ML24093A066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED                     STATES NUCLEAR                               REGULATORY                                           COMMISSION WASHINGTON,                       D.C   . 20555 April                         16,                         1981
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 April 16, 1981


OFFICE       OF   THE SECRETARY
OFFICE OF THE SECRETARY


The                 Honorable                               John                   F.                       Clancy,                                     Jr.
The Honorable John F. Clancy, Jr.
Director Committee                                   Management                                     Secretari~t National                             Archives                                 and                   Records                             Service Washington,                                                             DC                                                                                                                                             20408
Director Committee Management Secretari~t National Archives and Records Service Washington, DC 20408


==Dear                   Mr.                           Clancy:==
==Dear Mr. Clancy:==
 
In accordance with Section 7(b) of the Federal Advisory Committee Act (P.L. 92-463), and the guidance referred to in your memorandum of February 25, 1981, the Nuclear Regulatory Commission hereby submits its annual comprehensive review of advisory committees in existence on December 31, 1980.
In                 accordance                                 with                   Section                             7(b)                             of                 the                 Federal                           Advisory Committee                                   Act                           (P.L.                                 92-463),                                       and                   the                 guidance                               referred                               to                 in your                     memorandum                                     of               February                                 25,                       1981,                             the                 Nuclear                           Regulatory Commission                                     hereby                           submits                               its               annual                           comprehensive                                               review                           of advisory                                   committees                                         in             existence                               on                 December                                 31,                         1980.


Sincerely,
Sincerely,


on                                               .                         Hyle Advisory                                   Committee Management                                   Officer
on. Hyle Advisory Committee Management Officer


==Enclosures:==
==Enclosures:==
: 1.                                               SF                   292                     and                   Justification Statement                                   for                 Advisory Committee                                   on                 Reactor Safeguards
: 1. SF 292 and Justification Statement for Advisory Committee on Reactor Safeguards
: 2.                                                 SF                   292                   and                 Justification Statement                                   for                   Screening Committee                                     for                   Lawyer Vacancies                                 on                 the                   Licensing Board                     Panel
: 2. SF 292 and Justification Statement for Screening Committee for Lawyer Vacancies on the Licensing Board Panel
: 3.                                                 SF                   292                     and                 Justification Statement                                   for                   Screening Committee                                       for                   Technical Vacancies                                 on                 the                 Licensing Board                     Panel
: 3. SF 292 and Justification Statement for Screening Committee for Technical Vacancies on the Licensing Board Panel
: 4.                                                 SF                   292                   for                 Advisory                                   Committee en                 the               Medical                             Uses                     of Isotopes
: 4. SF 292 for Advisory Committee en the Medical Uses of Isotopes
: 5.                                             SF                 292                     for                 Advisory                                   Panel for                   the                 Decontamination                                                 of Three                     Mile                       Island,                                 Unit                         2 INTERAGENCY                   REPORTS         CONTROL ANNUAL                                     COMt .     . cHENSIVE                                 REVIEW                                                                                                                                                                                                                                                                                       NUMBER
: 5. SF 292 for Advisory Panel for the Decontamination of Three Mile Island, Unit 2 INTERAGENCY REPORTS CONTROL ANNUAL COMt.. cHENSIVE REVIEW NUMBER


OF     FEDERAL             ADVISORY                                 COMMITTEE                                                                                                                                                                                                                                                                                                                                                                             0264-GSA-AN
OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN


INSTRUCTIONS                           :     Complete     one                   form           for each                 committee               in             existence .at frie e*nd         -of     -t:hec       alendar           year               be         ing           reported:   ffaadifional         space             is required, attach         a       separate sheet of   paper   and                   c     ite appropriate   item number                                     (_   sJ   . __ _
INSTRUCTIONS : Complete one form for each committee in existence.at frie e*nd -of -t:hec alendar year be ing reported: ffaadifional space is required, attach a separate sheet of paper and c ite appropriate item number (_ sJ. __ _
: 1. DEPARTMENT               OR     AGENCY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 2   . CALENDAR                 YEAR U.                           S.                     Nuclear                 Regulatory                               Commission                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 1980
: 1. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U. S. Nuclear Regulatory Commission 1980
: 3. NAME     OF   COMMITTEE           (and                 1ubcommittee,                               If appropriate)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               4     . DATE     ESTABLISHED             OR     LAST REESTABLISHEC                 OR     RENEWED (mo,t               recent)
: 3. NAME OF COMMITTEE (and 1ubcommittee, If appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHEC OR RENEWED (mo,t recent)
Advisory                         Committee         on                   Reactor                 Safeguards                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     December           l 980
Advisory Committee on Reactor Safeguards December l 980
: 5.       MEETING               EXEMPTIONS               -                           For         closed   or         partially                 closed     meet ings       ,   list for each           -   meeting the-*date and                     number(s                             ) 6ralrGover'nmentm the Sunshine             Act     (5       U.S.C           .           552b)             exemptions                     used.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         - *. -                                   --*
: 5. MEETING EXEMPTIONS - For closed or partially closed meet ings, list for each - meeting the-*date and number(s ) 6ralrGover'nmentm the Sunshine Act (5 U.S.C. 552b) exemptions used. - *. - --*
DATE     OF   MEETING                                                                                                                       NUMBER(S)                     OF   EXEMPTIONS           USED                                                                                                                     DATE     OF   MEETING                                                                                                                       NUMBER(S)                     OF     EXEMPTIONS     USED
DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED
: a.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 e.
: a. e.
b   .                                                                                                                                                                                                                                                                                                                                                                                                           SEE                   ATH CHMENT             "l II                                                                                                                                                                                                                                                                                                                                 f.
b. SEE ATH CHMENT "l II f.
: c.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         g.
: c. g.


d   .                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           h .
d. h.
6   . ESTABLISHMENT                 AUTHORITY                           FOR     COMMITTEE           (Mark             "   X"         in         appropriate           box)
6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark " X" in appropriate box)
                                                              ~             a.     Specifically       directed by                 law                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       D c     . Agency                     authority 0         b.         Author           ized by                   law                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 0       d. Presidential directive
~ a. Specifically directed by law D c. Agency authority 0 b. Author ized by law 0 d. Presidential directive
: 7. AGENCY             RECOMMENDATION                     FOR     COMMITTEE           (Mark             "X"           in appropriate                   box)
: 7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" in appropriate box)
D a     . Term       inate                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Li b         . Continue
D a. Term inate Li b. Continue
: 8. IF   ITEMS     6(a)             ANO     7(a)             ARE     MARKED,         ANSWER                 THE     FOLLOWING                     QUESTIONS                     :
: 8. IF ITEMS 6(a) ANO 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS :
YES                                                           NO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     YES                                                 NO
YES NO YES NO
: a.                   Is   legislation required to terminate?   .. ...   ..   .. .........     .. ... ....   . ..... 1-----4----l                                                                                                 c     .       Is such             legislation pending?               .....   .. ......   ... .. . ..... . ..........     . 1----+---t b         . Is such             legislation contemplated?                                 .. . ... .... ..   ..   ..   ...   ...........       .... .                                                                                                                                                                                                                                                                                                                                               d . Has     such             legislation been                 enacted?                 ........   . ..........     .. ... .
: a. Is legislation required to terminate?................................. 1-----4----l c. Is such legislation pending?.................................... 1----+---t b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................
9   . IF~ ANSWER                   IN     ITEM     8(a)           THROUGH                       (d)       IS   MARKED       "NO",     PROVIDE                       A       BRIEF       EXPLANATION
9. IF~ ANSWER IN ITEM 8(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION
: 10.     IF   THE       ANSWER                   TO       ITEM 8(c         ) OR           (d)         IS MARKED         "YES",             PROVIDE                   THE     FOLLOW                 I NG       INFORMATION
: 10. IF THE ANSWER TO ITEM 8(c ) OR (d) IS MARKED "YES", PROVIDE THE FOLLOW I NG INFORMATION
: a. BILL   OR     PUBLIC                   LAW             NUMBER                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       b.         PROPOSED         OR     EFFECTIVE                     DATE
: a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE


-                   11. IF   ITEM     6(b)               OR   6(CrANO     71af                           12. IF   ITEMS     6(d)     AND   7(a)             ARE     MARKED,         PROVIDE                     A       BRIEF       EXPLANATION ARE     MARKED,         PROvi'DETHE PROPOSED           OR     EFFECTIVE DATE
- 11. IF ITEM 6(b) OR 6(CrANO 71af 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROvi'DETHE PROPOSED OR EFFECTIVE DATE
: 13.     IF   ITEM       7(b)         IS     MARKED,         ATTACH         A     JUSTIFICATION                         STATEMENT         TO   THIS       FORM       USING                 NUMBERED                     BONO   SHEETS       WITH               ITEMS       l, 2, ANO     3 ON   EACH     SHEET.             THE   JUSTIFICATION                         SHOULD:                                                                                                                                           SEE                   ATTACHMENT         2
: 13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BONO SHEETS WITH ITEMS l, 2, ANO 3 ON EACH SHEET. THE JUSTIFICATION SHOULD: SEE ATTACHMENT 2
: a.                 Describe how                   the committee           accomplishes         (i:s-purpose. *
: a. Describe how the committee accomplishes (i:s-purpose. *
: b.             State why                   there is a         compelling       need         for the committee.
: b. State why there is a compelling need for the committee.


c     . Describe the balance                         of   membership         in terms of points of view represented and                   functions                 performed.
c. Describe the balance of membership in terms of points of view represented and functions performed.


d . Describe the frequency                     of meetings and                 the relevance   to     continuing                             the committee.
d. Describe the frequency of meetings and the relevance to continuing the committee.
: e. Describe the effect of committee           reports, advice,   or     recommendations                                                   oo                     agency                           operatiom:-                               -
: e. Describe the effect of committee reports, advice, or recommendations oo agency operatiom:- -
: f.         Explain         why                   the advice   or     information                     cannot                                         be           obtained                   from       other sources.
: f. Explain why the advice or information cannot be obtained from other sources.
: g. Explain           any                         duplication           of effort with other committees,     within the age     *ncy,                     or   with other agencies.
: g. Explain any duplication of effort with other committees, within the age *ncy, or with other agencies.


h . Describe the relationship of the cost   of the committee         to the advice or     information                     provided.
h. Describe the relationship of the cost of the committee to the advice or information provided.


GENERAL       SERVICES               ADMINISTRATION                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             STANDARD               FORM     292   (12-110) Prescribed     by                 GSA FPMR       101-<<i.10
GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-110) Prescribed by GSA FPMR 101-<<i.10
* I                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       r'\\
* I r'\\
USNRC                 -                             Advisory                         Committee         on                   Reactor                 Safeguards                           -                                 1980
USNRC - Advisory Committee on Reactor Safeguards - 1980


I.                                                   EXEMPTIONS             USED                     FOR                     PARTLY                   CLOSED                 FULL                     ACRS                       MEETINGS               HELD                     DURING               CY-1980 Subsection                       lO(d),                             Public                           Law                   92-463,                   5           U. S   ~C.               552b(c)--
I. EXEMPTIONS USED FOR PARTLY CLOSED FULL ACRS MEETINGS HELD DURING CY-1980 Subsection lO(d), Public Law 92-463, 5 U. S ~C. 552b(c)--


( 4)                                                                       To                   protect                         proprietary                                       information
( 4) To protect proprietary information


( 6)                                                                       To                   protect                           information,                                       the                 release                         of               which             would           constitute a           clearly                               unwarranted                   invasion                         of                 personal                         privacy.
( 6) To protect information, the release of which would constitute a clearly unwarranted invasion of personal privacy.
(9)                                 (B)                                                                                                           To                   protect                           information,                                         the                   premature                 disclosure                               of             which             would agency           action.
(9) (B) To protect information, the premature disclosure of which would agency action.
* be               likely                           to               significantly                                       frustrate                                     implementation                     of               proposed
* be likely to significantly frustrate implementation of proposed


Full                         ACRS                 Meetings                 -                                     (12) open.                                                   The                 remaining                     nine                   were             primarily                                         open           except                   for                 short                     sessions Three         of           the                   twelve                   full                                   ACRS               meetings                           held                 during                         CY-80             were           completely which           were             closed                         under               the                 exemptions                 indicated                                           below:
Full ACRS Meetings - (12) open. The remaining nine were primarily open except for short sessions Three of the twelve full ACRS meetings held during CY-80 were completely which were closed under the exemptions indicated below:
Full                         ACRS                   Meetings               with                   Some                     Closed           Sessions ill                                                           ill                                                                     (9)                               (B)
Full ACRS Meetings with Some Closed Sessions ill ill (9) (B)
: l.                                               Jan         .                 10-12                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       X                                                                                                                                                                             X
: l. Jan. 10-12 X X
: 2.                                                       Feb.                   07-09                                                                                                                                                                                                                                                                                                                               X
: 2. Feb. 07-09 X
: 3.                                               June                 05-07                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       X                                                                                                                                                                             X
: 3. June 05-07 X X


4       .                                     July                       10-12                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       X
4. July 10-12 X
: 5.                                                   Aug.                     07-09                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     X
: 5. Aug. 07-09 X
: 6.                                     Sept.                               04-06                                                                                                                                                                                                                                                                                                                                                                                                                                                                 X
: 6. Sept. 04-06 X
: 7.                                           Oct.                         09-11                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             X                                                                                                                                                                             X
: 7. Oct. 09-11 X X
: 8.                                                     Nov.                         06-08                                                                                                                                                                                                                                                                                                                             X
: 8. Nov. 06-08 X
: 9.                                                       Dec.                   04-06                                                                                                                                                                                                                                                                                                                               X
: 9. Dec. 04-06 X


==SUMMARY==
==SUMMARY==
:                                         3             Full                         ACRS               meetings                     completely                                 open 3             Full                         ACRS                 meetings                       with                 exemptions                       (4) 3             Full                         ACRS               meetings                       with                 exemptions                         (6)                     & 3             Full                         ACRS                 meetings                       with                 exemptions                       (6) (9)                           (B)                           (Re.                   Budget           Info.)
: 3 Full ACRS meetings completely open 3 Full ACRS meetings with exemptions (4) 3 Full ACRS meetings with exemptions (6) & 3 Full ACRS meetings with exemptions (6) (9) (B) (Re. Budget Info.)


                                                                                                    ~Full                                       ACRS                   Meetings,                           CY-1980
~Full ACRS Meetings, CY-1980


ATTACHMENT         l USNRC                 -                             Avisory                         Committee         on                   Reactor                 Safeguards                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 2
ATTACHMENT l USNRC - Avisory Committee on Reactor Safeguards 2


II.                                                       EXEMPT!ONS             USED                     FOR                     PARTLY                   CLOSED               ACRS                     SUBCOMMITTEE       MEETINGS                 DURING               CY-1980 Subsection                       lO(d),                             Public                             Law                   92-463,                     5           U.S         :     C.                             552b             (c)--
II. EXEMPT!ONS USED FOR PARTLY CLOSED ACRS SUBCOMMITTEE MEETINGS DURING CY-1980 Subsection lO(d), Public Law 92-463, 5 U.S : C. 552b (c)--
( l     )                                                 To                   protect                       classified                                     information.
( l ) To protect classified information.


( 4)                                                       To                   protect                         proprietary                                     information.
( 4) To protect proprietary information.


(6)                                                         To                   protect                           information,                                         the               release                       of               which           would         constitute                                   a clearly                             unwarranted                   invasion                       of             personal                         privacy.
(6) To protect information, the release of which would constitute a clearly unwarranted invasion of personal privacy.


