 [1.0 point]
Which ONE of the following performs all operational interlocks and safety trips required by UC-Davis/McClellan NRC Technical Specifications?
Which ONE of the following performs all operational interlocks and safety trips required by UC-Davis/McClellan NRC Technical Specifications?
: a. Reactor Safety System (RSS)
: a. Reactor Safety System (RSS)
Line 590: Line 588:
: d. Reactor Control and Monitoring System
: d. Reactor Control and Monitoring System


QUESTION   C.02   [1.0 point]
QUESTION C.02 [1.0 point]
Which ONE of the following is the poison section of the UC-Davis/McClellan NRC control rods?
Which ONE of the following is the poison section of the UC-Davis/McClellan NRC control rods?
: a. Steel
: a. Steel
Line 597: Line 595:
: d. Borated Graphite
: d. Borated Graphite


QUESTION   C.03   [1.0 point]
QUESTION C.03 [1.0 point]
What is the primary function of the graphite sections on both sides of the fuel element?
What is the primary function of the graphite sections on both sides of the fuel element?
: a. Absorb thermal neutrons
: a. Absorb thermal neutrons
Line 604: Line 602:
: d. Absorb fission product gases
: d. Absorb fission product gases


QUESTION   C.04   [1.0 point]
QUESTION C.04 [1.0 point]
Which ONE of the following outputs is provided by the Wide Range detector?
Which ONE of the following outputs is provided by the Wide Range detector?
: a. Fuel Temperature
: a. Fuel Temperature
Line 611: Line 609:
: d. Linear power output of 0 - 120 percent power Category C: Facility and Radiation Monitoring Systems
: d. Linear power output of 0 - 120 percent power Category C: Facility and Radiation Monitoring Systems


QUESTION   C.05   [1.0 point]
QUESTION C.05 [1.0 point]
Which ONE of the following produces significant quantities of Nitrogen-16 in the reactor pool?
Which ONE of the following produces significant quantities of Nitrogen-16 in the reactor pool?
: a. Argon - 41
: a. Argon - 41
Line 618: Line 616:
: d. Iodine - 131
: d. Iodine - 131


QUESTION   C.06   [1.0 point]
QUESTION C.06 [1.0 point]
Which ONE of the following records is NOT required to be kept for the lifetime of the facility?
Which ONE of the following records is NOT required to be kept for the lifetime of the facility?
: a. Offsite environmental surveys
: a. Offsite environmental surveys
Line 625: Line 623:
: d. Radiation exposures for all personnel
: d. Radiation exposures for all personnel


QUESTION   C.07   [1.0 point]
QUESTION C.07 [1.0 point]
Which ONE of the following is NOT included in the key features of the reactor scram devices in the radiography bays?
Which ONE of the following is NOT included in the key features of the reactor scram devices in the radiography bays?
: a. Once activated, the rip cord circuit can only be reset from inside the bay
: a. Once activated, the rip cord circuit can only be reset from inside the bay
Line 632: Line 630:
: d. The reactor is either scrammed or cannot be operated if the massive shutter and the bay door is open Category C: Facility and Radiation Monitoring Systems
: d. The reactor is either scrammed or cannot be operated if the massive shutter and the bay door is open Category C: Facility and Radiation Monitoring Systems


QUESTION   C.08   [1.0 point]
QUESTION C.08 [1.0 point]
Which ONE of the following receives power from the Uninterruptible Power Supply (UPS), in the event of a loss of building power?
Which ONE of the following receives power from the Uninterruptible Power Supply (UPS), in the event of a loss of building power?
: a. Emergency lights only
: a. Emergency lights only
Line 639: Line 637:
: d. Reactor instrumentation and control system and radiation monitoring equipment
: d. Reactor instrumentation and control system and radiation monitoring equipment


QUESTION   C.09   [1.0 point]
QUESTION C.09 [1.0 point]
Which ONE of the following outputs is provided by the NPP-1000?
Which ONE of the following outputs is provided by the NPP-1000?
: a. Fuel temperature
: a. Fuel temperature
Line 646: Line 644:
: d. Linear power output of 0 - 120 percent power
: d. Linear power output of 0 - 120 percent power


QUESTION   C.10   [1.0 point]
QUESTION C.10 [1.0 point]
Which ONE of the following is the annual average concentration of Argon-41 discharged into the unrestricted area SHALL NOT EXCEED?
Which ONE of the following is the annual average concentration of Argon-41 discharged into the unrestricted area SHALL NOT EXCEED?
: a. 1 x 10 -6 µCi/ml
: a. 1 x 10 -6 µCi/ml
Line 653: Line 651:
: d. 1 x 10 -9 µCi/ml
: d. 1 x 10 -9 µCi/ml


QUESTION   C.11   [1.0 point]
QUESTION C.11 [1.0 point]
What is the main purpose of the fuel followers in the control rods?
What is the main purpose of the fuel followers in the control rods?
: a. Decrease the fast neutron flux in the core
: a. Decrease the fast neutron flux in the core
Line 660: Line 658:
: d. Increase the core excess reactivity in the reactor core Category C: Facility and Radiation Monitoring Systems
: d. Increase the core excess reactivity in the reactor core Category C: Facility and Radiation Monitoring Systems


QUESTION   C.12   [1.0 point]
QUESTION C.12 [1.0 point]
Which ONE of the following indicates the cleanest pool water?
Which ONE of the following indicates the cleanest pool water?
: a. Lowest pH
: a. Lowest pH
Line 667: Line 665:
: d. Highest conductivity
: d. Highest conductivity


QUESTION   C.13   [1.0 point]
QUESTION C.13 [1.0 point]
All fuel elements shall be stored in a geometrical array where the keff is less than ________ for all conditions of moderation.
All fuel elements shall be stored in a geometrical array where the keff is less than ________ for all conditions of moderation.
: a. 0.8
: a. 0.8
Line 674: Line 672:
: d. 1.1
: d. 1.1


QUESTION   C.14   [1.0 point]
QUESTION C.14 [1.0 point]
Which ONE of the following is the primary isotope of concern in air? Note: A neutron flux will activate isotopes in air.
Which ONE of the following is the primary isotope of concern in air? Note: A neutron flux will activate isotopes in air.
: a. H2 (H1 (n, ) H             2)
: a. H2 (H1 (n, ) H 2)
: b. N16 (O16 (n,p) N16)
: b. N16 (O16 (n,p) N16)
: c. Kr80 (Kr79 (n, ) Kr             80)
: c. Kr80 (Kr79 (n, ) Kr 80)
: d. Ar41 (Ar40 (n, ) Ar             41)
: d. Ar41 (Ar40 (n, ) Ar 41)


QUESTION   C.15   [1.0 point]
QUESTION C.15 [1.0 point]
In which region of the output signal versus applied voltage curve does a fission chamber operate?
In which region of the output signal versus applied voltage curve does a fission chamber operate?
: a. Ion Chamber
: a. Ion Chamber
Line 688: Line 686:
: d. Limited Proportional Category C: Facility and Radiation Monitoring Systems
: d. Limited Proportional Category C: Facility and Radiation Monitoring Systems


QUESTION   C.16   [1.0 point]
QUESTION C.16 [1.0 point]
What is the MINIMUM required ventilation system required for reactor operations?
What is the MINIMUM required ventilation system required for reactor operations?
: a. AC-1
: a. AC-1
Line 695: Line 693:
: d. EF-2
: d. EF-2