(9)                             (B)                                                                                                           To                   protect                           information,                                       the                   premature                 disclosure                               of             which           would                 be likely                         to               significantly                                       frustrate                                       implementation                       of                 proposed         agency action.
(9) (B) To protect information, the premature disclosure of which would be likely to significantly frustrate implementation of proposed agency action.
ACRS                   Subcommittee           Meetings                 -                                   (91)
ACRS Subcommittee Meetings - (91)
During             CY-1980,           75                   ACRS                 Subcommittee             Meetings               were             open,                       14                 were             partly closed,                                     and                 2         were           completely                         closed                           under       the                   exemptions                 indicated                                       below:
During CY-1980, 75 ACRS Subcommittee Meetings were open, 14 were partly closed, and 2 were completely closed under the exemptions indicated below:
ACRS                   Subcommittee           Meetings                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           ill                                                               ill                                                             ill                                                                                                           (9)                                 (B)
ACRS Subcommittee Meetings ill ill ill (9) (B)


l     .                                       Jan.                             09                           Reactor               Safety                           Research                                                                                                                                                                                                                                                 X                         (Closed)
l. Jan. 09 Reactor Safety Research X (Closed)
: 2.                                                 Apr.                     29                             Reactor                           Fuel                                                                                                                                                                                                                                                                             X 3   .                                           Apr.                     30                                 Reliability                                           & Probabilistic                                                                                                                                                                                                                                             X Assessment
: 2. Apr. 29 Reactor Fuel X 3. Apr. 30 Reliability & Probabilistic X Assessment
: 4.                                                     May                       09                         Class-9                       Accident                   Consideration                                                                                                                                                                                                                                             X
: 4. May 09 Class-9 Accident Consideration X
: 5.                                                   May                     20                             Reactor                 Operations                                                                                                                                                                                                                                                                               X
: 5. May 20 Reactor Operations X
: 6.                                                   May                     21                             Site                         Eval     ./Reactor                       Rad.               Effects                                                                                                                                                                                                                 X
: 6. May 21 Site Eval./Reactor Rad. Effects X
: 7.                                                 June                   03                                 Reactor               Safety                             Research                                                                                                                                                                                                                                                 X
: 7. June 03 Reactor Safety Research X
: 8.                                               June               17-18                                     Metal                       Components                                                                                                                                                                           X
: 8. June 17-18 Metal Components X
: 9.                                                 June                 26                                 Safeguards                           & Security                                                                                                                           X                                                                                                                                 X l O.                                                       June                   26-27                           Waste           Management/Fuel Cycle                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   x
: 9. June 26 Safeguards & Security X X l O. June 26-27 Waste Management/Fuel Cycle x


11         .                                     Sept.                               19                           Ad                         Hoc                     Subcommittee:                                                                                                                                                                                                                                                                     x             (Closed)
11. Sept. 19 Ad Hoc Subcommittee: x (Closed)
ACRS-         Rea ktor-S i c herhei tskommi ss ion                       (RSK)
ACRS-Rea ktor-S i c herhei tskommi ss ion (RSK)
: 12.                                             Oct.                           08                                   Dresden,                     Unit               1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   x USNRC                 -                             Advisory                         Committee         on                   Reactor                 Safeguards                         -                                 1980                                                                                                                                         3
: 12. Oct. 08 Dresden, Unit 1 x USNRC - Advisory Committee on Reactor Safeguards - 1980 3


ACRS                   Subcommittee           Meetings                 (continued)                                                                                                                                                                                                               ill ill   ill                                                                                                                                     (9)                           (B)
ACRS Subcommittee Meetings (continued) ill ill ill (9) (B)
: 13.                                                   Nov.                           21                                                                                                                                                       Class-9                     Accident                   Consideration                                                       X
: 13. Nov. 21 Class-9 Accident Consideration X
: 14.                                                     Nov.                       28-29                                                                                         Three               Mile             Island,                                     Unit               l X 15         .                                                   Dec.                     03                                                                                                                                                                     Reactor             Safety                             Research                                           X
: 14. Nov. 28-29 Three Mile Island, Unit l X 15. Dec. 03 Reactor Safety Research X
: 16.                                                         Dec.                     03                                                                                                                                           Reliability                                           & Probabilistic                                                                   X Assessment
: 16. Dec. 03 Reliability & Probabilistic X Assessment


==SUMMARY==
==SUMMARY==
:                                                                 2           Closed             ACRS                   Subcommittee             Meetings l                         Exemption           (1) l                         Exemption           (9)                             (B)                           (Re.                     Budget         Info.)
: 2 Closed ACRS Subcommittee Meetings l Exemption (1) l Exemption (9) (B) (Re. Budget Info.)
14               Partly                               Closed             ACRS                 Subcommittee           Meetings l                       Exemptions               (1)                     and                     (4) 10                   Exemption                                   (9)                             (B)                         (All                           Re.                       Budget         Info.) 3             Ex em pt ion                                           ( 4)
14 Partly Closed ACRS Subcommittee Meetings l Exemptions (1) and (4) 10 Exemption (9) (B) (All Re. Budget Info.) 3 Ex em pt ion ( 4)


75                   Open                 ACRS                   Subcommittee           Meetings
75 Open ACRS Subcommittee Meetings


91                               ACRS                     Subcommittee           Meetings,                             CY-1980
91 ACRS Subcommittee Meetings, CY-1980


t.
t.
USNRC                   -                             Advisory                   Committee           on                 Reactor               Safeguards               -                                     1980
USNRC - Advisory Committee on Reactor Safeguards - 1980
: a.                                                   How             the                   Committee       Accomplishes     its                   Purposes The                 Advisory                 Committee         on                   Reactor             Safeguards                       (ACRS),           established                                         in                   1957                   by statute,                                     accomplishes                   its                       purposes                   by                       reviewing                   and                 reporting                               on               safety studies                                   and             facility                               license                         applications                                     referred                         to               it;                 advising                     the                     NRC and             the                 Congress           on                       any                 potential                                         hazards                   of                 proposed       or             existing                             nuclear power         plants,                                       and               spent                   fuel                         reprocessing                                 and               storage                   facilities                                                 and               the adequacy       of                 proposed       safety                           standards;                                       and               performing                 such             other               duties                               as the                   Commission         or             the                   Congress       may                     request.                                                                     The                 Committee         conducts             an annual                   review           of             the                     NRC                     Reactor             Safety                     Research             Program         and               reports                   to the                 Congress           on                 the               status                             of           this                           program.                                           The               ACRS               also                       reviews               DOE nuclear                 facilities                                               when               requested                           by                 the                     Department     of               Energy.                                             The             full Committee           normally                   meets                 once             a           month             for                     a           three-day                         session                       to               consider projects,                                     generic                             and               special                               reviews,                             and               criteria                                       and                 regulatory                             guides that                         are                     ready             for               full                                 Committee         consideration.                                                                                   ACRS                     subcommittees         meet as                 necessary                           with               the                 license                       applicant,                                               NRC                 Staff,                                 and             others                       to                 develop information                       for                 the                   Committee         on                 the                 particular                             matter                         under             review             and           to identify                                 those               matters                         warranting                 particular                             attention                                           by                 the               full                                 Committee.
: a. How the Committee Accomplishes its Purposes The Advisory Committee on Reactor Safeguards (ACRS), established in 1957 by statute, accomplishes its purposes by reviewing and reporting on safety studies and facility license applications referred to it; advising the NRC and the Congress on any potential hazards of proposed or existing nuclear power plants, and spent fuel reprocessing and storage facilities and the adequacy of proposed safety standards; and performing such other duties as the Commission or the Congress may request. The Committee conducts an annual review of the NRC Reactor Safety Research Program and reports to the Congress on the status of this program. The ACRS also reviews DOE nuclear facilities when requested by the Department of Energy. The full Committee normally meets once a month for a three-day session to consider projects, generic and special reviews, and criteria and regulatory guides that are ready for full Committee consideration. ACRS subcommittees meet as necessary with the license applicant, NRC Staff, and others to develop information for the Committee on the particular matter under review and to identify those matters warranting particular attention by the full Committee.
There           were               91                             subcommittee       meetings                   in                   CY                         1980.                                             The               Committee's             report                             on applications                                   for                 facility                               licenses,                                             and                   on                 other               matters,                                       become           a           part                         of the                   record                         and               are                   made               available                               to               the                 public,                             except               for                   privileged                                   or security                             material.
There were 91 subcommittee meetings in CY 1980. The Committee's report on applications for facility licenses, and on other matters, become a part of the record and are made available to the public, except for privileged or security material.
: b.                                               Compelling         Need           for                     Committee There           is                 a             compelling                     need         for                 the                   ACRS                   because             it               provides                 for                     an
: b. Compelling Need for Committee There is a compelling need for the ACRS because it provides for an


ATTACHMENT       2 USNRC                   -                               Advisory               Committee           on                 Reactor               Safeguards                 -                                   1980                                                                                                                                                                                                                                                                                                                                                                                                           2
ATTACHMENT 2 USNRC - Advisory Committee on Reactor Safeguards - 1980 2


independent                 review             of               the                 potential                                       hazards                       of                 proposed           and               existing                               U,S.
independent review of the potential hazards of proposed and existing U,S.
nuclear                 facilities                                                 and                       of                   proposed           and             existing                                 nuclear                 safety                         standards                         and, therefore,                                         provides                     protection                           for                 the                   public                           in               the                     uses               of               nuclear               tech nology             and             materials.
nuclear facilities and of proposed and existing nuclear safety standards and, therefore, provides protection for the public in the uses of nuclear tech nology and materials.


The               frequent                         meetings                 of             the                   ACRS                   provide                       an                 opportunity                         for                   the                 public               to observe                     and               participate                                               in             the                 regulatory                               process,                                 and             the                 Committee:           reports provide                   a           mechanism     to                       inform         the                   public                       and             the                 Congress       of             the                 findings of                 an                   independent                   group           of             experts                             knowledgeable     in               reactor                         safety                   matters.
The frequent meetings of the ACRS provide an opportunity for the public to observe and participate in the regulatory process, and the Committee: reports provide a mechanism to inform the public and the Congress of the findings of an independent group of experts knowledgeable in reactor safety matters.


The               compelling                     need           for                   the                   Committee         is                   supported                     by                   the                 findings                         of             the Presidential                                                     Commission         on                 the                   TMI-2               Incident                                 (Kemeny                 Commission)         which concluded         that                     the                   Committee           should                 be                   retained,                                           and               strengthened,                               to continue                     providing                           an                       independent             technical                                         check               on                 safety                       matters.
The compelling need for the Committee is supported by the findings of the Presidential Commission on the TMI-2 Incident (Kemeny Commission) which concluded that the Committee should be retained, and strengthened, to continue providing an independent technical check on safety matters.
: c.                                                 Balance           in                 Membership       on                   ACRS The                   Nuclear         Regulatory                       Commission,         on                 the               basis                           of             the               technical                                       review functions                         outlined                                   in                 the               statutory                                   mission                   of             the                   Committee,         appoints ACRS                   members                   from             the               scientific                                             and               engineering                   disciplines                                         with           three prerequisites                                                   in                 mind:                                         outstanding                       sci~ntific                                                 and             technical                             ability, balanced                 and                 mature               judgment,                     and             willingness                             to                 devote                 the                   time                 required (approximately                             130                 days                     each         year)                         to               the                     demanding     work                 involved.                                                               The pool                   of               persons                     so             qualified                               is                 limited.                                                                       At                 the                     end               of                 1980,           the                   Commit tee                     included               eight                         members                   from                 academic         institutions,                                                           two                   employees         of national                           laboratories                                                     and             five                             members                 who                   have             retired                                 from             active
: c. Balance in Membership on ACRS The Nuclear Regulatory Commission, on the basis of the technical review functions outlined in the statutory mission of the Committee, appoints ACRS members from the scientific and engineering disciplines with three prerequisites in mind: outstanding sci~ntific and technical ability, balanced and mature judgment, and willingness to devote the time required (approximately 130 days each year) to the demanding work involved. The pool of persons so qualified is limited. At the end of 1980, the Commit tee included eight members from academic institutions, two employees of national laboratories and five members who have retired from active


V
V
                                                                                                                                                                                                                                                                                                                                                                  ~ . . .
~...
I USNRC                   -                                 Advisory                   Com~ittee                 on                   Reactor                 Safeguards                   -                                     1980                                                                                                                                                                                                                                                                                                                                                                                                                                         3
I USNRC - Advisory Com~ittee on Reactor Safeguards - 1980 3


employment               with                 nuclear                         and                   non-nuclear                         backgrounds.                                                 There                 has                       been                 a conscious               effort                       to               obtain                         members             trained                                   in                 both             nuclear                     and         the                     non nuclear                   disciplines                                               who                     have                   had               considerabl~                           experience                       in                 various                 fields needed       to             evaluate                                 proposed       construction                                           and             operation                     of             nuclear                       power plants                               and               related                       facilities.                                                                             This                 permits                         and           fosters                                 a       concentration
employment with nuclear and non-nuclear backgrounds. There has been a conscious effort to obtain members trained in both nuclear and the non nuclear disciplines who have had considerabl~ experience in various fields needed to evaluate proposed construction and operation of nuclear power plants and related facilities. This permits and fosters a concentration


                                                                                                                                              ~
~
within                   the                   Committee       of             scientific                                             and               engineering                     proficiency,                                   together with               a         diversity                                     of             viewpoints                         and             perspectives,                                                     which             provides                   assurance that                       adequate               independent,                             open             discussion                                 and             analysis                               of           the               potential hazards                     of               nuclear                 reactors                                       and             the                     adequacy         of             safety                           standards                           can           take place.
within the Committee of scientific and engineering proficiency, together with a diversity of viewpoints and perspectives, which provides assurance that adequate independent, open discussion and analysis of the potential hazards of nuclear reactors and the adequacy of safety standards can take place.


During         1980,           the                   membership         included               those                 experienced                   in             radioactive                                       waste management,         chemical                 processing                     of             spent                 reactor                     fuel,                         electrical                                         engineering, chemical               engineering,                           civil                             engineering,                               materials                             engineering,                                   mechanical engineering,                                 nuclear                 engineering,                               reactor                       operations,                                     heat             transfer                                 and         fluid flow,                   reactor                               physics                         and             probabilistic                                       analysis.                                                           Anticipated                             membership needs             include                     individuals                                           knowledgeable     in             the               areas                       noted               above             with               increased emphasis             on               quantitative                                         risk                   assessment                   experience.
During 1980, the membership included those experienced in radioactive waste management, chemical processing of spent reactor fuel, electrical engineering, chemical engineering, civil engineering, materials engineering, mechanical engineering, nuclear engineering, reactor operations, heat transfer and fluid flow, reactor physics and probabilistic analysis. Anticipated membership needs include individuals knowledgeable in the areas noted above with increased emphasis on quantitative risk assessment experience.