QUESTION   C.17   [1.0 point]
QUESTION C.17 [1.0 point]
Which ONE of the following is used in the pneumatic transfer system to move a rabbit sample between the terminus and receiver?
Which ONE of the following is used in the pneumatic transfer system to move a rabbit sample between the terminus and receiver?
: a. N16
: a. N16
Line 702: Line 700:
: d. Air
: d. Air


QUESTION   C.18   [1.0 point]
QUESTION C.18 [1.0 point]
In accordance with UC-Davis/McClellan Technical Specifications, which ONE of the following is the MAXIMUM amount of fueled experiments are limited to of Sr-90?
In accordance with UC-Davis/McClellan Technical Specifications, which ONE of the following is the MAXIMUM amount of fueled experiments are limited to of Sr-90?
: a. 1 microcurie
: a. 1 microcurie
Line 709: Line 707:
: d. 5 millicurie
: d. 5 millicurie


QUESTION   C.19   [1.0 point]
QUESTION C.19 [1.0 point]
What is the reactor power response when you try to withdraw SHIM 1 rod while the reactor is operating in the AUTO MODE with REG and SHIM 1 rods selected?
What is the reactor power response when you try to withdraw SHIM 1 rod while the reactor is operating in the AUTO MODE with REG and SHIM 1 rods selected?
: a. scram
: a. scram
Line 716: Line 714:
: d. stays the same Category C: Facility and Radiation Monitoring Systems
: d. stays the same Category C: Facility and Radiation Monitoring Systems


QUESTION   C.20   [1.0 point]
QUESTION C.20 [1.0 point]
What is the color of the rod on the high-resolution screen, for a control rod, given the following conditions: magnet up, magnet down and rod down limit switches are all open (off)?
What is the color of the rod on the high-resolution screen, for a control rod, given the following conditions: magnet up, magnet down and rod down limit switches are all open (off)?
: a. black
: a. black
: b. green
: b. green
Line 725: Line 723:
(***** END OF CATEGORY C *****)
(***** END OF CATEGORY C *****)
(******** END OF EXAMINATION ********)
(******** END OF EXAMINATION ********)
Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics


A.01 Answer:         d.
A.01 Answer: d.


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, 1982, Section 3.2
Burn, R., Introduction to Nuclear Reactor Operations, 1982, Section 3.2


A.02 Answer:         c.
A.02 Answer: c.


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, 1982, page 4-21
Burn, R., Introduction to Nuclear Reactor Operations, 1982, page 4-21


A.03 Answer:         a. Alpha; b. Positron; c. Neutron; d. Alpha (0.25 each)
A.03 Answer: a. Alpha; b. Positron; c. Neutron; d. Alpha (0.25 each)


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, 1982, Section 1.3.1
Burn, R., Introduction to Nuclear Reactor Operations, 1982, Section 1.3.1


A.04 Answer:         d.
A.04 Answer: d.


==Reference:==
==Reference:==
NRC DELETED QUESTION, MISSING INFORMATION
NRC DELETED QUESTION, MISSING INFORMATION


A.05 Answer:         b.
A.05 Answer: b.


==Reference:==
==Reference:==
DOE Fundamentals of Reactor Theory, Volume 2, NP-04, page 11
DOE Fundamentals of Reactor Theory, Volume 2, NP-04, page 11


A.06 Answer:         b.
A.06 Answer: b.


==Reference:==
==Reference:==
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 18
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 18


A.07 Answer:         b.
A.07 Answer: b.


==Reference:==
==Reference:==
CR = S/(1-K) CR = 1000/(1 - 0.8) = 5000 N/sec
CR = S/(1-K) CR = 1000/(1 - 0.8) = 5000 N/sec


A.08 Answer:         c.
A.08 Answer: c.


==Reference:==
==Reference:==
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 21
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 21


A.09 Answer:         a.
A.09 Answer: a.


==Reference:==
==Reference:==
Burns, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3
Burns, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3


A.10 Answer:         b.
A.10 Answer: b.


==Reference:==
==Reference:==
DOE Fundamentals of Reactor Theory, Volume 1, page 29
DOE Fundamentals of Reactor Theory, Volume 1, page 29


A.11 Answer:         c.
A.11 Answer: c.


==Reference:==
==Reference:==
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 4
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 4


A.12 Answer:         b.
A.12 Answer: b.


==Reference:==
==Reference:==
Chart of the Nuclides Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
Chart of the Nuclides Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics


A.13 Answer:         b.
A.13 Answer: b.


==Reference:==
==Reference:==
T=DT/ln(2) = 68 seconds/0.693 = 98.124 or 98 seconds
T=DT/ln(2) = 68 seconds/0.693 = 98.124 or 98 seconds


A.14 Answer:         a.
A.14 Answer: a.


==Reference:==
==Reference:==
Decreasing the reactivity worth in the core will decrease the core excess
Decreasing the reactivity worth in the core will decrease the core excess


A.15 Answer:         c.
A.15 Answer: c.


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3.4
Burn, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3.4
                = (k     eff1 - keff2) / (keff1
= (k eff1 - keff2) / (keff1
* keff2) = (0.943 - 0.885) / (0.943
* keff2) = (0.943 - 0.885) / (0.943
* 0.885) 0.0694 k/k = 6.94%k/k
* 0.885) 0.0694 k/k = 6.94%k/k


Answer:         c.
Answer: c.


==Reference:==
==Reference:==
CR1/CR2 = (1-keff2)/(1-keff1); Solve for keff2, 100/55 = (1- keff2) / 1 - 0.95, therefore keff2 = 0.91; = (k                           eff2 - keff1) / (keff2 x keff1), (0.91 - 0.95) / (0.91 x 0.95) = - 0.046
CR1/CR2 = (1-keff2)/(1-keff1); Solve for keff2, 100/55 = (1-keff2) / 1 - 0.95, therefore keff2 = 0.91; = (k eff2 - keff1) / (keff2 x keff1), (0.91 - 0.95) / (0.91 x 0.95) = - 0.046


A.17 Answer:         c.
A.17 Answer: c.


==Reference:==
==Reference:==
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 2
DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 2


A.18 Answer:         d.
A.18 Answer: d.


==Reference:==
==Reference:==
Burn, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3.1, page 3-16
Burn, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3.1, page 3-16


A.19 Answer:         b.
A.19 Answer: b.


==Reference:==
==Reference:==
Burn, Introduction to Nuclear Reactor Operations, Section 7, page 7-4
Burn, Introduction to Nuclear Reactor Operations, Section 7, page 7-4


A.20 Answer:         d.
A.20 Answer: d.


==Reference:==
==Reference:==
Line 833: Line 831:
Category B: Normal/Emergency Operating Procedures and Radiological Controls
Category B: Normal/Emergency Operating Procedures and Radiological Controls


B.01 Answer:         a. 7.50; b. 0.35; c. 1.75;   d. 1.02     (0.25 each)
B.01 Answer: a. 7.50; b. 0.35; c. 1.75; d. 1.02 (0.25 each)


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 3.1.1, 3.1.2, and 3.1.3
UC-Davis/McClellan Technical Specifications 3.1.1, 3.1.2, and 3.1.3


B.02 Answer:         b.
B.02 Answer: b.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specification 6.1
UC-Davis/McClellan Technical Specification 6.1


B.03 Answer:         d.
B.03 Answer: d.


==Reference:==
==Reference:==
10 CFR Part 55.59(a)(1)
10 CFR Part 55.59(a)(1)


B.04 Answer:         d.
B.04 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan SOP, Fuel Handling Tool, Section 2.2.1
UC-Davis/McClellan SOP, Fuel Handling Tool, Section 2.2.1


B.05 Answer:         b.
B.05 Answer: b.


==Reference:==
==Reference:==
10 CFR Part 20.1003
10 CFR Part 20.1003


B.06 Answer:         a.
B.06 Answer: a.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 1.3
UC-Davis/McClellan Technical Specifications 1.3


B.07 Answer:         c.
B.07 Answer: c.


==Reference:==
==Reference:==
DR = DR0 e-x (625) = (1000) e-(50mm); -ln (0.625) = (50mm); = 0.0094 mm                                                               -1 (500) = (1000) e-(0.0094)x; -ln (0.5) = (0.0094 mm-1)x; x= 73.739 mm or ~74 mm
DR = DR0 e-x (625) = (1000) e-(50mm); -ln (0.625) = (50mm); = 0.0094 mm -1 (500) = (1000) e-(0.0094)x; -ln (0.5) = (0.0094 mm-1)x; x= 73.739 mm or ~74 mm


B.08 Answer:         b.
B.08 Answer: b.


==Reference:==
==Reference:==
Line 874: Line 872:
456 mrem*(3)2 = 10 mrem(d)2; 4104/10 = d2 = 410.4 d = 20.26 feet
456 mrem*(3)2 = 10 mrem(d)2; 4104/10 = d2 = 410.4 d = 20.26 feet


B.09 Answer:         b.
B.09 Answer: b.


==Reference:==
==Reference:==
DR=DR0e(-t)             T1/2=0.693/
DR=DR0e(-t) T1/2=0.693/
DR = DR0 e-.693/T1/2 8 = 82 e-(.693)(4)/T1/2 0.0923 = e-(2.772)/T1/2 ln(0.0976) = ln(e-(2.772)/T1/2)
DR = DR0 e-.693/T1/2 8 = 82 e-(.693)(4)/T1/2 0.0923 = e-(2.772)/T1/2 ln(0.0976) = ln(e-(2.772)/T1/2)
              -2.327 = -2.772 / T1/2 T1/2 = -2.772 / -2.327 T1/2 = 1.19 hr
-2.327 = -2.772 / T1/2 T1/2 = -2.772 / -2.327 T1/2 = 1.19 hr


B.10 Answer:         a. Monthly; b. Semi-annual; c. Annually; (0.33 each)
B.10 Answer: a. Monthly; b. Semi-annual; c. Annually; (0.33 each)


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 4.1.1, 4.2.1, and 4.3 Category B: Normal/Emergency Operating Procedures and Radiological Controls
UC-Davis/McClellan Technical Specifications 4.1.1, 4.2.1, and 4.3 Category B: Normal/Emergency Operating Procedures and Radiological Controls


B.11 Answer:         c.
B.11 Answer: c.


==Reference:==
==Reference:==
UC Davis/McClellan Emergency Plan, Definitions 2.0
UC Davis/McClellan Emergency Plan, Definitions 2.0


B.12 Answer:         d.
B.12 Answer: d.


==Reference:==
==Reference:==
10 CFR Part 55
10 CFR Part 55


B.13 Answer:         b.
B.13 Answer: b.


==Reference:==
==Reference:==
UC-Davis/McClellan Facility Modification Procedure, Section 4
UC-Davis/McClellan Facility Modification Procedure, Section 4


B.14 Answer:         d.
B.14 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan Emergency Plan, Section 2
UC-Davis/McClellan Emergency Plan, Section 2


B.15 Answer:         a. 3; b. 1; c. 2
B.15 Answer: a. 3; b. 1; c. 2


==Reference:==
==Reference:==
UC-Davis/McClellan Emergency Plan, Section 2
UC-Davis/McClellan Emergency Plan, Section 2


B.16 Answer:         d.
B.16 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 6.1.3
UC-Davis/McClellan Technical Specifications 6.1.3


B.17 Answer:         d.
B.17 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications Table 3-4
UC-Davis/McClellan Technical Specifications Table 3-4


B.18 Answer:         a.
B.18 Answer: a.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 1.3
UC-Davis/McClellan Technical Specifications 1.3


B.19 Answer:         d.
B.19 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan NRC Radiation Safety Procedures, Section 18, Radiation Work Permit Procedure
UC-Davis/McClellan NRC Radiation Safety Procedures, Section 18, Radiation Work Permit Procedure


B.20 Answer:         b.
B.20 Answer: b.


==Reference:==
==Reference:==
Line 937: Line 935:


(***** END OF CATEGORY B *****)
(***** END OF CATEGORY B *****)
C.01 Answer:         a.
C.01 Answer: a.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 1.23
UC-Davis/McClellan Technical Specifications 1.23


C.02 Answer:         d.
C.02 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 5.3.3.a
UC-Davis/McClellan Technical Specifications 5.3.3.a


C.03 Answer:         c.
C.03 Answer: c.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 5.3.2.a, NRC Standard Question
UC-Davis/McClellan Technical Specifications 5.3.2.a, NRC Standard Question


C.04 Answer:         b.
C.04 Answer: b.


==Reference:==
==Reference:==
UC-Davis/McClellan SAR 7.1.2.1
UC-Davis/McClellan SAR 7.1.2.1


C.05 Answer:         c.
C.05 Answer: c.


==Reference:==
==Reference:==
NRC standard question
NRC standard question


C.06 Answer:         c.
C.06 Answer: c.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 6.8
UC-Davis/McClellan Technical Specifications 6.8


C.07 Answer:         b.
C.07 Answer: b.


==Reference:==
==Reference:==
UC-Davis/McClellan SAR Chapter 9, Section 6 Interlocks/Controls - Bay Shutters/Doors
UC-Davis/McClellan SAR Chapter 9, Section 6 Interlocks/Controls - Bay Shutters/Doors


C.08 Answer:         d.
C.08 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan NRC SAR 8.2
UC-Davis/McClellan NRC SAR 8.2


C.09 Answer:         d.
C.09 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan NRC SAR 7.1.2.1
UC-Davis/McClellan NRC SAR 7.1.2.1


C.10 Answer:         c.
C.10 Answer: c.


==Reference:==
==Reference:==
UC-Davis/McClellan NRC SAR 8.2
UC-Davis/McClellan NRC SAR 8.2


C.11 Answer:         d.
C.11 Answer: d.


==Reference:==
==Reference:==
NRC standard question
NRC standard question


C.12 Answer:         c.
C.12 Answer: c.


==Reference:==
==Reference:==
Line 999: Line 997:
Enclosure 1 Category B: Normal/Emergency Operating Procedures and Radiological Controls
Enclosure 1 Category B: Normal/Emergency Operating Procedures and Radiological Controls


C.13 Answer:         b.
C.13 Answer: b.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 5.4
UC-Davis/McClellan Technical Specifications 5.4


C.14 Answer:         d.
C.14 Answer: d.


==Reference:==
==Reference:==
NRC standard question
NRC standard question


C.15 Answer:         b.
C.15 Answer: b.