To                   provide                 for                 public                         involvement                   in             the                     nominating             p~ocess           for                   ACRS                 members, the                     NRC                 issues                         public                       announcements soliciting                                               nominees         when               vacancies                 arise.
To provide for public involvement in the nominating p~ocess for ACRS members, the NRC issues public announcements soliciting nominees when vacancies arise.
In             the                 past,                           a           large                           number           of               nominations                   have                   been             received                             from             the               public, including                     organizations                                             such               as                   public                   interest                                       groups             and             technical                             societies, USNRC                   -                             Advisory                   Committee             on                   Reactor               Safeguards                 -                                   1980                                                                                                                                                                                                                                                                                                                                                                                                               4
In the past, a large number of nominations have been received from the public, including organizations such as public interest groups and technical societies, USNRC - Advisory Committee on Reactor Safeguards - 1980 4


and                   we                     expect               this                       interest                             to               continue                     when             future                           vacancies                     are announced.                               Further,                             the             diversity                                       of                 viewpoints                   presently                           represente~
and we expect this interest to continue when future vacancies are announced. Further, the diversity of viewpoints presently represente~
by                   current                             ACRS                   members               is                   broadly                     based               from                 the                 standpoint                           of             special fields                                 of               interest,                                             employment             experience                             and             scientific                                       or             technical specialty.                                                                                 These             membership       characteristics                                                     provide                 the                 Committee         with a             balance                       of                 highly                 qualified                               tec~nical                                   experts                               in               the                 nuclear                       and                   non nuclear                 fields                               necessary                 to             carry                         out               the                   Committee   '         s           statutory                                 re quirements.
by current ACRS members is broadly based from the standpoint of special fields of interest, employment experience and scientific or technical specialty. These membership characteristics provide the Committee with a balance of highly qualified tec~nical experts in the nuclear and non nuclear fields necessary to carry out the Committee ' s statutory re quirements.
: d.                                                   Frequency       of               Meetings           and               Relevance The                 ACRS,                   its                     subcommittees               and                   working           groups             held                 103               meetings             during 1980.                                               The                     number             of             meetings                 held               is               directly                             related                           to                 the                     number of               reactor                           projects                             referred                                       by                 the                   Nuclear           Regulatory                     Commission         to               the Committee         for                     review;                   the                       number             of               generic                     issues                           which             arose                 during               the year;                         the                       number             of             criteria                                       and                 guides                 referred                         to             the                   Committee         for               re view                 and                   comment;             the                         number           of               DOE                       and                   DOD                 reactor                         projects                           referred; and               the                         number             of             special                                   reviews                 requested                           by                 the                     NRC                       and               Congress.                                               The full                               Committee           normally                 meets                   once             a           month             for                   a           three-day                       session                     to consider                   projects,                                   generic                         and               special                               reviews,                             and             criteria                                       and                 regulatory guides               that                         are                   ready             for               full                                 Committee           consideration.                                                                             ACRS                     subcommittees meet                       as                   necessary                         with               license                       applicants,                                                     NRC                 Staff,                                   and             others                 to                 develop infonnation                         for                   the                   Committee           on               the                 particular                                 matters                             under             review             and             to identify                               those                 matters                       warranting                   particular                             attention                                         by               the               full                                 Committee.
: d. Frequency of Meetings and Relevance The ACRS, its subcommittees and working groups held 103 meetings during 1980. The number of meetings held is directly related to the number of reactor projects referred by the Nuclear Regulatory Commission to the Committee for review; the number of generic issues which arose during the year; the number of criteria and guides referred to the Committee for re view and comment; the number of DOE and DOD reactor projects referred; and the number of special reviews requested by the NRC and Congress. The full Committee normally meets once a month for a three-day session to consider projects, generic and special reviews, and criteria and regulatory guides that are ready for full Committee consideration. ACRS subcommittees meet as necessary with license applicants, NRC Staff, and others to develop infonnation for the Committee on the particular matters under review and to identify those matters warranting particular attention by the full Committee.
If           the                   Committee         is               to               continue                 to                 meet               the                   requirements                         of               the               statute which           established                                   it,                         and               the                 later                   additions                                     and                 amendments,         it           will                               need USNRC                   -                             Advisory                 Committee             on                   Reactor             Safeguards                 -                                     1980                                                                                                                                                                                                                                                                                                                                                                                                               5
If the Committee is to continue to meet the requirements of the statute which established it, and the later additions and amendments, it will need USNRC - Advisory Committee on Reactor Safeguards - 1980 5


to                 continue                   to                 meet                 at                   a         similar                               frequency                       in             the               future.
to continue to meet at a similar frequency in the future.
: e.                                         Effect                     of               Committee       Reports                   on                   Agency           Operations The                   ACRS                 reports                                     and                       recommendations to               the                   Commission           have                     been               used extensively                                             in                     NRC                   policy                       fonnulation                                     and               decision                           making         since                 estab-1 i shment                 of             the                     agency             on                 January                 19,                     1975.                                                       In               those                   cases                   where             a license                         application                                   is                 submitted                       under         Section                       103             or             designated               facili ties                           under         Section                           104               of             the                   Atomic                 Energy           Act,                     an                   ACRS                 report                     is                 re quired                       by                 statute.                                             *In                     each               such           case,                   the                     NRC                 Staff,                             following               the receipt                                 of                 an                   ACRS                 report,                                 prepares                     a             supplemental                   safety                         evaluation report                           which             outlines                                       in             detail                               the                 actions                         the                     NRC                 Staff                           has                   or             is taking                   to               carry                           out                 the                   ACRS                 recommendations.                                           These           reports                         are               entered into                   the                   public                       docket           file                   for                       each           facility                                   case                   so               they                 are               available for                       use                 by                   parties                           to                   NRC                   licensing                                 proceedings.
: e. Effect of Committee Reports on Agency Operations The ACRS reports and recommendations to the Commission have been used extensively in NRC policy fonnulation and decision making since estab-1 i shment of the agency on January 19, 1975. In those cases where a license application is submitted under Section 103 or designated facili ties under Section 104 of the Atomic Energy Act, an ACRS report is re quired by statute. *In each such case, the NRC Staff, following the receipt of an ACRS report, prepares a supplemental safety evaluation report which outlines in detail the actions the NRC Staff has or is taking to carry out the ACRS recommendations. These reports are entered into the public docket file for each facility case so they are available for use by parties to NRC licensing proceedings.


On                     several                             occasions,                           substantive                                 restrictions                                           and/or     requirements                         have been                 imposed               by                   the                     NRC                       on                   nuclear                 facility                                 operations,                                       including                       power level                         limitations,                                                         augmented     test                         programs,                   and                   added           engineered           safety features,                                               based               on                   the                       recommendations of               the                 Committee.                               Specific                     atten tion                   is                 given               to                 ACRS                     recommendations with               respect                       to               other                   generic                   or selected                         safety                           issues                             and                 appropriate                             action                     is                       implemented       by               the                     NRC Staff.                                               Additionally,                                                     ACRS                       recommendations   are                       implemented         in               regulations, guides                 and               regulatory                               policies                                         and               practices                                         promulgated           by                   the                 Commission.
On several occasions, substantive restrictions and/or requirements have been imposed by the NRC on nuclear facility operations, including power level limitations, augmented test programs, and added engineered safety features, based on the recommendations of the Committee. Specific atten tion is given to ACRS recommendations with respect to other generic or selected safety issues and appropriate action is implemented by the NRC Staff. Additionally, ACRS recommendations are implemented in regulations, guides and regulatory policies and practices promulgated by the Commission.
For                 example,               proposed             NRC                   regulatory                                   guides                   developed         for                       po~1er             reactors are                     not               published                 for                 public                         comment               until                             the                   comments             of               a           designated USNRC                   -                             Advisory               Committee           on                   Reactor               Safeguards               -                                   1980                                                                   6
For example, proposed NRC regulatory guides developed for po~1er reactors are not published for public comment until the comments of a designated USNRC - Advisory Committee on Reactor Safeguards - 1980 6


ACRS                     subcommittee       are                   taken                     in                 account.                                                         The             final                                 guide           is                     not promulgated         for                       use               until                                 the                 ACRS                     has               concurred.                                                   Other         types                         of regulatory                                   guides               are                 referred                         to               the                   Committee             on                   a         selective                                   basis by                           NRC.
ACRS subcommittee are taken in account. The final guide is not promulgated for use until the ACRS has concurred. Other types of regulatory guides are referred to the Committee on a selective basis by NRC.


The               action                     taken             to                       implement         specific                                   ACRS                     recommendations regarding '
The action taken to implement specific ACRS recommendations regarding '


an                   individual                               licensing                           application                                   is                   published                     in                 an                     NRC                 Staff                     Supple mentary             Safety                     Evaluation                           Report               for                   consideration                               at               the                 related                         public licensing                               hearing.                                                                   In               addition,                                     the               status                           of             ACRS                     recommendations, comments,                 and           questions                           is                 monitored                 on                 a           periodic                       basis                         using               a         detailed report                       to               the                   ACRS                     from             the                     NRC                 Staff                     relating                             point                         by                     point                     what         Staff action                             has                   been               taken                 or               is                     planned             on                       each           ACRS                     recommendation.                                       In addition,                                     frequent                     status                                 and             final                             reports                             regarding                   resolution                                 of             ACRS comments               and                     recommendations   are                     given               during                 monthly             ACRS                   meetings                 and recorded                     in               the                 minutes                   of               these                   meetings.                                                               In                 the                 event                 the                   ACRS                   con siders                                   NRC               Staff                     action                         inadequate                   with               respect                     to               its                       recommendations, a           mechanism         is               available                               to                 bring                 these                   matters                     directly                           to               the               attention of               the                   Commissioners.
an individual licensing application is published in an NRC Staff Supple mentary Safety Evaluation Report for consideration at the related public licensing hearing. In addition, the status of ACRS recommendations, comments, and questions is monitored on a periodic basis using a detailed report to the ACRS from the NRC Staff relating point by point what Staff action has been taken or is planned on each ACRS recommendation. In addition, frequent status and final reports regarding resolution of ACRS comments and recommendations are given during monthly ACRS meetings and recorded in the minutes of these meetings. In the event the ACRS con siders NRC Staff action inadequate with respect to its recommendations, a mechanism is available to bring these matters directly to the attention of the Commissioners.


With                 regard               to               the                   development             of                   proposed         regulatory                                 guides                   and             criteria, the                     ACRS                   subcommittee           and           full                                 Committee       meetings                 provide                   a             public                     forum where         the                 opinion                   of               interested                                 technical                                           groups             or               individuals                                             and                 members of               the                   public                     may                           be                 presented.                                                                                                                                                                                                       [
With regard to the development of proposed regulatory guides and criteria, the ACRS subcommittee and full Committee meetings provide a public forum where the opinion of interested technical groups or individuals and members of the public may be presented. [


[ ..
[..
[..
In                 the                 area                 of             reactor                         safety                           research,                           the                   ACRS                 annually                           examines     the                                                   f ..
[..
In the area of reactor safety research, the ACRS annually examines the f..
f
f


USNRC                   -                               Advisory               Committee           on                   Reactor             Safeguards                 -                                     1980                                                                                                                                                                                                                                                                                                                                                                                                               7
USNRC - Advisory Committee on Reactor Safeguards - 1980 7


thrust                                 and               funding                   of               the                 overall                                       NRC                 safety                             research                             program       and                 conducts in-depth                     discussions                                         of             the               effectiveness                                         of             the               eight                         major             NRC                     research decision                       units                               and               subelements.                                                             The               conclusions                         of             these                       reviews             are reported                     to               the                   Congress         as                   mandated             by                   Public                     Law                   95-209.                                             These           con clusions                           are                 considered                         by                     Congress           in               the                 authorization                                             of             the                     NRC                   safety research                         budget.                                                         In               addition,                             thi             Commissioners   have                 requested                       and             the '
thrust and funding of the overall NRC safety research program and conducts in-depth discussions of the effectiveness of the eight major NRC research decision units and subelements. The conclusions of these reviews are reported to the Congress as mandated by Public Law 95-209. These con clusions are considered by Congress in the authorization of the NRC safety research budget. In addition, thi Commissioners have requested and the '


Committee           provides                       a           separate                         report                             on                 the                     NRC's                   proposed       research                             budget prior                   to             action                               on                 the                     budget             by                 the                   Commission.                                       The               ACRS               recently                                     pro vided               testimony                     to               the                   House             Committee             on                 Interior                                   and               Insular                   Affairs Subcommittee   on                       Energy             and               the                     Environment         regarding                 the                   NRC                 authorization for                   its                     FY-1982       Reactor             Safety                         Research             Budget             and                   on                 other                       budget       matters.
Committee provides a separate report on the NRC's proposed research budget prior to action on the budget by the Commission. The ACRS recently pro vided testimony to the House Committee on Interior and Insular Affairs Subcommittee on Energy and the Environment regarding the NRC authorization for its FY-1982 Reactor Safety Research Budget and on other budget matters.


In                 the                   area                   of               policy                       formulation,                               the                   ACRS             often                     suggests                   initiation                                             of staff                     studies                                 and             participates                                                 in             the                 formulation                             of             technical                               policy                           on important                   safety                           issues.                                                                     The               Committee's                 overall                                     knowledge     and               advice                   with respect                         to               the                 resolution                                       of             speci'fic                       safety                           issues                           and                 generic                   issues                     is useful                       to               the                   Commission         both                   in             decision                             making         for                   individual                                   cases                     and in                     program         planning             for                 the                     NRC               Staff's                             resources.                                                 Additionally,                                       the Committee's               continuing                               review         of               both             industrial                                                   and                     governmental           research programs         provides                     the                 valuable                       perspective                                   of                 an                     independent               body           of technical                                 experts                         with               respect                           to               the                       scope             and               content                         of             the                       program         and the                   assignment                 of             priorities                                   to                 individual                                   research                   efforts.
In the area of policy formulation, the ACRS often suggests initiation of staff studies and participates in the formulation of technical policy on important safety issues. The Committee's overall knowledge and advice with respect to the resolution of speci'fic safety issues and generic issues is useful to the Commission both in decision making for individual cases and in program planning for the NRC Staff's resources. Additionally, the Committee's continuing review of both industrial and governmental research programs provides the valuable perspective of an independent body of technical experts with respect to the scope and content of the program and the assignment of priorities to individual research efforts.
: f.                                                       Why                       ACRS                   Recommendations and               Information                           Cannot             be                 Obtained           from             Other Sources
: f. Why ACRS Recommendations and Information Cannot be Obtained from Other Sources


As                   established                                               by                 the                   Atomic               Energy             Act           . of                 1954,               the                 Advisory             Committee         on USNRC                 -                               Advisory               Committee             on                   Reactor             Safeguards               -                                     1980                                                                                                                                                                                                                                                                                                                                                                     8
As established by the Atomic Energy Act. of 1954, the Advisory Committee on USNRC - Advisory Committee on Reactor Safeguards - 1980 8


Reactor             Safeguards                 is                     an                       independent           organization                                           which           is                   mandated         to perform         certain                         specific                               functions                                 and                   provide                     advice                 to               the                   Nuclear Regulatory                       Commission         with                 regard                 to               the                 potential                                         hazards               of                   proposed or             existing                                 nuclear                 facilities                                                   and               the                     adequacy         of                   proposed       reactor standards.                                                                       The                 Committee           is                     unique               in             that                   there                   exists                                   no                     comparable body                   composed           of                 acknowledged experts                           in             the             field                           of               nuclear                 reactor safety                                 whose         Congressional                           mandate         is             to                 provide               the                   Commission     with independent               advice                     in             this                   area.[l]                                                                 The               Commission       necessarily                                         has                 its own                 expert                   staff                           on                   whom               it             relies                                   in             the                   day-to-day                         regulation                                 of               nuclear power       facilities.                                                                                     However,         there                     is                       no                 other                   advisory                         committee,             either within                 the                   Commission         or                   in               other                   agencies                     with           the               current,                                   broadly based           knowledge   of               the                 ACRS                   which           could                   be               called                             upon             for                     independent assessments                       of             reactor                         safety                         issues.
Reactor Safeguards is an independent organization which is mandated to perform certain specific functions and provide advice to the Nuclear Regulatory Commission with regard to the potential hazards of proposed or existing nuclear facilities and the adequacy of proposed reactor standards. The Committee is unique in that there exists no comparable body composed of acknowledged experts in the field of nuclear reactor safety whose Congressional mandate is to provide the Commission with independent advice in this area.[l] The Commission necessarily has its own expert staff on whom it relies in the day-to-day regulation of nuclear power facilities. However, there is no other advisory committee, either within the Commission or in other agencies with the current, broadly based knowledge of the ACRS which could be called upon for independent assessments of reactor safety issues.


In               addition,                                   since                       ACRS                   members                 are                 primarly                     part-t                 i     me                     advisors                           with           other full-time                                 interests                                           and             activities                                               in             related                         fields,                                 they                 bring             to                   bear in                   an                   organized                         manner           a           breadth                     of             experience                         and             current                       technical                                     knowl edge           which             would                 be               difficult                             to               duplicate                               with             full-time                                             government employees.
In addition, since ACRS members are primarly part-t i me advisors with other full-time interests and activities in related fields, they bring to bear in an organized manner a breadth of experience and current technical knowl edge which would be difficult to duplicate with full-time government employees.