==Reference:==
==Reference:==
NRC standard question
NRC standard question


C.16 Answer:         c.
C.16 Answer: c.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications
UC-Davis/McClellan Technical Specifications


C.17 Answer:         d.
C.17 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan NRC SAR 10.4.4
UC-Davis/McClellan NRC SAR 10.4.4


C.18 Answer:         d.
C.18 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan Technical Specifications 3.8.2
UC-Davis/McClellan Technical Specifications 3.8.2


C.19 Answer:         d.
C.19 Answer: d.


==Reference:==
==Reference:==
UC-Davis/McClellan NRC Operating Instruction, Section 4.3
UC-Davis/McClellan NRC Operating Instruction, Section 4.3


C.20 Answer:         b.
C.20 Answer: b.


==Reference:==
==Reference:==

Latest revision as of 15:08, 5 October 2024

Examination Report Letter No. 50-607/OL-24-01, University of California - Davis
ML24052A070
Person / Time
Site: University of California-Davis
Issue date: 05/20/2024
From: Travis Tate
NRC/NRR/DANU/UNPO
To: Frey W
McClellan Nuclear Research Center
References
50-607/OL-24-01 OL-24-01
Download: ML24052A070 (33)


Text

Dr. Wesley Frey, Facility Director McClellan Nuclear Research Center University of California, Davis 5535 Price Avenue McClellan, CA 95652

SUBJECT:

EXAMINATION REPORT NO. 50-607/OL-24-01, UNIVERSITY OF CALIFORNIA-DAVIS

Dear Dr. Frey:

During the week of April 29. 2024, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your University of California-Davis reactor.

The examinations were conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2. Examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report at the conclusion of the examination.

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Michele DeSouza at 301-415-0747 or via email at Michele.DeSouza@nrc.gov.

Sincerely, Travis L. Tate, Chief Non-Power Production and Utilization Facility Oversight Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-607

Enclosures:

1. Examination Report No. 50-607/OL-24-01
2. Written examination cc: w/enclosures to GovDelivery SubscribersMay 20, 2024 Signed by Tate, Travis on 05/20/24

ML24052A070 NRR-079 OFFICE NRR/DANU/UNPO/CE NRR/DANU/UNPO/OLA NRR/DANU/UNPO/BC NAME MDeSouza NJones TTate DATE 5/20/2024 5/20/2024 5/20/2024 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT

REPORT NO.: 50-607/OL-24-01

FACILITY DOCKET NO.: 50-607

FACILITY LICENSE NO.: R-130

FACILITY: University of California - Davis/McClellan Reactor

EXAMINATION DATES: April 30, 2024

SUBMITTED BY: ________ 05/01/2024 Michele C. DeSouza, Chief Examiner Date

SUMMARY

During the week of April 30, 2024, the NRC administered operator licensing examinations to one Reactor Operator (RO) candidate. The candidate passed all applicable portions of the examinations and tests.

REPORT DETAILS

1. Examiner: Michele C. DeSouza, Chief Examiner, NRC
2. Results:

RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL

Written 1/0 NA 1/0

Operating Tests 1/0 NA 1/0

Overall 1/0 NA 1/0

3. Exit Meeting:

Wesley Frey, Reactor Director, University of California - Davis/McClellan Reactor Michele C. DeSouza, Chief Examiner, NRC

Prior to administration of the written examination, based on facility comments, adjustments were accepted. Comments provided corrections and additional clarity to questions/answers and identified where changes were appropriate based on current facility conditions.

Upon completion of all operator licensing examinations, the NRC examiner met with facility staff representatives to discuss the results. At the conclusion of the meeting, the NRC examiner thanked the facility for their support in the administration of the examination.

Enclosure 1 University of California-Davis

Operator Licensing Examination

Week of April 29, 2024 U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR LICENSE EXAMINATION

FACILITY: University of California-Davis

REACTOR TYPE: TRIGA

DATE ADMINISTERED: April 29, 2024

CANDIDATE: _______________________

INSTRUCTIONS TO CANDIDATE:

Answers are to be written on the Answer sheet provided. Attach all Answer sheets to the examination. Point values are indicated in parentheses for each question. A 70% in each category is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.

% OF CATEGORY % OF CANDIDATE'S CATEGORY VALUE TOTAL SCORE VALUE CATEGORY

19.00 33.3 A. REACTOR THEORY, THERMODYNAMICS AND FACILITY OPERATING CHARACTERISTICS

20.00 33.3 B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS

20.00 33.3 C. FACILITY AND RADIATION MONITORING SYSTEMS

59.00 % TOTALS FINAL GRADE

All work done on this examination is my own. I have neither given nor received aid.

Candidate's Signature

NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:

1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
4. Use black ink or dark pencil only to facilitate legible reproductions.
5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each Answer sheet.
6. Mark your Answers on the Answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
7. The point value for each question is indicated in [brackets] after the question.
8. If the intent of a question is unclear, ask questions of the examiner only.
9. When turning in your examination, assemble the completed examination with examination questions, examination aids and Answer sheets. In addition turn in all scrap paper.
10. Ensure all information you wish to have evaluated as part of your Answer is on your Answer sheet. Scrap paper will be disposed of immediately following the examination.
11. To pass the examination you must achieve a grade of 70 percent or greater in each category and an overall grade of 70 percent or greater.
12. There is a time limit of three (3) hours for completion of the examination.

Category A: Reactor Theory, Thermodynamics, & Facility Operating Characteristics

A N S W E R S H E E T

Multiple Choice (Circle or X your choice)

If you change your answer, write your selection in the blank.

A01 a b c d _____

A02 a b c d _____

A03 a __________ b __________ c __________ d __________ (0.25 each)

A04 a b c d _____ NRC DELETED QUESTION, MISSING INFORMATION

A05 a b c d _____

A06 a b c d _____

A07 a b c d _____

A08 a b c d _____

A09 a b c d _____

A10 a b c d _____

A11 a b c d _____

A12 a b c d _____

A13 a b c d _____

A14 a b c d _____

A15 a b c d _____

A16 a b c d _____

A17 a b c d _____

A18 a b c d _____

A19 a b c d _____

A20 a b c d _____

(***** END OF CATEGORY A *****)

Category B: Normal/Emergency Operating Procedures and Radiological Controls

A N S W E R S H E E T

Multiple Choice (Circle or X your choice)

If you change your answer, write your selection in the blank.

B01 a __________ b __________ c __________ d __________ (0.25 each)

B02 a b c d _____

B03 a b c d _____

B04 a b c d _____

B05 a b c d _____

B06 a b c d _____

B07 a b c d _____

B08 a b c d _____

B09 a b c d _____

B10 a __________ b __________ c __________ (0.33 each)

B11 a b c d _____

B12 a b c d _____

B13 a b c d _____

B14 a b c d _____

B15 a __________ b __________ c __________ (0.33 each)

B16 a b c d _____

B17 a b c d _____

B18 a b c d _____

B19 a b c d _____

B20 a b c d _____

(***** END OF CATEGORY B *****)

Category C: Facility and Radiation Monitoring Systems

A N S W E R S H E E T

Multiple Choice (Circle or X your choice)

If you change your answer, write your selection in the blank.

C01 a b c d _____

C02 a b c d _____

C03 a b c d _____

C04 a b c d _____

C05 a b c d _____

C06 a b c d _____

C07 a b c d _____

C08 a b c d _____

C09 a b c d _____

C10 a b c d _____

C11 a b c d _____

C12 a b c d _____

C13 a b c d _____

C14 a b c d _____

C15 a b c d _____

C16 a b c d _____

C17 a b c d _____

C18 a b c d _____

C19 a b c d _____

C20 a b c d _____

(***** END OF CATEGORY C *****)

(********** END OF EXAMINATION **********)

EQUATION SHEET

2 0.1sec1 QmcPTmH UAT Pmax 2 eff

t S S

eff CR1 1CR22 CR 1K CR 1K SUR 26.06 1 eff1 2 eff2

1 M 1 CR2 P P 10SUR(t)

P P0 1 K CR 0 eff 1

1 Keff1 1 K

eff2 Keff

= + 0.693 K K eff2 eff1 T1 2 K K eff1eff2

Keff1 DR DR et 2 2 K 0 DR1 d1 DR2d2 eff

6CiE n 2 2 DR 2 1 R2 Peak2 Peak1

1 Curie = 3.7 x 1010 dis/sec 1 kg = 2.21 lb 1 Horsepower = 2.54 x 103 BTU/hr 1 Mw = 3.41 x 106 BTU/hr

1 BTU = 778 ft-lb °F = 9/5 °C + 32 1 gal (H2O) 8 lb °C = 5/9 (°F - 32) cP = 1.0 BTU/hr/lb/°F cp = 1 cal/sec/gm/°C Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics

QUESTION A.01 [1.0 point]

Which ONE of the following is how delayed neutrons are produced?

a. Directly from fission
b. Photoelectric effect
c. Decay of Nitrogen-16
d. Decay of fission fragments

QUESTION A.02 [1.0 point]

Which ONE of the following describes the term PROMPT DROP?

a. Reactor is subcritical at negative 80-second period
b. Reactor has attained criticality on prompt neutrons alone
c. Instantaneous change in power level due to inserting a control rod
d. Instantaneous change in power level due to withdrawing a control rod

QUESTION A.03 [1.0 point, 0.25 each]

Replace X with the type of primary decay necessary (Alpha, Positron, Gamma or Neutron emission) to produce the following reactions. Choices may be used once, more than once, or not at all.

a. 92U238 90Th234 + X
b. 83Bi203 82Pb203 + X
c. 2He4 + 4Be9 6C12 + X
d. 84Po210 82Pb206 + X

QUESTION A.04 [1.0 point] NRC DELETED QUESTION, MISSING INFORMATION In a reactor, at 50-watt power, adding 1.0% k/k worth of reactivity will cause which ONE of the following?

a. 22.9 kW
b. 14.8 kW
c. 4.91 kW
d. 1.31 kW Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics

QUESTION A.05 [1.0 point]

If reactor period is ________, then reactor power is ________.

a. Positive, stable
b. Negative, stable
c. Positive, increasing
d. Negative, increasing

QUESTION A.06 [1.0 point]

Which ONE of the following describes the relationship between reactivity and criticality?

a. The smaller the absolute value of reactivity in the core, the further the reactor is from criticality.
b. The larger the absolute value of reactivity in the core, the further the reactor is from criticality.
c. Reactivity is zero when the reactor is critical, reactivity is negative when the reactor is supercritical.
d. Reactivity is zero when the reactor is critical, reactivity is positive when the reactor is subcritical.

QUESTION A.07 [1.0 point]

Which ONE of the following is the expected stable neutron count rate, given a source strength of 1000 Neutrons/second and a multiplication factor of 0.8?

a. 700 N/sec
b. 5000 N/sec
c. 10,000 N/sec
d. 20,000 N/sec Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics

QUESTION A.08 [1.0 point]

Which ONE of the following design characteristics is the reason for the decrease in reactivity following an increase in fuel temperature in a TRIGA reactor?

a. Hexagonal fuel matrix
b. High fuel element reactivity worth
c. Negative temperature coefficient
d. Long delay time for transferring heat to the core cooling water

QUESTION A.09 [1.0 point]

Several processes occur that may increase or decrease the available number of neutrons.

SELECT ONE of the following, six-factor formula term, that describes an INCREASE in the number of neutrons during the cycle.

a. Reproduction Factor
b. Thermal Utilization Factor
c. Resonance Escape Probability
d. Thermal Non-Leakage Probability

QUESTION A.10 [1.0 point]

Which ONE of the following describes the difference between prompt and delayed neutrons?

a. Prompt neutrons are produced from spontaneous fission of U-235 in the fuel, and delayed neutrons are the result of fission in U-238.
b. Prompt neutrons are produced immediately and directly from the fission event and delayed neutrons are produced immediately following the first beta decay of fission fragments.
c. Prompt neutrons are responsible for the ability to control the rate at which power can rise in the reactor and delayed neutrons are responsible for the rate at which a reactor can be shut down.
d. Prompt neutrons ensure there is a sufficient neutron population to overcome the effects of fission product poisoning following a shutdown and delayed neutrons are responsible for lengthening the neutron generation time to ensure the reactor does not go prompt critical.

Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics

QUESTION A.11 [1.0 point]

Which ONE of the following is the definition of Thermal Utilization Factor?

a. The ratio of the number of fast neutrons absorbed in fuel to the number of fast neutrons absorbed in the reactor material.
b. The ratio of the number of fast neutrons produced by thermal fission to the number of thermal neutrons absorbed in the fuel.
c. The ratio of the number of thermal neutrons absorbed in fuel to the number of thermal neutrons absorbed in the reactor material.
d. The ratio of the number of fast neutrons produced by thermal fission to the number of thermal neutrons absorbed in the fuel.

QUESTION A.12 [1.0 point]

The following shows part of a decay chain for the radioactive element Pb-190:

82Pb190 83Bi190. This decay chain is an example of _______ decay.

a. Alpha
b. Beta
c. Gamma
d. Neutron

QUESTION A.13 [1.0 point]

During reg rod calibration, doubling time was recorded to be 68 seconds. What was the reactor period?

a. 47 seconds
b. 98 seconds
c. 113 seconds
d. 136 seconds Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics

QUESTION A.14 [1.0 point]

Which ONE of the following conditions will DECREASE the core excess reactivity of a reactor?

a. Fuel depletion
b. Burnout of a burnable poison
c. Insertion of a positive reactivity worth experiment
d. Lowering moderator temperature (assume a negative temperature coefficient)

QUESTION A.15 [1.0 point]

In a subcritical reactor, keff is increased from 0.885 to 0.943. Which ONE of the following is the amount of reactivity that was added to the core?

a. 4.68 % k/k
b. 5.58 % k/k
c. 6.94 % k/k
d. 7.45 % k/k

QUESTION A.16 [1.0 point]

The count rate for a reactor is 100 cps. An operator inserts an experiment into the core, and the count rate decreases to 55 cps. Given the initial keff of the reactor was 0.95, what is the worth of the experiment?

a. = - 0.02
b. = + 0.02
c. = - 0.05
d. = + 0.05

QUESTION A.17 [1.0 point]

Which ONE of the following is defined as the balance between production of neutrons and their absorption in the core for which core leakage can be neglected?

a. Utilization factor
b. Reproduction factor
c. Infinite multiplication factor Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics
d. Effective multiplication factor

QUESTION A.18 [1.0 point]

FAST FISSION FACTOR is defined as a ratio of which ONE of the following?

a. The number of neutrons that reach thermal energy over the number of fast neutrons that start to slow down.
b. The number of fast neutrons produced from fission in a generation over the number of fast neutrons produced from fission in the previous generation.
c. The number of fast neutrons produced from U-238 over the number of thermal neutrons produced from U-235.
d. The number of fast neutrons produced from all fission over the number of fast neutrons produced from thermal fission.