A continuing                             committee               such               as                 the                   ACRS               also                       remains             current                         with             respect
A continuing committee such as the ACRS also remains current with respect


[l]                     The                 Kemeny                     Commission           recommended     that                     the                     Committee         members               continue as                 part-time                               appointees                               and               stated                       their                   belief                     that                   the                     independence and                   high           quality                             of             the                   members               might                   be                     compromised       by                     making               them full-time                                       Federal                         employees.
[l] The Kemeny Commission recommended that the Committee members continue as part-time appointees and stated their belief that the independence and high quality of the members might be compromised by making them full-time Federal employees.
USNRC                 -                             Advisory                 Committee           on                 Reactor               Safeguards               -                                 1980                                                                                                                                                                                                                                                                                                                                                                                                             9
USNRC - Advisory Committee on Reactor Safeguards - 1980 9


to               nuclear                   safety                         issues,                                 including                       related                         reactor                           operating                     experience and               safety                           research,                                         and                 provides                       a         collegial                                                   judgment         regarding               these issues                     that                       would             be                     impossible                   to             duplicate                                   by                       use             of               individual,                                   part time                 consultants                                         on                   a         case-by-case                             basis.
to nuclear safety issues, including related reactor operating experience and safety research, and provides a collegial judgment regarding these issues that would be impossible to duplicate by use of individual, part time consultants on a case-by-case basis.


                                                                                                                                                            )   .
).
Through     the                   ACRS,                 the                   public                         and               the                   Congress       are                     provided               assurance             that an                     independent           technical                                       review                 and               evaluation                             of               nuclear                 reactor                       projects and             safety                           issues                       is                   accomplished               and                 an                 opportunity                       for                   public                     input                 during ACRS                 meetings                 is                 assured.
Through the ACRS, the public and the Congress are provided assurance that an independent technical review and evaluation of nuclear reactor projects and safety issues is accomplished and an opportunity for public input during ACRS meetings is assured.
: g.                                                     Degree       of           Duplication                         of           Effort As                               noted               above,                     ACRS               efforts                             are                     not             duplicated                                 by                 other                       committees         or               agen cies                     within                 the                     government.                                                 However,               due             to               the                   independent             nature               of         the Committee's               statutory                                 responsibilities,                                                     the                   ACRS                   review                 and             that                       of             its consultants                                         does             duplicate,                                 to                   some               degree,                           as                   intended                         by                       law,                     some                 aspects of               the                       NRC               Staff's                                   review           of             applications                                   for                   nuclear                         power         faciltiy                                 licenses and             of             the                 monitoring                   of             operating                       reactors.                                                                               In               this                       regard,                           the                 ACRS               effort provides                           an                     independent                   check             of                 NRC                   regulatory                           activities                                               which           is             largely directed                               at                       new                   and                       improved           reactor                           safety                     features,                                                 an                 exploration                                 of           the basis                   for                       NRC               Staff                   decisions                                     as               they                 relate                       to               reactor                         safety,                                           and             assur ance           that                   all                     factors                           that                     could                 endanger       the                 public                   health                           and             safety                               have been             adequately                     considered                         in                 making             licensing                           decisions.
: g. Degree of Duplication of Effort As noted above, ACRS efforts are not duplicated by other committees or agen cies within the government. However, due to the independent nature of the Committee's statutory responsibilities, the ACRS review and that of its consultants does duplicate, to some degree, as intended by law, some aspects of the NRC Staff's review of applications for nuclear power faciltiy licenses and of the monitoring of operating reactors. In this regard, the ACRS effort provides an independent check of NRC regulatory activities which is largely directed at new and improved reactor safety features, an exploration of the basis for NRC Staff decisions as they relate to reactor safety, and assur ance that all factors that could endanger the public health and safety have been adequately considered in making licensing decisions.
: h.                                       Relationship                                 of             the                 Annual             Costs               of             the                 ACRS             to               Advice               and               Information Provided
: h. Relationship of the Annual Costs of the ACRS to Advice and Information Provided


The             direct                       cost                   of           the                   ACRS             activities                                               in                 CY                           1980           was                 approximately
The direct cost of the ACRS activities in CY 1980 was approximately
                $2,700,000.                                                         As                         noted           earlier,                               the                   Committee       conducted             103               meetings               during
$2,700,000. As noted earlier, the Committee conducted 103 meetings during
* 4       ,
* 4,


USNRC                 -                               Advisory                   Committee             on                 Reactor             Safeguards                 -                                     1980                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 10
USNRC - Advisory Committee on Reactor Safeguards - 1980 10


CY                           1980               and                 submitted                       52                 reports.                                                         Fifteen                           of               these                   reports                           concerned generic                       nucler                 safety                           issues,                                 eleven                       were               reports                       to               the                     NRC                       Chairman and               Commissioners     on                 specific                             safety                           issues                             and                     problems         on                 which           they had                 requested                     advice,                           six                   were             related                         to                 the                 TMI-2             incident                                 and               corrective actions                         to                   be             taken,                       six                   were             related                       to               licensing                                     of             specific                               nuclear facilities                                                 and               six                   were             related                       to'         regulatory                               policy                     issues                           on                   which         the Committee's                   advice                       was                     needed.                                           There           were               two               reports                       to               Congress,                 one to                 meet               the                 statutory                                     requirements                     of               PL                         95-209       that                   the                 Committee annually                           conduct             a             study                 of             the                     NRC                   Reactor           Safety                       Research         Program           as mentioned         earlier,                                         and                   one             to                 Congressman     Udall                   on               the               subject                       of             licensee event                   reports.                                                                         The                     remaining           six                 reports                                 were             directed                             to               the                 NRC Executive                 Director                       for                 Operations                   regarding                         proposed         regulatory                             guides, amendments           to                   regulations                                         and               related                         matters.
CY 1980 and submitted 52 reports. Fifteen of these reports concerned generic nucler safety issues, eleven were reports to the NRC Chairman and Commissioners on specific safety issues and problems on which they had requested advice, six were related to the TMI-2 incident and corrective actions to be taken, six were related to licensing of specific nuclear facilities and six were related to' regulatory policy issues on which the Committee's advice was needed. There were two reports to Congress, one to meet the statutory requirements of PL 95-209 that the Committee annually conduct a study of the NRC Reactor Safety Research Program as mentioned earlier, and one to Congressman Udall on the subject of licensee event reports. The remaining six reports were directed to the NRC Executive Director for Operations regarding proposed regulatory guides, amendments to regulations and related matters.


In               addition,                                           members                   of             the                     ACRS                   Fellowship                 Program           (established                                             by PL                         95-209)               prepared                 approximately                           65                 reports                               in                   1980             on                 a         variety                                   of nuclear                   safety                       matters.
In addition, members of the ACRS Fellowship Program (established by PL 95-209) prepared approximately 65 reports in 1980 on a variety of nuclear safety matters.
INTERAGENCY                   REPORTS           CON   i ROL NUMBER ANNUAL                                   COIVll"'REHENSIVE             REVIEW OF     FEDERAL               ADVISORY                               COMMITTEE                                                                                                                                                                                                                                                                                                                                           0264-GSA-AN
INTERAGENCY REPORTS CON i ROL NUMBER ANNUAL COIVll"'REHENSIVE REVIEW OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN


INSTRUCTIONS:                                   Complete     one                   form           for   each                 committee                   in     ex           istence a     -t fhe e-nd           o         f   fhe ca               lenda~                   year             being       reported. lfaad1fional             space               is*
INSTRUCTIONS: Complete one form for each committee in ex istence a -t fhe e-nd o f fhe ca lenda~ year being reported. lfaad1fional space is*
required, attach         a         separate sheet of paper   and                   cite appropriate     i_tem   number                                 (s) . _         _
required, attach a separate sheet of paper and cite appropriate i_tem number (s). _ _
: 1. DEPARTMENT             OR     AGENCY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     2. CALENDAR           YEAR U.S.                             Nuclear                             Regulatory                                     Commission                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             1980
: 1. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U.S. Nuclear Regulatory Commission 1980


3   . NAME     OF   COMMITTEE           (and                 1ubcommittee,                               if appropriate)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             4. DATE     ESTABLISHED             OR     LAST REESTABLISHED                 OR       RENEWED Screening                                 Committee                                       for                     Lawyer                           Vacancies                                   on                 the                                                                                                                                                                                                                                                                         /mo,trecentJ Licensing                                 Board                       Panel                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   February                                 21,                         1980
3. NAME OF COMMITTEE (and 1ubcommittee, if appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHED OR RENEWED Screening Committee for Lawyer Vacancies on the /mo,trecentJ Licensing Board Panel February 21, 1980


5 .       MEET ING         EXEMPT   iONS -                         For           closed     or         partially closed     meetings, list for   each           -   meeting-   thE(date and                       numberCs)                     on1rGoveirhmerit       1n the Sunshine             Act   (5     U.S.C.                       552b)             exemptions                         used. **-*             ---                   -                     -                           --                                           -                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         --                   *   -   *-       -     -
5. MEET ING EXEMPT iONS - For closed or partially closed meetings, list for each - meeting-thE(date and numberCs) on1rGoveirhmerit 1n the Sunshine Act (5 U.S.C. 552b) exemptions used. **-* --- - - -- - -- * - *- - -
DATE     OF     MEETING                                                                                                           NUMBER(S)                       OF   EXEMPTIONS               USED                                                                                                                 DATE     OF   MEETING                                                                                                             NUMBER(S)                         OF     EXEMPTIONS             USED
DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED
: a.               May                     9,                       1980                                                                                                                                                                                                                                                                                                                                                                                                         6                                                                                                                                                                                                                                                                       e.July                             23-24,                                 1980                                                                                                                                                                                                                                                                                                                       6
: a. May 9, 1980 6 e.July 23-24, 1980 6


b         .           June                         6,                         1980                                                                                                                                                                                                                                                                                                                                                                                 6                                                                                                                                                                                                                                                                                           f. Dec.                           18-19,                               1980                                                                                                                                                                                                                                                                                                                       6
b. June 6, 1980 6 f. Dec. 18-19, 1980 6


C.                 June                       12-13,                               1980                                                                                                                                                                                                                                                                       6                                                                                                                                                                                                                                                                                                                           g.
C. June 12-13, 1980 6 g.


d .           July                         2,                         1980                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               h.
d. July 2, 1980 h.
: 6. ESTABLISHMENT                   AUTHORITY                             FOR     COMMITTEE           (Mark             "X"           in appropriate                   box) 0           a_             Specifically di;ected by                 law                                                                                                                                                                                                                                                                       ~                 c.           Agency                     authority D b         . Authorized       by                 law                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         0       d. Presidential directive
: 6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark "X" in appropriate box) 0 a_ Specifically di;ected by law ~ c. Agency authority D b. Authorized by law 0 d. Presidential directive
: 7. AGENCY           RECOMMENDATION                   FOR     COMMITTEE           (Mark           "X"     In           appropriate         box) 0         a       . Terminate                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               [iJ b.         Continue
: 7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" In appropriate box) 0 a. Terminate [iJ b. Continue
: 8. IF   ITEMS       6(a)             AND   7(a)             ARE     MARKED,         ANSWER                 THE     FOLLOWING                     QUESTIONS:
: 8. IF ITEMS 6(a) AND 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS:
YES                                                   NO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   YES                                               NO a       .       Is   legislation   required to   terminate? ..   ..   ..   ... . ....   ........     .....   ... . .. 1-----+---l                                                                                             c     .       Is such             legislation pending?               ....   .....   .... ..... .....   ... ..   ..   . .....     1-----+---l b         . Is   such             legislation contemplated?                             ..........       .....   ..   ..   . ............         ...                                                                                                                                                                                                                                                                                                   d. Has       such             legislation been                 enacted?                 ........   . ..   ...... .....   . ..
YES NO YES NO a. Is legislation required to terminate?................................. 1-----+---l c. Is such legislation pending?.................................... 1-----+---l b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................
9   . IF~ ANSWER                   IN     ITEM     S(a)           THROUGH                       (d)       IS   MARKED       "NO",     PROVIDE                       A       BRIEF       EXPLANATION
9. IF~ ANSWER IN ITEM S(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION
: 10. IF THE       ANSWER                 TO       ITEM   8(c)             OR           (d)           IS   MARKED           "YES",             PROVIDE                 THE       FOLLOWING                       INFORMATION
: 10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION
: a.           BILL     OR     PUBLIC                   LAW             NUMBER                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       b.         PROPOSED           OR     EFFECTIVE                     DATE
: a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE
: 11. IF   ITEM         -6(b)             OR   61C)AND           7la)                               12. IF   ITEMS     6(d)     AND   7(a)             ARE     MARKED,         PROVIDE                     A       BRIEF         EXPLANATION ARE     MARKED,         PROVIDE                   THE PROPOSED           OR     EFFECTIVE DATE
: 11. IF ITEM -6(b) OR 61C)AND 7la) 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE
: 13.       IF   ITEM       7(b)               IS   MARKED,           ATTACH         A     JUSTIFICATION                           STATEMENT         TO   THIS       FORM       USING                 NUMBERED                     BOND     SHEETS       WITH               ITEMS       1, 2, AND     3 ON     EACH     SHEET.             THE   JUSTIFICATION                         SHOULD:
: 13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS 1, 2, AND 3 ON EACH SHEET. THE JUSTIFICATION SHOULD:


a         . Describe how                   the committee             accomplishes             *its-purpose.*
a. Describe how the committee accomplishes *its-purpose.*


b           . State wh           y           there is a         compelling       need         for the committee             .
b. State wh y there is a compelling need for the committee.


c     . Describe the balance                       of membership           in terms of   points of view represented and                   functions                   performed     .
c. Describe the balance of membership in terms of points of view represented and functions performed.


d   . Describe the frequency                   of meetings and                   the relevance     to     continuing                               the committee           .
d. Describe the frequency of meetings and the relevance to continuing the committee.
: e.         Describe the effect of committee             reports, advice,   or     recommendations                                                         on                       agency                               operations     .         .
: e. Describe the effect of committee reports, advice, or recommendations on agency operations..
: f.         Explain         why                     the advice or     information                         cannot                                         be           obtained                   from         other sources.
: f. Explain why the advice or information cannot be obtained from other sources.
: g.       Explain           any                         duplication         of effort with other committees,       within the agency                               , or   with other agencies     .
: g. Explain any duplication of effort with other committees, within the agency, or with other agencies.
: h. Describe the relationship of the cost     of the committee           to the advice   or     information                       provided.
: h. Describe the relationship of the cost of the committee to the advice or information provided.


GENERAL       SERVICES                   ADMINISTRATION                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               STANDARD               FORM     292   (12-80) Prescribed       by                   GSA FPMR       101-6.10 USNRC                   -                                   Screening                                 Committee                                     for                   Lawyer Vacancies                                 on                 the                   Licensing                               Board                       Panel
GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Prescribed by GSA FPMR 101-6.10 USNRC - Screening Committee for Lawyer Vacancies on the Licensing Board Panel
: a.                                                                                                     How               the                   Committee                                   Accomplishes                                           its               Purpose.
: a. How the Committee Accomplishes its Purpose.


This                     Committee                                     performs                                   its               mission                               by                   assisting                                 the Nuclear                             Regulatory                                     Commission                                       in               the                     selection                               of candidates                                     to               fill                     lawyer                           vacancies                                     on                 the               Atomic Safety                           and                 Licensing                             Board                       Panel.                                                       The                   Committee evaluates                                     the                 information                                         submitted                                   by                 or             on                 behalf                         of each                 candidate,                                           seeks                       further                               information                                       as               necessary, interviews                                         the                 candidates,                                             contacts                               references,                                             and generally                                   performs                                 all                 other                       tasks                       necessary                                   in               the process                           of               assuring                               the                 Commission                                       that                     the                 broadest possible                             perspective                                       has                 been                   achieved                                   in               selecting lawyer                             candidates                                     for                   the                 Panel.                                                       Following                                 completion of               the                 process,                                     the                 Committee                                     submits                               the                 names                         of three                       candidates                                     to               the                   Commission                                       for                     its               consideration.
This Committee performs its mission by assisting the Nuclear Regulatory Commission in the selection of candidates to fill lawyer vacancies on the Atomic Safety and Licensing Board Panel. The Committee evaluates the information submitted by or on behalf of each candidate, seeks further information as necessary, interviews the candidates, contacts references, and generally performs all other tasks necessary in the process of assuring the Commission that the broadest possible perspective has been achieved in selecting lawyer candidates for the Panel. Following completion of the process, the Committee submits the names of three candidates to the Commission for its consideration.
: b.                                                                       Need                     for                   the                 Committee.
: b. Need for the Committee.