QUESTION A.19 [1.0 point]

Which ONE of the following parameters is MOST significant in determining the differential rod worth of a control rod?

a. Rod speed
b. Flux shape
c. Reactor power
d. Fuel Temperature

QUESTION A.20 [1.0 point]

Which ONE of the following parameter changes will require control rod INSERTION to maintain constant power level following the change?

a. Insertion of a void into the core
b. Buildup of Samarium in the core
c. Increase in coolant water temperature (assume a negative temperature coefficient)
d. Removal of an experiment containing cadmium

(***** END OF CATEGORY A *****)

Category B: Normal/Emergency Operating Procedures and Radiological Controls

QUESTION B.01 [1.0 point, 0.25 each]

Fill out the blanks with the Limiting Conditions of Operation (LCO) listed in the UC-Davis McClellan Technical Specifications.

Safety System Parameter LCO

a. Excess Reactivity a. _____ $ (4.00/7.50/9.25)
b. Shutdown Margin b. _____ %k/k (0.25/0.35/0.75)
c. Maximum Absolute Value of a Fixed c. _____ $ (1.23/2.23/3.35)

Experiment Worth

d. _____ MW (1.02/1.50/2.00)
d. Maximum Steady State Power

QUESTION B.02 [1.0 point]

Which ONE of the following does the UC-Davis/McClellan NRC Director report directly to for the safe operation and maintenance of the facility?

a. UC-Davis/McClellan Nuclear Safety Committee
b. UC-Davis/McClellan Vice Chancellor for Research
c. UC-Davis/McClellan President
d. United States Nuclear Regulatory Commission

QUESTION B.03 [1.0 point]

Which ONE of the following regulations states the UC-Davis/McClellan Requalification Program must be conducted for a continuous period not to exceed 24 months?

a. 10 CFR 19
b. 10 CFR 20
c. 10 CFR 50
d. 10 CFR 55 Category B: Normal/Emergency Operating Procedures and Radiological Controls

QUESTION B.04 [1.0 point]

The Fuel Handling Checklist is required to be completed ________ any reactor storage pit fuel manipulation.

a. at the end of
b. at the beginning of
c. at least a week before
d. prior to the commencement of, and each day of

QUESTION B.05 [1.0 point]

In accordance with 10 CFR 20, which ONE of the following correctly defines the total effective dose equivalent (TEDE)?

a. The sum of the products of the weighting factors applicable to each of the body organs or tissues that are irradiated and the committed dose equivalent to these organs or tissues.
b. The sum of the effective dose equivalent (for external exposures) and the committed effective dose equivalent (for internal exposures).
c. The concentration of a given radionuclide in air which, if breathed by the reference man for a working year of 2,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> under conditions of light work, results in an intake of one ALI.
d. The sum of the products of the dose equivalent to the organ or tissue and the weighting factors applicable to each of the body organs or tissues that are irradiated.

QUESTION B.06 [1.0 point]

Which ONE of the following surveillances is classified as a Channel Test?

a. Expose a detector to a check source to verify that it responds.
b. Verification of the log channel performance requirements by observation.
c. Compare the prestart readings of the radiation area monitors to the previous day readings
d. Adjust the wide range linear channel in accordance with recent data collected during a reactor power calibration.

Category B: Normal/Emergency Operating Procedures and Radiological Controls

QUESTION B.07 [1.0 point]

The radiation level from an unshielded source is 1 rem/hr. Using a 50 mm thick shield (made from various materials) reduces the radiation level to 625 mrem/hr.

What is the approximate half-value layer (HVL) of the shielding for this source?

(HVL: thickness of shielding required to reduce the original source intensity by half)

a. 64mm
b. 70mm
c. 74mm
d. 80mm

QUESTION B.08 [1.0 point]

A sample reads 456 mrem/hr at a distance of 3 feet from the source. How far away from the source will the reading be 10 mrem/hr?

a. 17 feet
b. 20 feet
c. 34 feet
d. 65 feet

QUESTION B.09 [1.0 point]

An experiment reading 82.00 mrem/hr was removed from the reactor. Four hours later, it reads 8.00 mrem/h. What is the half-life of the radioisotope in the experiment sample?

a. 1.01 hr
b. 1.19 hr
c. 1.55 hr
d. 2.12 hr

QUESTION B.10 [1.0 point, 0.33 each]

For each ONE of the following, identify the required surveillance frequency as MONTHLY, QUARTERLY, SEMI-ANNUAL, ANNUALLY. Answers may be used once, more than once, or not at all.

a. Reactor tank conductivity
b. Control rod scram time
c. Excess reactivity Category B: Normal/Emergency Operating Procedures and Radiological Controls

QUESTION B.11 [1.0 point]

Which ONE of the following is normally designated as the Emergency Control Station (ESC)?

a. Assembly area
b. Staging area 1
c. Reactor control room
d. Facility Directors office

QUESTION B.12 [1.0 point]

10 CFR Part ________ requires all applicants for a reactor operator or senior reactor operator license to submit NRC Form 396 and 398 to the US NRC before taking the examination.

a. 19
b. 20
c. 50
d. 55

QUESTION B.13 [1.0 point]

In accordance with UC-Davis McClellan NRC procedure, which ONE of the following actions is NOT a Class I Facility Modification?

a. NRC approval prior to installation.
b. Change out of the neutron irradiation facility.
c. Modification involves a change in Technical Specifications.
d. Change involves an unreviewed safety question affecting the Safety Analysis Report.

QUESTION B.14 [1.0 point]

Which ONE of the following is classified as a Protective Action?

a. Actions to correct and terminate an emergency.
b. Actions taken after an emergency to restore the facility to its pre-emergency condition.
c. Actions taken during or after an emergency to obtain and process information which is necessary to make decisions to implement specific emergency procedures.
d. Actions taken in anticipation of an uncontrolled release of radioactive material, after an uncontrolled release has occurred, or to prevent or minimize personnel radiation doses that would occur if the actions were not taken.

Category B: Normal/Emergency Operating Procedures and Radiological Controls

QUESTION B.15 [1.0 point, 0.33 each]

Match the Emergency Terms in Column A to the Emergency Definitions in Column B, according to the UC-Davis/McClellan Emergency Plan.

Column A Column B

a. Assessment Actions 1. Actions measures taken to correct and terminate an emergency.
b. Corrective Actions
2. Actions taken after the emergency to
c. Recovery Actions restore the facility to its pre-emergency condition.
3. Actions taken during or after an emergency to obtain and process information necessary to implement specific emergency procedures.

QUESTION B.16 [1.0 point]

Per UC-Davis/McClellan Technical Specifications, which ONE of the following events does NOT require the direction of a licensed Senior Reactor Operator at the facility?

a. Recovery from an unscheduled shutdown
b. Initial reactor startup and approach to power
c. Relocation of control rods within the reactor core
d. Insertion of a movable experiment with a worth less than $1.00

QUESTION B.17 [1.0 point]

Which ONE of the following is the MINIMUM number of required radiation monitoring systems to be classified as operable in accordance with UC-Davis/McClellan Technical Specifications?

a. 1 Radiation Area Monitor (RAM) and 1 Continuous Air Monitor (CAM)
b. 1 reactor RAM, 1 demin RAM, and 1 stack particulate
c. 1 demin RAM, 1 reactor CAM, and 1 stack CAM
d. 1 reactor RAM, 1 demin RAM, 1 reactor CAM, and 1 stack CAM Category C: Facility and Radiation Monitoring Systems

QUESTION B.18 [1.0 point]

Which ONE of the following surveillances is classified as a Channel Calibration?

a. Adjust the wide range linear channel to match the recent data collected during a reactor power calibration.
b. Compare the prestart readings of the radiation area monitors to the previous day readings.
c. Verification of the log channel performance requirements by observation.
d. Expose a detector to a check source to verify that it responds.

QUESTION B.19 [1.0 point]

Which ONE of the following is NOT part of the Radiation Work Permit (RWP) procedure?

a. Worker shall fill out part I
b. SRO approve in the absence of the RSO
c. RSO shall assign an RWP number and fill out part II
d. SRO can make pen and ink changes to the RWP expiration date

QUESTION B.20 [1.0 point]

Assume you are currently a licensed operator at UC-Davis/McClellan reactor. Which ONE of the following is a requirement of 10 CFR 55, Operators Licenses?

a. All licensed operators must pass an annual written requalification exam.
b. All licensed operators must successfully complete a continuous requalification program, not to exceed 24 months.
c. All licensed operators must actively perform the functions of an operator or senior operator for a minimum of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> per quarter to maintain active status.
d. All licensed operators must have a medical examination by a physician every 3 years.

(***** END OF CATEGORY B *****)

Category C: Facility and Radiation Monitoring Systems

QUESTION C.01 [1.0 point]

Which ONE of the following performs all operational interlocks and safety trips required by UC-Davis/McClellan NRC Technical Specifications?

a. Reactor Safety System (RSS)
b. Digital Control Computer - Z (DCC-Z)
c. Digital Control Computer - X (DCC-X)
d. Reactor Control and Monitoring System

QUESTION C.02 [1.0 point]

Which ONE of the following is the poison section of the UC-Davis/McClellan NRC control rods?

a. Steel
b. Argon
c. Aluminum
d. Borated Graphite

QUESTION C.03 [1.0 point]

What is the primary function of the graphite sections on both sides of the fuel element?

a. Absorb thermal neutrons
b. Increases fast neutron flux
c. Reduces neutron leakage
d. Absorb fission product gases

QUESTION C.04 [1.0 point]

Which ONE of the following outputs is provided by the Wide Range detector?

a. Fuel Temperature
b. Power rate of change (period)
c. Pulse power output of 0 - 2000 MW
d. Linear power output of 0 - 120 percent power Category C: Facility and Radiation Monitoring Systems

QUESTION C.05 [1.0 point]

Which ONE of the following produces significant quantities of Nitrogen-16 in the reactor pool?

a. Argon - 41
b. Cobalt - 60
c. Oxygen - 16
d. Iodine - 131

QUESTION C.06 [1.0 point]

Which ONE of the following records is NOT required to be kept for the lifetime of the facility?

a. Offsite environmental surveys
b. Drawings of the reactor facility
c. Principal maintenance activities
d. Radiation exposures for all personnel

QUESTION C.07 [1.0 point]

Which ONE of the following is NOT included in the key features of the reactor scram devices in the radiography bays?

a. Once activated, the rip cord circuit can only be reset from inside the bay
b. The reactor is either scrammed or cannot be operated if the fast shutter and the bay door is open
c. The reactor is either scrammed or cannot be operated when the rip cord circuits have been activated
d. The reactor is either scrammed or cannot be operated if the massive shutter and the bay door is open Category C: Facility and Radiation Monitoring Systems

QUESTION C.08 [1.0 point]

Which ONE of the following receives power from the Uninterruptible Power Supply (UPS), in the event of a loss of building power?

a. Emergency lights only
b. All major components for safe reactor shutdown
c. AMUWS demineralizer pump, EF-1 fan motor and temperature control panel (TCP)
d. Reactor instrumentation and control system and radiation monitoring equipment

QUESTION C.09 [1.0 point]

Which ONE of the following outputs is provided by the NPP-1000?

a. Fuel temperature
b. Power rate of change (period)
c. Pulse power output of 0 - 2000 MW
d. Linear power output of 0 - 120 percent power

QUESTION C.10 [1.0 point]

Which ONE of the following is the annual average concentration of Argon-41 discharged into the unrestricted area SHALL NOT EXCEED?

a. 1 x 10 -6 µCi/ml
b. 1 x 10 -7 µCi/ml
c. 1 x 10 -8 µCi/ml
d. 1 x 10 -9 µCi/ml

QUESTION C.11 [1.0 point]

What is the main purpose of the fuel followers in the control rods?

a. Decrease the fast neutron flux in the core
b. Increase the effectiveness for reactor pulsing
c. Decrease the thermal neutron flux in the core
d. Increase the core excess reactivity in the reactor core Category C: Facility and Radiation Monitoring Systems

QUESTION C.12 [1.0 point]

Which ONE of the following indicates the cleanest pool water?

a. Lowest pH
b. Highest pH
c. Highest resistivity
d. Highest conductivity

QUESTION C.13 [1.0 point]

All fuel elements shall be stored in a geometrical array where the keff is less than ________ for all conditions of moderation.

a. 0.8
b. 0.9
c. 1.0
d. 1.1

QUESTION C.14 [1.0 point]

Which ONE of the following is the primary isotope of concern in air? Note: A neutron flux will activate isotopes in air.

a. H2 (H1 (n, ) H 2)
b. N16 (O16 (n,p) N16)
c. Kr80 (Kr79 (n, ) Kr 80)
d. Ar41 (Ar40 (n, ) Ar 41)

QUESTION C.15 [1.0 point]

In which region of the output signal versus applied voltage curve does a fission chamber operate?

a. Ion Chamber
b. Proportional
c. Geiger-Mueller
d. Limited Proportional Category C: Facility and Radiation Monitoring Systems

QUESTION C.16 [1.0 point]

What is the MINIMUM required ventilation system required for reactor operations?

a. AC-1
b. AC-2
c. EF-1
d. EF-2

QUESTION C.17 [1.0 point]

Which ONE of the following is used in the pneumatic transfer system to move a rabbit sample between the terminus and receiver?

a. N16
b. Kr80
c. CO2
d. Air

QUESTION C.18 [1.0 point]

In accordance with UC-Davis/McClellan Technical Specifications, which ONE of the following is the MAXIMUM amount of fueled experiments are limited to of Sr-90?

a. 1 microcurie
b. 5 microcurie
c. 1 curie
d. 5 millicurie

QUESTION C.19 [1.0 point]

What is the reactor power response when you try to withdraw SHIM 1 rod while the reactor is operating in the AUTO MODE with REG and SHIM 1 rods selected?

a. scram
b. increases
c. decreases
d. stays the same Category C: Facility and Radiation Monitoring Systems

QUESTION C.20 [1.0 point]

What is the color of the rod on the high-resolution screen, for a control rod, given the following conditions: magnet up, magnet down and rod down limit switches are all open (off)?

a. black
b. green
c. yellow
d. magenta

(***** END OF CATEGORY C *****)

(******** END OF EXAMINATION ********)

Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics

A.01 Answer: d.

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, 1982, Section 3.2

A.02 Answer: c.