This                   Committee                                     has                   been                   established                                       to               achieve                             wider participation                                             in               the                 selection                                 process                             for                     lawyer members                                 of               the                   Panel.                                                           The                   need                     for                     the                   Committee                                   was described                                 in             NRC's                         report                         to             Congress                                         (NUREG-0548)                                         in April                       1979                       in             response                               to               an               Authorization                                           Act                   requirement.
This Committee has been established to achieve wider participation in the selection process for lawyer members of the Panel. The need for the Committee was described in NRC's report to Congress (NUREG-0548) in April 1979 in response to an Authorization Act requirement.
P.L.                             95-601                         directed                               the                 Commission                                         to                 "undertake                                         a comprehensive                                               review                         of                 the                 existing                             process                             for selection                                 and                   training                               of             members                                 of                 the                 Atomic                           Safety and                 Licensing                               Board,                                 including,                                           but               not                   limited                               to,                       the selection                                 criteria,                                           including                                 qualifications,                                                         the selection                               procedures,                                           and                   the                   training                             programs                                   for Board                     members."                                                                   In                 its               report,                                     the                   Commission                                       concluded that                     its               needs                     were                     best               met                     by                   bringing                               into                     the selection                               process                           viewpoints                                         from                       NRC's                           legal                     offices and                 from                       outside                             the                         NRC                 and                   outside                             the                 Federal                           government as               well.                                                     The                   Commission                                       continues                                   to               believe                               that active                             participation                                           by                       a                   panel                       of               experts,                                     including non-NRC                           personnel,                                           is             essential.
P.L. 95-601 directed the Commission to "undertake a comprehensive review of the existing process for selection and training of members of the Atomic Safety and Licensing Board, including, but not limited to, the selection criteria, including qualifications, the selection procedures, and the training programs for Board members." In its report, the Commission concluded that its needs were best met by bringing into the selection process viewpoints from NRC's legal offices and from outside the NRC and outside the Federal government as well. The Commission continues to believe that active participation by a panel of experts, including non-NRC personnel, is essential.
: c.                   Balance                         of             Membership.
: c. Balance of Membership.


The                   Commission                                       has                   appointed                               members                                 to                 this                   Committee who                   have                       diverse                                 legal                       backgrounds                                     and                   careers.                                                             The non-NRC                         members                                   are                 chosen                           from                       other                       government                                       agencies, from                         those                         in             private                                 law               practice,                                         and                     from                         law               professors acquainted                                 with                   the                 adjudicative                                           process.                                                             The                   present 2
The Commission has appointed members to this Committee who have diverse legal backgrounds and careers. The non-NRC members are chosen from other government agencies, from those in private law practice, and from law professors acquainted with the adjudicative process. The present 2


membership                                       from                       outside                             the                   Commission                                       represents                                     the viewpoints                                       of                 the                 regulated                                 utilities                                   and                     the                   intervenors as               well                   as                 those                       who                   have                       no                   association                                     with                     the nuclear                           bar.                                                   The                     four                               NRC               members                                   represent                                 the                 Office of                 the                 General                           Counsel,                                     the                 Office                         of               the                 Exec~tive Legal                       Director,                                         the                 Atomic                             Safety                         ~nd                     Licensing                               Board Panel                       and                   the               Atomic                           Safety                           and                   Licensing                               Appeal                       Board.
membership from outside the Commission represents the viewpoints of the regulated utilities and the intervenors as well as those who have no association with the nuclear bar. The four NRC members represent the Office of the General Counsel, the Office of the Exec~tive Legal Director, the Atomic Safety ~nd Licensing Board Panel and the Atomic Safety and Licensing Appeal Board.
: d.                                                                       Frequency                                 of           Meetings.
: d. Frequency of Meetings.


This                   Committee                                       is           utilized                                 by                   the                   Commission                                     as               needed to               fill                     Licensing                               Board                       Panel                     vacancies.                                                                     The                     frequency of           meetings                                 varies                             directly                               with                   the                 number                           of               lawyer vacancies                                     to             be                 filled                         during                           the                 course                         of                 a                   year                       and does                     not                   have                             a                     direct                         bearing                           on                 the                 question                             of whether                             the                 Committee                                     should                         be                 continued.                                                                 It           is anticipated                                       that                 vacancies                                   will                     continue                               to               occur                     at                 a rate                   which                     would                       result                         in             about                         4-6                 meetings                                 per                 year.
This Committee is utilized by the Commission as needed to fill Licensing Board Panel vacancies. The frequency of meetings varies directly with the number of lawyer vacancies to be filled during the course of a year and does not have a direct bearing on the question of whether the Committee should be continued. It is anticipated that vacancies will continue to occur at a rate which would result in about 4-6 meetings per year.
: e.                                                                     Effect                         of               Committee                                   Advice                           on               Agency                         Operations.
: e. Effect of Committee Advice on Agency Operations.


The                 Committee's                                           primary                               purpose                             is               to                 screen                         lawyer candidates                                   and                     to               submit                           names                             to                 the                 Commission                                       for consideration                                           and                   final                         selection.                                                                   The                   Commission utilizes                                     the                 results                             of                 the                   Committee's                                             screening activity                                     in                 a                     direct                       way,                               filling                               its                 vacancies                                     from among                           those                     names                           submitted                                   by                   the                 Committee.
The Committee's primary purpose is to screen lawyer candidates and to submit names to the Commission for consideration and final selection. The Commission utilizes the results of the Committee's screening activity in a direct way, filling its vacancies from among those names submitted by the Committee.
: f.                                                                                             Why                 Recommendations                                                     and                     Information                                         Cannot                         be                 Obtained from                       Other                         Sources.
: f. Why Recommendations and Information Cannot be Obtained from Other Sources.


Prior                       to               establishment                                             of               this                     Committee                                     in               1980,                             the Chairman                               and                 other                     officials                                   of                 the                 Licensing                               Board Panel                       performed                                   all                 functions                                     relating                               to               screening                                 and selection                               of               lawyer                         members                                 of               the                 Panel.                                                         The                     Commission, however,                                       believed                                 that                     there                         should                         be               wider                       involvement in             the                 screening                               process,                                     particularly                                           by                 others                         outside the                   Panel                         itself                       with                   experience                                   in               the                 adjudicative process.                                                             By                   expanding                                 the                   selection                               process                             to                 include both                     intra-agency                                           and                 non-governmental                                                       participation                                       1 the                 Commission                                       could                       thereby                               obtain                           the                 viewpoints                                       of those                       having                         more                       diverse                                 legal                       backgrounds                                     and                   careers.
Prior to establishment of this Committee in 1980, the Chairman and other officials of the Licensing Board Panel performed all functions relating to screening and selection of lawyer members of the Panel. The Commission, however, believed that there should be wider involvement in the screening process, particularly by others outside the Panel itself with experience in the adjudicative process. By expanding the selection process to include both intra-agency and non-governmental participation 1 the Commission could thereby obtain the viewpoints of those having more diverse legal backgrounds and careers.
There                       are                 no                 sources                           other                       than                       the                   Committee                                   which could                     be               utilized                                   in               this                     fashion                             with                     the                   combination of             viewpoints                                       and                   experience                                   needed                           to               ensure                           that                   the broadest                           possible                             perspective                                           has                   been                     achieved                                 in selecting                               candidates                                   for                   the                 Licensing                               Board                     Panel.
There are no sources other than the Committee which could be utilized in this fashion with the combination of viewpoints and experience needed to ensure that the broadest possible perspective has been achieved in selecting candidates for the Licensing Board Panel.
3
3
: g.                                                                       Degree                       of               Duplication                                     of             Effort.
: g. Degree of Duplication of Effort.


The                   efforts                           of               this                     Committee                                     are                   not                   duplicated                                   by other                       committees                                       or             agencies                               within                           the                 government.
The efforts of this Committee are not duplicated by other committees or agencies within the government.
: h.                   Relationship                                       of             Annual                           Costs                           to                 the                 Advice                           Provided.
: h. Relationship of Annual Costs to the Advice Provided.


The                   cost                   of               this                   Committee                                     is             approximately                                                 $6,000                       per year.                                                         This                     cost                   is           quite                       small                           compared                                   to                 the                 services rendered                               to               the                 agency                           by                   the                 Committee                                   members                                   in             this critic al               screening                               proces             *s.
The cost of this Committee is approximately $6,000 per year. This cost is quite small compared to the services rendered to the agency by the Committee members in this critic al screening proces *s.
INTERAGENCY                   REPOfffS CONTROL ANNUAL                                 COM..-rlEHENSIVE   REVIEW                                                                                                                                                                                                                                                 NUMBER
INTERAGENCY REPOfffS CONTROL ANNUAL COM..-rlEHENSIVE REVIEW NUMBER


OF     FEDERAL             ADVISORY                                 COMMITTEE                                                                                                                                                                                                                                                                                   0264-GSA-AN
OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN


INSTRUCT                     10 NS:       Complete         one                     form           for each                 committee                     in   existence     at* the *e-nd           of -t-he c     a     iendar       year               being         reported.-         ft additional     space               is*
INSTRUCT 10 NS: Complete one form for each committee in existence at* the *e-nd of -t-he c a iendar year being reported.- ft additional space is*
required, attach         a         separate sheet of   paper   and                   cite approp           _riate item numbe                                           r._ls).
required, attach a separate sheet of paper and cite approp _riate item numbe r._ls).
: 1. DEPARTMENT             OR     AGENCY                                                                                                                                                                                                                                                                                                                                                                                             2. CALENDAR           YEAR U.S.                           Nuclear                             Regulatory                                     Conunission                                                                                                                                                                                                                                                                                                                         1980
: 1. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U.S. Nuclear Regulatory Conunission 1980
: 3. NAME     OF   COMMITTEE           (and                 1ubcommittee,                               if appropriate)                                                                                                                                                                                                                                                                                                             4. DATE     ESTABLISHED             OR     LAST REESTABLISHED                 OR       RENEWED Screening                                         Comrni ttee                     for                   Technical                               Vacancies                                 on                 the                                                                                                                                                                                                                       <m           0
: 3. NAME OF COMMITTEE (and 1ubcommittee, if appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHED OR RENEWED Screening Comrni ttee for Technical Vacancies on the <m 0
* t recent) Licensin                                                       Board                         Panel                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   February                                 21,                         1980
* t recent) Licensin Board Panel February 21, 1980
* 5 .       MEETING               EXEMPTIONS                     *_                   For           closed     or         partially closed     meetings,   list for   each           -     meeting   the.*date and                     number(s)                           ofalfGo vern*me     *nTm the Sunshine             Act   (5       U.S.C.                       552b)             exemptions                         used. ----                                         -                                 -                               ..                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             ---*                                                   -
* 5. MEETING EXEMPTIONS *_ For closed or partially closed meetings, list for each - meeting the.*date and number(s) ofalfGo vern*me *nTm the Sunshine Act (5 U.S.C. 552b) exemptions used. ---- - -.. ---* -
DATE       OF   MEETING                                                                                                               NUMBER(S)                     OF   EXEMPTIONS               USED                                                                                                                 DATE     OF   MEETING                                                                                                                   NUMBER(S)                     OF     EXEMPTIONS         USED
DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED
: a.     May                     30,                         1980                                                                                                                                                                                                                                                                                                                                                                                                                           6                                                                                                                                                                                                                                                                                                                                           e.
: a. May 30, 1980 6 e.


b   .     June                       26-27,                                 1980                                                                                                                                                                                                                                                                                                     6                                                                                                                                                                                                                                                                                           f.
b. June 26-27, 1980 6 f.


c     . August                           26,                           1980                                                                                                                                                                                                                                                                                                                                 6                                                                                                                                                                                                                                                                                                                                             g.
c. August 26, 1980 6 g.


d     . Nov.                               13-14,                               1980                                                                                                                                                                                                                                                                                                     6                                                                                                                                                                                                                                                                                                                                             h.
d. Nov. 13-14, 1980 6 h.
: 6. ESTABLISHMENT               AUTHORITY                           FOR     COMMITTEE           (Mark           "X"     in appropriate           bo.x)
: 6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark "X" in appropriate bo.x)
D a.       Specifically di~ected by                   law                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             GJ   c     . Agency                     authority D b.         Authorized       by                   law                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         D d. Presidential directive
D a. Specifically di~ected by law GJ c. Agency authority D b. Authorized by law D d. Presidential directive
: 7. AGENCY           RECOMMENDATION                   FOR     COMMITTEE           (Mark           "X"     in   appropriate           bo.x)
: 7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" in appropriate bo.x)
D a     . Terminate                                                                                                                                                                                                                                                                                                                                                                                                       ~               b         . Continue
D a. Terminate ~ b. Continue
: 8. IF   ITEMS     6(a)             AND   7(a)             ARE       MARKED,         ANSWER                 THE     FOLLOWING                     QUESTIONS                     :
: 8. IF ITEMS 6(a) AND 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS :
YES                                                   NO                                                                                                                                                                                                                                 YES                                                 NO
YES NO YES NO
: a.                   Is   legislation required to   terminate? ...................             . ....   ..   ...... . t-----+---i                                                                               c     .       Is such             legislation pending?               ..........       ..........     . .. ....   .. ...... .                                                                                                                                                         t----+---1
: a. Is legislation required to terminate?................................. t-----+---i c. Is such legislation pending?.................................... t----+---1
: b.                 Is such             legislation contemplated?                                 .......     ............         ... . .. ..   ........                                                                                                                                                                                                                                                                                                                                                   d   . Has       such             legislation been                 enacted?                 .. .... ..   ................   .
: b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................
: 9. IF   ANY       ANSWER                   IN     ITEM     8(a)             THROUGH                       (d)       IS   MARKED         "NO",     PROVIDE                     A       BRIEF         EXPLANATION
: 9. IF ANY ANSWER IN ITEM 8(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION
: 10.     IF   THE     ANSWER                 TO       ITEM     8(c)           OR           (d)         IS   MARKED           "YES",             PROVIDE                   THE       FOLLOWING                       INFORMATION
: 10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION
: a. BILL   OR     PUBLIC                   LAW             NUMBER                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         b.         PROPOSED           OR     EFFECTIVE                   DATE
: a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE


-                     11. IF     ITEM     6(b)             OR     l;1c)AND     i{a)                                 12.     IF     ITEMS       6(d)     AND   7(a)             ARE     MARKED,         PROVIDE                       A       BRIEF         EXPLANATION ARE     MARKED,           PROVIDE                   THE PROPOSED           OR     EFFECTIVE DATE
- 11. IF ITEM 6(b) OR l;1c)AND i{a) 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE
: 13. IF   ITEM       7(b)                 IS     MARKED,           ATTACH           A     JUSTIFICATION                         STATEMENT         TO   THIS       FORM       USING                 NUMBERED                     BOND     SHEETS       WITH               ITEMS       1, 2, AND       3 ON     EACH     SHEET.             THE   JUSTIFICATION                         SHOULD:
: 13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS 1, 2, AND 3 ON EACH SHEET. THE JUSTIFICATION SHOULD:


a       .     Describe how                   the committee               accomplishes               its purpose.
a. Describe how the committee accomplishes its purpose.
: b.               State wh         y             there is a         compelling           need         for the committee.
: b. State wh y there is a compelling need for the committee.
: c.                 Describe the balance                         of   membership             in terms of   points of view represented and                   functions                   performed.
: c. Describe the balance of membership in terms of points of view represented and functions performed.


d . Describe the frequency                       of meetings and                   the relevance     to     continuing                                 the committee             .
d. Describe the frequency of meetings and the relevance to continuing the committee.
: e.     Describe the effect of committee             reports, advice,     or     recommendations                                                           on                       agency                               operations     .         .
: e. Describe the effect of committee reports, advice, or recommendations on agency operations..
: f.         Explain         why                   the advice   or     information                       cannot                                         be           obtained                   from         other sources.
: f. Explain why the advice or information cannot be obtained from other sources.
: g.       Explain           any                         duplication             of effort with other committees,       within the agency                               , or     with other agencies.
: g. Explain any duplication of effort with other committees, within the agency, or with other agencies.


h . Describe the relationship of the cost     of the committee           to   the advice   or     information                         provided.
h. Describe the relationship of the cost of the committee to the advice or information provided.