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, 1982, page 4-21

A.03 Answer: a. Alpha; b. Positron; c. Neutron; d. Alpha (0.25 each)

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, 1982, Section 1.3.1

A.04 Answer: d.

Reference:

NRC DELETED QUESTION, MISSING INFORMATION

A.05 Answer: b.

Reference:

DOE Fundamentals of Reactor Theory, Volume 2, NP-04, page 11

A.06 Answer: b.

Reference:

DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 18

A.07 Answer: b.

Reference:

CR = S/(1-K) CR = 1000/(1 - 0.8) = 5000 N/sec

A.08 Answer: c.

Reference:

DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 21

A.09 Answer: a.

Reference:

Burns, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3

A.10 Answer: b.

Reference:

DOE Fundamentals of Reactor Theory, Volume 1, page 29

A.11 Answer: c.

Reference:

DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 4

A.12 Answer: b.

Reference:

Chart of the Nuclides Category A: Reactor Theory, Thermodynamics, and Facility Operating Characteristics

A.13 Answer: b.

Reference:

T=DT/ln(2) = 68 seconds/0.693 = 98.124 or 98 seconds

A.14 Answer: a.

Reference:

Decreasing the reactivity worth in the core will decrease the core excess

A.15 Answer: c.

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3.4

= (k eff1 - keff2) / (keff1

  • keff2) = (0.943 - 0.885) / (0.943
  • 0.885) 0.0694 k/k = 6.94%k/k

Answer: c.

Reference:

CR1/CR2 = (1-keff2)/(1-keff1); Solve for keff2, 100/55 = (1-keff2) / 1 - 0.95, therefore keff2 = 0.91; = (k eff2 - keff1) / (keff2 x keff1), (0.91 - 0.95) / (0.91 x 0.95) = - 0.046

A.17 Answer: c.

Reference:

DOE Fundamentals of Reactor Theory, Volume 2, NP-03, page 2

A.18 Answer: d.

Reference:

Burn, R., Introduction to Nuclear Reactor Operations, 1988, Section 3.3.1, page 3-16

A.19 Answer: b.

Reference:

Burn, Introduction to Nuclear Reactor Operations, Section 7, page 7-4

A.20 Answer: d.

Reference:

DOE Fundamentals of Reactor Theory, Volume 2, NP-04, page 30-31

(***** END OF CATEGORY A *****)

Category B: Normal/Emergency Operating Procedures and Radiological Controls

B.01 Answer: a. 7.50; b. 0.35; c. 1.75; d. 1.02 (0.25 each)

Reference:

UC-Davis/McClellan Technical Specifications 3.1.1, 3.1.2, and 3.1.3

B.02 Answer: b.

Reference:

UC-Davis/McClellan Technical Specification 6.1

B.03 Answer: d.

Reference:

10 CFR Part 55.59(a)(1)

B.04 Answer: d.

Reference:

UC-Davis/McClellan SOP, Fuel Handling Tool, Section 2.2.1

B.05 Answer: b.

Reference:

10 CFR Part 20.1003

B.06 Answer: a.

Reference:

UC-Davis/McClellan Technical Specifications 1.3

B.07 Answer: c.

Reference:

DR = DR0 e-x (625) = (1000) e-(50mm); -ln (0.625) = (50mm); = 0.0094 mm -1 (500) = (1000) e-(0.0094)x; -ln (0.5) = (0.0094 mm-1)x; x= 73.739 mm or ~74 mm

B.08 Answer: b.

Reference:

DR1*(D1)2 = DR2*(D2)2 ;

456 mrem*(3)2 = 10 mrem(d)2; 4104/10 = d2 = 410.4 d = 20.26 feet

B.09 Answer: b.

Reference:

DR=DR0e(-t) T1/2=0.693/

DR = DR0 e-.693/T1/2 8 = 82 e-(.693)(4)/T1/2 0.0923 = e-(2.772)/T1/2 ln(0.0976) = ln(e-(2.772)/T1/2)

-2.327 = -2.772 / T1/2 T1/2 = -2.772 / -2.327 T1/2 = 1.19 hr

B.10 Answer: a. Monthly; b. Semi-annual; c. Annually; (0.33 each)

Reference:

UC-Davis/McClellan Technical Specifications 4.1.1, 4.2.1, and 4.3 Category B: Normal/Emergency Operating Procedures and Radiological Controls

B.11 Answer: c.

Reference:

UC Davis/McClellan Emergency Plan, Definitions 2.0

B.12 Answer: d.

Reference:

10 CFR Part 55

B.13 Answer: b.

Reference:

UC-Davis/McClellan Facility Modification Procedure, Section 4

B.14 Answer: d.

Reference:

UC-Davis/McClellan Emergency Plan, Section 2

B.15 Answer: a. 3; b. 1; c. 2

Reference:

UC-Davis/McClellan Emergency Plan, Section 2

B.16 Answer: d.

Reference:

UC-Davis/McClellan Technical Specifications 6.1.3

B.17 Answer: d.

Reference:

UC-Davis/McClellan Technical Specifications Table 3-4

B.18 Answer: a.

Reference:

UC-Davis/McClellan Technical Specifications 1.3

B.19 Answer: d.

Reference:

UC-Davis/McClellan NRC Radiation Safety Procedures, Section 18, Radiation Work Permit Procedure

B.20 Answer: b.

Reference:

10 CFR Part 55

(***** END OF CATEGORY B *****)

C.01 Answer: a.

Reference:

UC-Davis/McClellan Technical Specifications 1.23

C.02 Answer: d.

Reference:

UC-Davis/McClellan Technical Specifications 5.3.3.a

C.03 Answer: c.

Reference:

UC-Davis/McClellan Technical Specifications 5.3.2.a, NRC Standard Question

C.04 Answer: b.

Reference:

UC-Davis/McClellan SAR 7.1.2.1

C.05 Answer: c.

Reference:

NRC standard question

C.06 Answer: c.

Reference:

UC-Davis/McClellan Technical Specifications 6.8

C.07 Answer: b.

Reference:

UC-Davis/McClellan SAR Chapter 9, Section 6 Interlocks/Controls - Bay Shutters/Doors

C.08 Answer: d.

Reference:

UC-Davis/McClellan NRC SAR 8.2

C.09 Answer: d.

Reference:

UC-Davis/McClellan NRC SAR 7.1.2.1

C.10 Answer: c.

Reference:

UC-Davis/McClellan NRC SAR 8.2

C.11 Answer: d.

Reference:

NRC standard question

C.12 Answer: c.

Reference:

NRC standard question

Enclosure 1 Category B: Normal/Emergency Operating Procedures and Radiological Controls

C.13 Answer: b.

Reference:

UC-Davis/McClellan Technical Specifications 5.4

C.14 Answer: d.

Reference:

NRC standard question

C.15 Answer: b.

Reference:

NRC standard question

C.16 Answer: c.

Reference:

UC-Davis/McClellan Technical Specifications

C.17 Answer: d.

Reference:

UC-Davis/McClellan NRC SAR 10.4.4

C.18 Answer: d.

Reference:

UC-Davis/McClellan Technical Specifications 3.8.2

C.19 Answer: d.

Reference:

UC-Davis/McClellan NRC Operating Instruction, Section 4.3

C.20 Answer: b.

Reference:

UC-Davis/McClellan NRC SAR 7.3.2

(***** END OF CATEGORY C *****)

(******** END OF EXAMINATION ********)