GENERAL         SERVICES                 ADMINISTRATION                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               STANDARD             FORM     292   (12-80) Prescribed     by               GSA
GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Prescribed by GSA


                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ,FPM R     101-6.10 USNRC                 -                                   Screening                               Committee                                     for                   Technical Vacancies                                 on                   the                 Licensing                               Board                     Panel
,FPM R 101-6.10 USNRC - Screening Committee for Technical Vacancies on the Licensing Board Panel
: a.                                                                                                   How               the                 Committee                                   Accomplishes                                             its                 Purpose.
: a. How the Committee Accomplishes its Purpose.


This                     Committee                                     performs                                   its             mission                               by                   assisting                                 the Nuclear                             Regulatory                                     Commission                                       in             the                   selection                               of candidates                                   to               fill                     technical                               member                             vacancies                                   on                 the Atomic                           Safety                           and                 Licensing                               Board                     Panel.                                                         The                   Committee evaluates                                       the                 information                                         submitted                                   by                 or               on                 behalf                       of each                 candidate,                                           seeks                         further                               information                                         as               necessary, interviews                                         the                 candidates,                                             contacts                               references,                                             and generally                                   performs                                 all               other                       tasks                       necessary                                   in               the process                           of               assuring                               the                   Commission                                         that                     the                 broadest possible                               perspective                                         has                 been                     achieved                                   in               selecting technical                                 candidates                                   for                     the                   Panel.                                                       Following                               completion of             the                 process,                                       the                 Committee                                       submits                                 the                 names                           of three                       candidates                                   to               the                 Commission                                         for                     its               consideration.
This Committee performs its mission by assisting the Nuclear Regulatory Commission in the selection of candidates to fill technical member vacancies on the Atomic Safety and Licensing Board Panel. The Committee evaluates the information submitted by or on behalf of each candidate, seeks further information as necessary, interviews the candidates, contacts references, and generally performs all other tasks necessary in the process of assuring the Commission that the broadest possible perspective has been achieved in selecting technical candidates for the Panel. Following completion of the process, the Committee submits the names of three candidates to the Commission for its consideration.
: b.                                                                       Need                     for                   the                   Committee.
: b. Need for the Committee.


This                     Committee                                     has                   been                   established                                     to             achieve                             wider participation                                             in               the                 selection                                 process                               for                     technical members                                 of               the                 Panel.                                                         The                   need                     for                     the                 Committee                                 was described                                 in             NRC's                         report                         to               Congress                                         (NUREG-0548)                                         in April                       1979                       in             response                               to               an               Authorization                                           Act                   requirement.
This Committee has been established to achieve wider participation in the selection process for technical members of the Panel. The need for the Committee was described in NRC's report to Congress (NUREG-0548) in April 1979 in response to an Authorization Act requirement.
P.L.                             95-601                         directed                               the                 Commission                                       to                 "undertake                                       a comprehensive                                               review                         of                 the                 existing                             process                             for selection                                 and                 training                               of             members                                   of                 the               Atomic                           Safety and                 Licensing                               Board,                               including,                                         but                 not                   limited                               to,                         the selection                               criteria,                                         including                                 qualifications,                                                         the selection                                 procedures,                                             and                   the                   training                             programs                                   for Board                     members."                                                                   In                 its               report,                                     the                   Commission                                     concluded that                   its               needs                     were                     best               met                     by                 bringing                               into                     the selection                               process                         viewpoints                                         from                       NRC's                         technical                                 staff and                   from                       outside                             the                       NRC               and                   outside                             the                   Federal                         government as             well.                                                       The                   Commission                                       continues                                     to               believe                             that active                             participation                                           by                     a                     panel                     of                 experts,                                     including non-NRC                           personnel,                                           is               essential.
P.L. 95-601 directed the Commission to "undertake a comprehensive review of the existing process for selection and training of members of the Atomic Safety and Licensing Board, including, but not limited to, the selection criteria, including qualifications, the selection procedures, and the training programs for Board members." In its report, the Commission concluded that its needs were best met by bringing into the selection process viewpoints from NRC's technical staff and from outside the NRC and outside the Federal government as well. The Commission continues to believe that active participation by a panel of experts, including non-NRC personnel, is essential.
: c.                                                                   Balance                         of             Membership.
: c. Balance of Membership.


The                 Commission                                       has                   appointed                               members                                   to                 this                     Committee who                   have                         diverse                               scientific                                   backgrounds                                     and                   careers.
The Commission has appointed members to this Committee who have diverse scientific backgrounds and careers.
The                 non-NRC                         members                                 are                 chosen                           from                       among                             those                     whose expertise                                 covers                                   a                     variety                                 of                 scientific                                     and                   engineering disciplines.                                                                       The                   present                         membership                                       from                       outside                             the Commission                                       includes                                     a                     person                           associated                                 with                     the                 nuclear 2
The non-NRC members are chosen from among those whose expertise covers a variety of scientific and engineering disciplines. The present membership from outside the Commission includes a person associated with the nuclear 2


industry,                                                   a                     person                         associated                                 with                     intervenors,                                                   and                       a third                     person,                               who                     is           not                 affiliated                                   with                     the                         NRC, nuclear                             industry                                 or               intervenors.                                                                             The                           NRC             members                                 are technical                                   representatives                                                     of                 the               Atomic                             Safety                           and Licensing                               Board                       Panel,                                 the                 Atomic                             Safety                             and                   Licensing Appeal                           Board,                               and                   the               Office                         of               Nuclear                             Reactor                           Regulation.
industry, a person associated with intervenors, and a third person, who is not affiliated with the NRC, nuclear industry or intervenors. The NRC members are technical representatives of the Atomic Safety and Licensing Board Panel, the Atomic Safety and Licensing Appeal Board, and the Office of Nuclear Reactor Regulation.
: d.                   Frequency                                 of             Meetings.
: d. Frequency of Meetings.


This                     Committee                                       is           utilized                                 by                     the                   Commission                                       as               needed to                 fill                     Licensing                               Board                     Panel                       vacancies.                                                                     The                     frequency of           meetings                                 varies                             directly                                 with                     the                 number                         of               technical member                             vacancies                                     to             be                 filled                         during                           the                 course                       of                 a year                     and                 does                     not                 have                           a                     direct                         bearing                           on                   the                 question of             whether                               the               whether                             the                 Committee                                     should                         be                 continued.
This Committee is utilized by the Commission as needed to fill Licensing Board Panel vacancies. The frequency of meetings varies directly with the number of technical member vacancies to be filled during the course of a year and does not have a direct bearing on the question of whether the whether the Committee should be continued.
It           is             anticipated                                       that                   vacancies                                   will                   continue                               to             occur at               a                     rate                 which                     would                     result                           in               about                         4-6               meetings                                 per year.
It is anticipated that vacancies will continue to occur at a rate which would result in about 4-6 meetings per year.
: e.                                                                     Effect                         of               Committee                                   Advice                           on               Agency                         Operations.
: e. Effect of Committee Advice on Agency Operations.


The                   Committee's                                           primary                               purpose                           is             to                 screen                         technical candidates                                     and                     to               submit                         names                             to                 the                 Commission                                       for consideration                                           and                   final                         selection.                                                                   The                   Commission utilizes                                   the                 results                             of               the                 Committee's                                             screening activity                                     in                 a                     direct                       way,                               filling                               its               vacancies                                     from among                         those                     names                             submitted                                   by                   the                 Committee.
The Committee's primary purpose is to screen technical candidates and to submit names to the Commission for consideration and final selection. The Commission utilizes the results of the Committee's screening activity in a direct way, filling its vacancies from among those names submitted by the Committee.
: f.                                                                                               Why                 Recommendations                                                   and                     Information                                         Cannot                         be               Obtained from                     Other                       Sources.
: f. Why Recommendations and Information Cannot be Obtained from Other Sources.


Prior                       to           establishment                                             of               this                     Committee                                       in               1980,                             the Chairman                               and                 other                     officials                                 of                 the                   Licensing                             Board Panel                       performed                                   all                 functions                                     relating                                 to                 screening                               and selection                                 of               technical                               members                                 of               the                 Panel.                                                       The Commission,                                                 however,                                       believed                                 that                     there                         should                         be wider                       involvement                                             in               the                   screening                               process,                                     particularly by               others                         outside                             the                 Panel                       itself                     who                   may                       be               drawn from                       private                               scientific                                   or               engineering                                       firms                             and                     from university                                           faculties.                                                                                   By                   expanding                                 the                   selection process                             to               include                           both                     intra-agency                                         anc                     non-governmental participation,                                                       the                 Commission                                       could                       thereby                             obtain                         the viewpoints                                       of                   those                     having                           more                         diverse                               backgrounds                                       and careers.                                                             There                       are                 no                 sources                             other                       than                     the                 Committee which                       could                     be               utilized                                   in                 this                     fashion                           with                     the                 combination of             viewpoints                                       and                 experience                                   needed                           to               ensure                         that                     the broadest                             possible                               perspective                                         has                   been                     achieved                                   in selecting                               candidates                                   for                     the                 Licensing                               Board                       Panel.
Prior to establishment of this Committee in 1980, the Chairman and other officials of the Licensing Board Panel performed all functions relating to screening and selection of technical members of the Panel. The Commission, however, believed that there should be wider involvement in the screening process, particularly by others outside the Panel itself who may be drawn from private scientific or engineering firms and from university faculties. By expanding the selection process to include both intra-agency anc non-governmental participation, the Commission could thereby obtain the viewpoints of those having more diverse backgrounds and careers. There are no sources other than the Committee which could be utilized in this fashion with the combination of viewpoints and experience needed to ensure that the broadest possible perspective has been achieved in selecting candidates for the Licensing Board Panel.
3
3
: g.                   Degree                         of               Duplication                                     of               Effort.
: g. Degree of Duplication of Effort.


The                   efforts                             of               this                     Committee                                     are                 not                 duplicated                                 by other                       committees                                         or             agencies                               within                           the                 government.
The efforts of this Committee are not duplicated by other committees or agencies within the government.
: h.                   Relationship                                       of             Annual                         Costs                           to                 the                 Advice                           Provided.
: h. Relationship of Annual Costs to the Advice Provided.


The                   cost                   of               this                   Committee                                       is             approximately                                                 $6,000                         per year.                                                       This                     cost                     is           quite                       small                           compared                                 to               the                   services rendered                               to               the                 agency                         by             _the                 Committee                                   members                                   in               this critical                               screening                             process.
The cost of this Committee is approximately $6,000 per year. This cost is quite small compared to the services rendered to the agency by _the Committee members in this critical screening process.
NUMBER INTERAGENCY                 REPORTS         CONTROL ANNUAL                                     COIVl   r rlEHENSIVE                 REVIEW OF     FEDERAL               ADVISORY                                 COMMITTEE                                                                                                                                                                                                                                                                                                                     0264-GSA-AN
NUMBER INTERAGENCY REPORTS CONTROL ANNUAL COIVl r rlEHENSIVE REVIEW OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN


INSTRUCTIONS                           :     Complete       one                     form           for   each                 committee                   in     existence at   the end         -of the   ca             -lendar   year               being       reportea ~ ff iiad1ti6nalspace         is*
INSTRUCTIONS : Complete one form for each committee in existence at the end -of the ca -lendar year being reportea ~ ff iiad1ti6nalspace is*
required, attach         a         separate sheet of paper   and                   cite appropriate     item number                                   _ls_).                                                                                                                                                                                                                           _                       _         _             _       .             __ _
required, attach a separate sheet of paper and cite appropriate item number _ls_). _ _ _ _. __ _
: l. DEPARTMENT             OR     AGENCY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 2 . CALENDAR           YEAR U.S.                             Nuclear                             Regulatory                                     Commission                                                                                                                                                                                                                                                                                                                                                                               1980
: l. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U.S. Nuclear Regulatory Commission 1980
: 3. NAME     OF   COMMITTEE           (and                 1ubcommittee                                 ,   if appropriate)                                                                                                                                                                                                                                                                                                                                                     4   . DATE     ESTABLISHED             OR     LAST REESTABLISHED                 OR     RENEWED Advisory                                   Committee                                     on                 the                 Medical                             Uses                     of                 Isotopes                                                                                                                                                                                                                                                   January                                 30,                         1981 (most           recent)
: 3. NAME OF COMMITTEE (and 1ubcommittee, if appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHED OR RENEWED Advisory Committee on the Medical Uses of Isotopes January 30, 1981 (most recent)


5 .       MEET I NG           EX EMPT fO NS     -                           For         closed     or         partially closed       meetings,   I ist for   each
5. MEET I NG EX EMPT fO NS - For closed or partially closed meetings, I ist for each
* meeting* the-*date and                     numbei'(sl               o     r       a 1ffiovernme *nnn the Sunsh               ine         Act   (5     U.S.C.                         552b)             exemptions                         used       .                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   __           ____                 __                 _ ----                           .       --*-
* meeting* the-*date and numbei'(sl o r a 1ffiovernme *nnn the Sunsh ine Act (5 U.S.C. 552b) exemptions used. __ ____ __ _ ----. --*-
DATE       OF   MEETING                                                                                                               NUMBER(S)                         OF     EXEMPTIONS                 USED                                                                                                               DATE       OF   MEETING                                                                                                                     NUMBER(S)                       OF     EXEMPTIONS           USED
DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED


a       .                                                   None                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       e.
a. None e.


b         .                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       f.
b. f.


C.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               g.
C. g.


d   .                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       h .
d. h.
: 6. ESTABLISHMENT               AUTHORITY                           FOR       COMMITTEE           (Mark           "X       "       in   appropriate           box)
: 6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark "X " in appropriate box)
D a       . Specifically directed by                 law                                                                                                                                                                                                                                                                       ~               c     . Agency                     authority D b         . Authorized       by                   law                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       D d   . Presidential directive
D a. Specifically directed by law ~ c. Agency authority D b. Authorized by law D d. Presidential directive
: 7. AGENCY           RECOMMENDATION                   FOR     COMMITTEE           (Mark           "X"     In         appropriate           box)
: 7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" In appropriate box)
D a       . Terminate                                                                                                                                                                                                                                                                                                                                                                                                     ~               b         . Continue
D a. Terminate ~ b. Continue
: 8. IF   ITEMS       6(a)             AND   7(a)             ARE     MARKED,         ANSWER                 THE   FOLLOWING                     QUESTIONS:
: 8. IF ITEMS 6(a) AND 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS:
YES                                                     NO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   YES                                                   NO
YES NO YES NO
: a.                   Is   legislation required to   terminate? ......     ..   ..   ..   .. .......   .. ..........       1--------i                                                                                                     c.               Is such             legislation pending           ?   ......   .. ..........     .. ......   .. ........       t-----+---t b         . Is   such               legislat ion               contemplated?                               ..........       ... ......     ..   .........         ..   ...                                                                                                                                                                                                                                                                                                                                               d   . Has       such             legislation been                 enacted               ? ......   .. .... .. ......... ..
: a. Is legislation required to terminate?................................. 1--------i c. Is such legislation pending ?.................................... t-----+---t b. Is such legislat ion contemplated?................................... d. Has such legislation been enacted ?.........................
: 9. IF   ANY       ANSWER                   IN     ITEM     S(a)           THROUGH                       (d)       IS   MARKED           "       NO",   PROVIDE                       A       BRIEF         EXPLANATION
: 9. IF ANY ANSWER IN ITEM S(a) THROUGH (d) IS MARKED " NO", PROVIDE A BRIEF EXPLANATION


10 . IF   THE       ANSWER                 TO       ITEM   8(c)             OR           (d)         IS   MARKED           "YES"           , PROVIDE                 THE       FOLLOWING                       INFORMATION
10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION
: a.         BILL   OR     PUBLIC                   LAW             NUMBER                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       b.         PROPOSED           OR     EFFECTIVE                     DATE
: a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE


-                   11. IF   ITEM     6(bf   O/[ !,{c)A""ND                       T(af                       12. IF   ITEMS     6(d)     AND   7(a)             ARE     MARKED,         PROVIDE                     A       BRIEF         EXPLANATION ARE     MARKED,           PROVIDE                   THE PROPOSED           OR       EFFECTIVE DATE
- 11. IF ITEM 6(bf O/[ !,{c)A""ND T(af 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE
: 13. IF     ITEM       7(b)           IS     MARKED,         ATTACH         A     JUSTIFICATION                           STATEMENT         TO   THIS       FORM       USING                 NUMBERED                     BOND   SHEETS       WITH               ITEMS       l, 2, AND       3 ON     EACH   SHEET.             THE   JUSTIFICATION                         SHOULD:
: 13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS l, 2, AND 3 ON EACH SHEET. THE JUSTIFICATION SHOULD:
: a.                   Describe how                 the committee           accomplishes             its purpose           .
: a. Describe how the committee accomplishes its purpose.


b           . State wh         y           there is a       compelling       need       for the committee.
b. State wh y there is a compelling need for the committee.


c     .       Describe the balance                         of membership           in terms of   points of   view represented and                   functions                   performed     .
c. Describe the balance of membership in terms of points of view represented and functions performed.
: d.       Describe the frequency                     of meetings and                   the relevance     to     continuing                               the committee             .
: d. Describe the frequency of meetings and the relevance to continuing the committee.
: e.       Describe the effect of committee           reports, advice     , or       recommendations                                                       on                       agency                               operations.
: e. Describe the effect of committee reports, advice, or recommendations on agency operations.
: f. Explain       why                   the advice   or     information                     cannot                                         be           obtained                   from         other sources.
: f. Explain why the advice or information cannot be obtained from other sources.
: g.           Explain         any                         duplication           of effort with other committees,       within the agency,                             or     with other agencies     .
: g. Explain any duplication of effort with other committees, within the agency, or with other agencies.
: h. Describe the relationship of the cost     of the committee           to the advice or     information                       provided.
: h. Describe the relationship of the cost of the committee to the advice or information provided.


GENERAL         SERVICES                 ADMINISTRATION                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               STANDARD               FORM       292   (12-80) Prescribed       by               GSA
GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Prescribed by GSA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ,   FPMR       101*6,10 INTERAGENCY                   REPORTS           CONTROL.
, FPMR 101*6,10 INTERAGENCY REPORTS CONTROL.
NUMBER ANNUAL                                 COW                                                           EHENSIVE                       REVIEW OF     FEDERAL           ADVISORY                               COMMITTEE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           0264-GSA-AN
NUMBER ANNUAL COW EHENSIVE REVIEW OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN


INSTRUCTIONS:                                 Complete       one                   form           for each                 committee               in             existence at   tt-ieend of   the ca         -lendar year               being       reported. Tfacfditi6nal spaca                         is required, attach         a       separate sheet of   paper   and                   cite appro           _pr_iate_ it_em           number0)                                 .       .
INSTRUCTIONS: Complete one form for each committee in existence at tt-ieend of the ca -lendar year being reported. Tfacfditi6nal spaca is required, attach a separate sheet of paper and cite appro _pr_iate_ it_em number0)..
: l. DEPARTMENT             OR     AGENCY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     2. CAL.ENOAR             YEAR U.S.                           Nuclear                             Regulatory                                       Commission                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               1980
: l. DEPARTMENT OR AGENCY 2. CAL.ENOAR YEAR U.S. Nuclear Regulatory Commission 1980
: 3. NAME     OF     COMMITTEE           (and                 1ubcommittee,                               If appropriate)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         4   . DATE     ESTABL.ISHED             OR     L.AST REESTABL.ISHED                 OR       RENEWED Advisory                                     Panel                         for                       the                   Decontamination                                               of               Three                     Mile                                                                                                                                                                       <mo,                     t       recentJ Island                                                   Unit                             2                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             November                                   10,                         1980
: 3. NAME OF COMMITTEE (and 1ubcommittee, If appropriate) 4. DATE ESTABL.ISHED OR L.AST REESTABL.ISHED OR RENEWED Advisory Panel for the Decontamination of Three Mile <mo, t recentJ Island Unit 2 November 10, 1980
: 5.           MEETING             EXEMPTiONS     -                           For           closed   or       partially closed     meetings,   list for each           -     meetrng* the.*date and                       numberrsJ                 oral I Government                   in the Sunshine           Act   (5         U.S.C             .         552b)             exemptions                       used       .                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             _   -                 * -**. *-   *             ----
: 5. MEETING EXEMPTiONS - For closed or partially closed meetings, list for each - meetrng* the.*date and numberrsJ oral I Government in the Sunshine Act (5 U.S.C. 552b) exemptions used. _ - * -**. *- * ----
* __                         .
* __.
DATE     OF   MEETING                                                                                                                     NUMBER(S)                         OF   EXEMPTIONS             USED                                                                                                                 DATE       OF   MEETING                                                                                                                     NUMBEA(S)                       OF     EXEMPTIONS       USED
DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBEA(S) OF EXEMPTIONS USED
: a.                                                                                         None                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     e.
: a. None e.
: b.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 f.
: b. f.


C.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 g.
C. g.
: d.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 h.
: d. h.


0   'X"'     In         appropriate           bo:c)
0 'X"' In appropriate bo:c)
: 6. ESTABL.ISHMENT                 AUTHORITY                             FOR       COMMITTEE           (Mark D a. SPecifically directed by                 law                                                                                                                                                                                                                                                                           ~                 c.           Agency                       authority D b         . Authorized       by                 law                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 D d   . Presidential directive
: 6. ESTABL.ISHMENT AUTHORITY FOR COMMITTEE (Mark D a. SPecifically directed by law ~ c. Agency authority D b. Authorized by law D d. Presidential directive
: 7. AGENCY           RECOMMENDATION                     FOR     COMMITTEE           (Mark           "X"'       in   appropriate           bo:c)
: 7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X"' in appropriate bo:c)
D a     . Terminate                                                                                                                                                                                                                                                                                                                                                                                                             ~             b.         Continue
D a. Terminate ~ b. Continue
: 8. IF   ITEMS       6(a)       ~       7(a)             ARE     MARKED,         ANSWER                 THE   FOLL.OWING                       QUESTIONS:
: 8. IF ITEMS 6(a) ~ 7(a) ARE MARKED, ANSWER THE FOLL.OWING QUESTIONS:
YES                                                       NO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   YES                                                         NO a       .       Is   legislation required to   terminate?   .......     .... . . ... .. ..... .. ........       1------1,------i                                                                                                           c     .       Is such                 legislation             pending           ?   ......   .........     ... . .. ....   ...........         1-----+---1 b         .     Is   such             legislation contemplated?                                   ...   ... ... .... ... ... .........     .......                                                                                                                                                                                                                                                                                                                                                         d   . Has       such             legislation been                 enacted?                 ........   . ... .. .....   . .... .
YES NO YES NO a. Is legislation required to terminate?................................. 1------1,------i c. Is such legislation pending ?.................................... 1-----+---1 b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................
: 9. IF~ ANSWER                   IN     ITEM     8(a)             THROUGH                       (d)         IS   MARKED         "NO",     PROVIDE                       A       BRIEF         EXPLANATION
: 9. IF~ ANSWER IN ITEM 8(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION


10 . IF   THE     ANSWER                 TO       ITEM   8(c)             OR             (d)         IS   MARKED           "YES",               PROVIDE                 THE       FOLLOWING                     INFORMATION
10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION
: a.         BILL   OR     PUBLIC                   LAW             NUMBER                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 b,         PROPOSED           OR     EFFECTIVE                     DATE
: a. BILL OR PUBLIC LAW NUMBER b, PROPOSED OR EFFECTIVE DATE


-                         11,     IF   ITEM     6(bfOR           6TcJA"NO                 71a)                                   12. IF     ITEMS     6(d)       AND   7(a)             ARE     MARKED,         PROVIDE                       A       BRIEF         EXPLANATION ARE     MARKED,           PROVIDE                   THE PROPOSED           OR     EFFECTIVE DATE
- 11, IF ITEM 6(bfOR 6TcJA"NO 71a) 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE
: 13. IF   ITEM       7(b)               IS     MARKED,           ATTACH         A     JUSTIFICATION                           STATEMENT           TO   THIS       FORM       USING                 NUMBERED                     BOND     SHEETS       WITH               ITEMS       l, ON     EACH     SHEET.             THE JUSTIFICATION                         SHOULD:                                                                                                                                                                                                                                                                                           2, ANO     3
: 13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS l, ON EACH SHEET. THE JUSTIFICATION SHOULD: 2, ANO 3


a       . Describe how                   the committee             accomplishes       its-purpose.-                         -
a. Describe how the committee accomplishes its-purpose.- -
: b.               State wh         y             there is a         compelling         need         for the committee.
: b. State wh y there is a compelling need for the committee.
c     . Describe the balance                         of   membership           in terms of   points of view represented and                   functions                 performed     .
c. Describe the balance of membership in terms of points of view represented and functions performed.
: d. Describe the frequency                     of meetings and                   the relevance   to     continuing                               the committee   .
: d. Describe the frequency of meetings and the relevance to continuing the committee.
: e. Describe the effect of committee             reports, advice     , or     recommendations                                                           on                       agency                                 operations         .
: e. Describe the effect of committee reports, advice, or recommendations on agency operations.
: f. Explain       why                   the advice   or     information                       cannot                                         be           obtained                   from         other sources.
: f. Explain why the advice or information cannot be obtained from other sources.
: g.         Explain         any                         duplication           of effort with other committees,     within the agency,                           or     with other agencies.
: g. Explain any duplication of effort with other committees, within the agency, or with other agencies.
: h. Describe the relationship of the cost   of the committee         to the advice or     information                       provided.
: h. Describe the relationship of the cost of the committee to the advice or information provided.


GENERAL         SERVICES           ADMINISTRATION                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           STANDARD               FORM     292   (12-80) Pre~crlbed             bY             GSA
GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Pre~crlbed bY GSA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      *,FPMR       101~.lO}}
*,FPMR 101~.lO}}

Revision as of 18:52, 4 October 2024

Letter to the National Archives and Records Service Director John F. Clancy, Jr. from the Advisory Committee Management Officer, John C. Hoyle Submitting the Nuclear Regulatory Commissions Annual Comprehensive Review of Advisory Committees
ML24093A066
Person / Time
Issue date: 04/16/1981
From: Hoyle J
NRC/SECY
To: Clancy J
US National Archives & Records Admin (NARA)
References
Download: ML24093A066 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 April 16, 1981

OFFICE OF THE SECRETARY

The Honorable John F. Clancy, Jr.

Director Committee Management Secretari~t National Archives and Records Service Washington, DC 20408

Dear Mr. Clancy:

In accordance with Section 7(b) of the Federal Advisory Committee Act (P.L.92-463), and the guidance referred to in your memorandum of February 25, 1981, the Nuclear Regulatory Commission hereby submits its annual comprehensive review of advisory committees in existence on December 31, 1980.

Sincerely,

on. Hyle Advisory Committee Management Officer

Enclosures:

1. SF 292 and Justification Statement for Advisory Committee on Reactor Safeguards
2. SF 292 and Justification Statement for Screening Committee for Lawyer Vacancies on the Licensing Board Panel
3. SF 292 and Justification Statement for Screening Committee for Technical Vacancies on the Licensing Board Panel
4. SF 292 for Advisory Committee en the Medical Uses of Isotopes
5. SF 292 for Advisory Panel for the Decontamination of Three Mile Island, Unit 2 INTERAGENCY REPORTS CONTROL ANNUAL COMt.. cHENSIVE REVIEW NUMBER

OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN

INSTRUCTIONS : Complete one form for each committee in existence.at frie e*nd -of -t:hec alendar year be ing reported: ffaadifional space is required, attach a separate sheet of paper and c ite appropriate item number (_ sJ. __ _

1. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U. S. Nuclear Regulatory Commission 1980
3. NAME OF COMMITTEE (and 1ubcommittee, If appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHEC OR RENEWED (mo,t recent)

Advisory Committee on Reactor Safeguards December l 980

5. MEETING EXEMPTIONS - For closed or partially closed meet ings, list for each - meeting the-*date and number(s ) 6ralrGover'nmentm the Sunshine Act (5 U.S.C. 552b) exemptions used. - *. - --*

DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED

a. e.

b. SEE ATH CHMENT "l II f.

c. g.

d. h.

6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark " X" in appropriate box)

~ a. Specifically directed by law D c. Agency authority 0 b. Author ized by law 0 d. Presidential directive

7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" in appropriate box)

D a. Term inate Li b. Continue

8. IF ITEMS 6(a) ANO 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS :

YES NO YES NO

a. Is legislation required to terminate?................................. 1-----4----l c. Is such legislation pending?.................................... 1----+---t b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................

9. IF~ ANSWER IN ITEM 8(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION

10. IF THE ANSWER TO ITEM 8(c ) OR (d) IS MARKED "YES", PROVIDE THE FOLLOW I NG INFORMATION
a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE

- 11. IF ITEM 6(b) OR 6(CrANO 71af 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROvi'DETHE PROPOSED OR EFFECTIVE DATE

13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BONO SHEETS WITH ITEMS l, 2, ANO 3 ON EACH SHEET. THE JUSTIFICATION SHOULD: SEE ATTACHMENT 2
a. Describe how the committee accomplishes (i:s-purpose. *
b. State why there is a compelling need for the committee.

c. Describe the balance of membership in terms of points of view represented and functions performed.

d. Describe the frequency of meetings and the relevance to continuing the committee.

e. Describe the effect of committee reports, advice, or recommendations oo agency operatiom:- -
f. Explain why the advice or information cannot be obtained from other sources.
g. Explain any duplication of effort with other committees, within the age *ncy, or with other agencies.

h. Describe the relationship of the cost of the committee to the advice or information provided.

GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-110) Prescribed by GSA FPMR 101-<<i.10

  • I r'\\

USNRC - Advisory Committee on Reactor Safeguards - 1980

I. EXEMPTIONS USED FOR PARTLY CLOSED FULL ACRS MEETINGS HELD DURING CY-1980 Subsection lO(d), Public Law 92-463, 5 U. S ~C. 552b(c)--

( 4) To protect proprietary information

( 6) To protect information, the release of which would constitute a clearly unwarranted invasion of personal privacy.

(9) (B) To protect information, the premature disclosure of which would agency action.

  • be likely to significantly frustrate implementation of proposed

Full ACRS Meetings - (12) open. The remaining nine were primarily open except for short sessions Three of the twelve full ACRS meetings held during CY-80 were completely which were closed under the exemptions indicated below:

Full ACRS Meetings with Some Closed Sessions ill ill (9) (B)

l. Jan. 10-12 X X
2. Feb. 07-09 X
3. June 05-07 X X

4. July 10-12 X

5. Aug. 07-09 X
6. Sept. 04-06 X
7. Oct. 09-11 X X
8. Nov. 06-08 X
9. Dec. 04-06 X

SUMMARY

3 Full ACRS meetings completely open 3 Full ACRS meetings with exemptions (4) 3 Full ACRS meetings with exemptions (6) & 3 Full ACRS meetings with exemptions (6) (9) (B) (Re. Budget Info.)

~Full ACRS Meetings, CY-1980

ATTACHMENT l USNRC - Avisory Committee on Reactor Safeguards 2

II. EXEMPT!ONS USED FOR PARTLY CLOSED ACRS SUBCOMMITTEE MEETINGS DURING CY-1980 Subsection lO(d), Public Law 92-463, 5 U.S : C. 552b (c)--

( l ) To protect classified information.

( 4) To protect proprietary information.

(6) To protect information, the release of which would constitute a clearly unwarranted invasion of personal privacy.

(9) (B) To protect information, the premature disclosure of which would be likely to significantly frustrate implementation of proposed agency action.

ACRS Subcommittee Meetings - (91)

During CY-1980, 75 ACRS Subcommittee Meetings were open, 14 were partly closed, and 2 were completely closed under the exemptions indicated below:

ACRS Subcommittee Meetings ill ill ill (9) (B)

l. Jan. 09 Reactor Safety Research X (Closed)

2. Apr. 29 Reactor Fuel X 3. Apr. 30 Reliability & Probabilistic X Assessment
4. May 09 Class-9 Accident Consideration X
5. May 20 Reactor Operations X
6. May 21 Site Eval./Reactor Rad. Effects X
7. June 03 Reactor Safety Research X
8. June 17-18 Metal Components X
9. June 26 Safeguards & Security X X l O. June 26-27 Waste Management/Fuel Cycle x

11. Sept. 19 Ad Hoc Subcommittee: x (Closed)

ACRS-Rea ktor-S i c herhei tskommi ss ion (RSK)

12. Oct. 08 Dresden, Unit 1 x USNRC - Advisory Committee on Reactor Safeguards - 1980 3

ACRS Subcommittee Meetings (continued) ill ill ill (9) (B)

13. Nov. 21 Class-9 Accident Consideration X
14. Nov. 28-29 Three Mile Island, Unit l X 15. Dec. 03 Reactor Safety Research X
16. Dec. 03 Reliability & Probabilistic X Assessment

SUMMARY

2 Closed ACRS Subcommittee Meetings l Exemption (1) l Exemption (9) (B) (Re. Budget Info.)

14 Partly Closed ACRS Subcommittee Meetings l Exemptions (1) and (4) 10 Exemption (9) (B) (All Re. Budget Info.) 3 Ex em pt ion ( 4)

75 Open ACRS Subcommittee Meetings

91 ACRS Subcommittee Meetings, CY-1980

t.

USNRC - Advisory Committee on Reactor Safeguards - 1980

a. How the Committee Accomplishes its Purposes The Advisory Committee on Reactor Safeguards (ACRS), established in 1957 by statute, accomplishes its purposes by reviewing and reporting on safety studies and facility license applications referred to it; advising the NRC and the Congress on any potential hazards of proposed or existing nuclear power plants, and spent fuel reprocessing and storage facilities and the adequacy of proposed safety standards; and performing such other duties as the Commission or the Congress may request. The Committee conducts an annual review of the NRC Reactor Safety Research Program and reports to the Congress on the status of this program. The ACRS also reviews DOE nuclear facilities when requested by the Department of Energy. The full Committee normally meets once a month for a three-day session to consider projects, generic and special reviews, and criteria and regulatory guides that are ready for full Committee consideration. ACRS subcommittees meet as necessary with the license applicant, NRC Staff, and others to develop information for the Committee on the particular matter under review and to identify those matters warranting particular attention by the full Committee.

There were 91 subcommittee meetings in CY 1980. The Committee's report on applications for facility licenses, and on other matters, become a part of the record and are made available to the public, except for privileged or security material.

b. Compelling Need for Committee There is a compelling need for the ACRS because it provides for an

ATTACHMENT 2 USNRC - Advisory Committee on Reactor Safeguards - 1980 2

independent review of the potential hazards of proposed and existing U,S.

nuclear facilities and of proposed and existing nuclear safety standards and, therefore, provides protection for the public in the uses of nuclear tech nology and materials.

The frequent meetings of the ACRS provide an opportunity for the public to observe and participate in the regulatory process, and the Committee: reports provide a mechanism to inform the public and the Congress of the findings of an independent group of experts knowledgeable in reactor safety matters.

The compelling need for the Committee is supported by the findings of the Presidential Commission on the TMI-2 Incident (Kemeny Commission) which concluded that the Committee should be retained, and strengthened, to continue providing an independent technical check on safety matters.

c. Balance in Membership on ACRS The Nuclear Regulatory Commission, on the basis of the technical review functions outlined in the statutory mission of the Committee, appoints ACRS members from the scientific and engineering disciplines with three prerequisites in mind: outstanding sci~ntific and technical ability, balanced and mature judgment, and willingness to devote the time required (approximately 130 days each year) to the demanding work involved. The pool of persons so qualified is limited. At the end of 1980, the Commit tee included eight members from academic institutions, two employees of national laboratories and five members who have retired from active

V

~...

I USNRC - Advisory Com~ittee on Reactor Safeguards - 1980 3

employment with nuclear and non-nuclear backgrounds. There has been a conscious effort to obtain members trained in both nuclear and the non nuclear disciplines who have had considerabl~ experience in various fields needed to evaluate proposed construction and operation of nuclear power plants and related facilities. This permits and fosters a concentration

~

within the Committee of scientific and engineering proficiency, together with a diversity of viewpoints and perspectives, which provides assurance that adequate independent, open discussion and analysis of the potential hazards of nuclear reactors and the adequacy of safety standards can take place.

During 1980, the membership included those experienced in radioactive waste management, chemical processing of spent reactor fuel, electrical engineering, chemical engineering, civil engineering, materials engineering, mechanical engineering, nuclear engineering, reactor operations, heat transfer and fluid flow, reactor physics and probabilistic analysis. Anticipated membership needs include individuals knowledgeable in the areas noted above with increased emphasis on quantitative risk assessment experience.

To provide for public involvement in the nominating p~ocess for ACRS members, the NRC issues public announcements soliciting nominees when vacancies arise.

In the past, a large number of nominations have been received from the public, including organizations such as public interest groups and technical societies, USNRC - Advisory Committee on Reactor Safeguards - 1980 4

and we expect this interest to continue when future vacancies are announced. Further, the diversity of viewpoints presently represente~

by current ACRS members is broadly based from the standpoint of special fields of interest, employment experience and scientific or technical specialty. These membership characteristics provide the Committee with a balance of highly qualified tec~nical experts in the nuclear and non nuclear fields necessary to carry out the Committee ' s statutory re quirements.

d. Frequency of Meetings and Relevance The ACRS, its subcommittees and working groups held 103 meetings during 1980. The number of meetings held is directly related to the number of reactor projects referred by the Nuclear Regulatory Commission to the Committee for review; the number of generic issues which arose during the year; the number of criteria and guides referred to the Committee for re view and comment; the number of DOE and DOD reactor projects referred; and the number of special reviews requested by the NRC and Congress. The full Committee normally meets once a month for a three-day session to consider projects, generic and special reviews, and criteria and regulatory guides that are ready for full Committee consideration. ACRS subcommittees meet as necessary with license applicants, NRC Staff, and others to develop infonnation for the Committee on the particular matters under review and to identify those matters warranting particular attention by the full Committee.

If the Committee is to continue to meet the requirements of the statute which established it, and the later additions and amendments, it will need USNRC - Advisory Committee on Reactor Safeguards - 1980 5

to continue to meet at a similar frequency in the future.

e. Effect of Committee Reports on Agency Operations The ACRS reports and recommendations to the Commission have been used extensively in NRC policy fonnulation and decision making since estab-1 i shment of the agency on January 19, 1975. In those cases where a license application is submitted under Section 103 or designated facili ties under Section 104 of the Atomic Energy Act, an ACRS report is re quired by statute. *In each such case, the NRC Staff, following the receipt of an ACRS report, prepares a supplemental safety evaluation report which outlines in detail the actions the NRC Staff has or is taking to carry out the ACRS recommendations. These reports are entered into the public docket file for each facility case so they are available for use by parties to NRC licensing proceedings.

On several occasions, substantive restrictions and/or requirements have been imposed by the NRC on nuclear facility operations, including power level limitations, augmented test programs, and added engineered safety features, based on the recommendations of the Committee. Specific atten tion is given to ACRS recommendations with respect to other generic or selected safety issues and appropriate action is implemented by the NRC Staff. Additionally, ACRS recommendations are implemented in regulations, guides and regulatory policies and practices promulgated by the Commission.

For example, proposed NRC regulatory guides developed for po~1er reactors are not published for public comment until the comments of a designated USNRC - Advisory Committee on Reactor Safeguards - 1980 6

ACRS subcommittee are taken in account. The final guide is not promulgated for use until the ACRS has concurred. Other types of regulatory guides are referred to the Committee on a selective basis by NRC.

The action taken to implement specific ACRS recommendations regarding '

an individual licensing application is published in an NRC Staff Supple mentary Safety Evaluation Report for consideration at the related public licensing hearing. In addition, the status of ACRS recommendations, comments, and questions is monitored on a periodic basis using a detailed report to the ACRS from the NRC Staff relating point by point what Staff action has been taken or is planned on each ACRS recommendation. In addition, frequent status and final reports regarding resolution of ACRS comments and recommendations are given during monthly ACRS meetings and recorded in the minutes of these meetings. In the event the ACRS con siders NRC Staff action inadequate with respect to its recommendations, a mechanism is available to bring these matters directly to the attention of the Commissioners.

With regard to the development of proposed regulatory guides and criteria, the ACRS subcommittee and full Committee meetings provide a public forum where the opinion of interested technical groups or individuals and members of the public may be presented. [

[..

[..

In the area of reactor safety research, the ACRS annually examines the f..

f

USNRC - Advisory Committee on Reactor Safeguards - 1980 7

thrust and funding of the overall NRC safety research program and conducts in-depth discussions of the effectiveness of the eight major NRC research decision units and subelements. The conclusions of these reviews are reported to the Congress as mandated by Public Law 95-209. These con clusions are considered by Congress in the authorization of the NRC safety research budget. In addition, thi Commissioners have requested and the '

Committee provides a separate report on the NRC's proposed research budget prior to action on the budget by the Commission. The ACRS recently pro vided testimony to the House Committee on Interior and Insular Affairs Subcommittee on Energy and the Environment regarding the NRC authorization for its FY-1982 Reactor Safety Research Budget and on other budget matters.

In the area of policy formulation, the ACRS often suggests initiation of staff studies and participates in the formulation of technical policy on important safety issues. The Committee's overall knowledge and advice with respect to the resolution of speci'fic safety issues and generic issues is useful to the Commission both in decision making for individual cases and in program planning for the NRC Staff's resources. Additionally, the Committee's continuing review of both industrial and governmental research programs provides the valuable perspective of an independent body of technical experts with respect to the scope and content of the program and the assignment of priorities to individual research efforts.

f. Why ACRS Recommendations and Information Cannot be Obtained from Other Sources

As established by the Atomic Energy Act. of 1954, the Advisory Committee on USNRC - Advisory Committee on Reactor Safeguards - 1980 8

Reactor Safeguards is an independent organization which is mandated to perform certain specific functions and provide advice to the Nuclear Regulatory Commission with regard to the potential hazards of proposed or existing nuclear facilities and the adequacy of proposed reactor standards. The Committee is unique in that there exists no comparable body composed of acknowledged experts in the field of nuclear reactor safety whose Congressional mandate is to provide the Commission with independent advice in this area.[l] The Commission necessarily has its own expert staff on whom it relies in the day-to-day regulation of nuclear power facilities. However, there is no other advisory committee, either within the Commission or in other agencies with the current, broadly based knowledge of the ACRS which could be called upon for independent assessments of reactor safety issues.

In addition, since ACRS members are primarly part-t i me advisors with other full-time interests and activities in related fields, they bring to bear in an organized manner a breadth of experience and current technical knowl edge which would be difficult to duplicate with full-time government employees.

A continuing committee such as the ACRS also remains current with respect

[l] The Kemeny Commission recommended that the Committee members continue as part-time appointees and stated their belief that the independence and high quality of the members might be compromised by making them full-time Federal employees.

USNRC - Advisory Committee on Reactor Safeguards - 1980 9

to nuclear safety issues, including related reactor operating experience and safety research, and provides a collegial judgment regarding these issues that would be impossible to duplicate by use of individual, part time consultants on a case-by-case basis.

).

Through the ACRS, the public and the Congress are provided assurance that an independent technical review and evaluation of nuclear reactor projects and safety issues is accomplished and an opportunity for public input during ACRS meetings is assured.

g. Degree of Duplication of Effort As noted above, ACRS efforts are not duplicated by other committees or agen cies within the government. However, due to the independent nature of the Committee's statutory responsibilities, the ACRS review and that of its consultants does duplicate, to some degree, as intended by law, some aspects of the NRC Staff's review of applications for nuclear power faciltiy licenses and of the monitoring of operating reactors. In this regard, the ACRS effort provides an independent check of NRC regulatory activities which is largely directed at new and improved reactor safety features, an exploration of the basis for NRC Staff decisions as they relate to reactor safety, and assur ance that all factors that could endanger the public health and safety have been adequately considered in making licensing decisions.
h. Relationship of the Annual Costs of the ACRS to Advice and Information Provided

The direct cost of the ACRS activities in CY 1980 was approximately

$2,700,000. As noted earlier, the Committee conducted 103 meetings during

  • 4,

USNRC - Advisory Committee on Reactor Safeguards - 1980 10

CY 1980 and submitted 52 reports. Fifteen of these reports concerned generic nucler safety issues, eleven were reports to the NRC Chairman and Commissioners on specific safety issues and problems on which they had requested advice, six were related to the TMI-2 incident and corrective actions to be taken, six were related to licensing of specific nuclear facilities and six were related to' regulatory policy issues on which the Committee's advice was needed. There were two reports to Congress, one to meet the statutory requirements of PL 95-209 that the Committee annually conduct a study of the NRC Reactor Safety Research Program as mentioned earlier, and one to Congressman Udall on the subject of licensee event reports. The remaining six reports were directed to the NRC Executive Director for Operations regarding proposed regulatory guides, amendments to regulations and related matters.

In addition, members of the ACRS Fellowship Program (established by PL 95-209) prepared approximately 65 reports in 1980 on a variety of nuclear safety matters.

INTERAGENCY REPORTS CON i ROL NUMBER ANNUAL COIVll"'REHENSIVE REVIEW OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN

INSTRUCTIONS: Complete one form for each committee in ex istence a -t fhe e-nd o f fhe ca lenda~ year being reported. lfaad1fional space is*

required, attach a separate sheet of paper and cite appropriate i_tem number (s). _ _

1. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U.S. Nuclear Regulatory Commission 1980

3. NAME OF COMMITTEE (and 1ubcommittee, if appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHED OR RENEWED Screening Committee for Lawyer Vacancies on the /mo,trecentJ Licensing Board Panel February 21, 1980

5. MEET ING EXEMPT iONS - For closed or partially closed meetings, list for each - meeting-thE(date and numberCs) on1rGoveirhmerit 1n the Sunshine Act (5 U.S.C. 552b) exemptions used. **-* --- - - -- - -- * - *- - -

DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED

a. May 9, 1980 6 e.July 23-24, 1980 6

b. June 6, 1980 6 f. Dec. 18-19, 1980 6

C. June 12-13, 1980 6 g.

d. July 2, 1980 h.

6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark "X" in appropriate box) 0 a_ Specifically di;ected by law ~ c. Agency authority D b. Authorized by law 0 d. Presidential directive
7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" In appropriate box) 0 a. Terminate [iJ b. Continue
8. IF ITEMS 6(a) AND 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS:

YES NO YES NO a. Is legislation required to terminate?................................. 1-----+---l c. Is such legislation pending?.................................... 1-----+---l b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................

9. IF~ ANSWER IN ITEM S(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION

10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION
a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE
11. IF ITEM -6(b) OR 61C)AND 7la) 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE
13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS 1, 2, AND 3 ON EACH SHEET. THE JUSTIFICATION SHOULD:

a. Describe how the committee accomplishes *its-purpose.*

b. State wh y there is a compelling need for the committee.

c. Describe the balance of membership in terms of points of view represented and functions performed.

d. Describe the frequency of meetings and the relevance to continuing the committee.

e. Describe the effect of committee reports, advice, or recommendations on agency operations..
f. Explain why the advice or information cannot be obtained from other sources.
g. Explain any duplication of effort with other committees, within the agency, or with other agencies.
h. Describe the relationship of the cost of the committee to the advice or information provided.

GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Prescribed by GSA FPMR 101-6.10 USNRC - Screening Committee for Lawyer Vacancies on the Licensing Board Panel

a. How the Committee Accomplishes its Purpose.

This Committee performs its mission by assisting the Nuclear Regulatory Commission in the selection of candidates to fill lawyer vacancies on the Atomic Safety and Licensing Board Panel. The Committee evaluates the information submitted by or on behalf of each candidate, seeks further information as necessary, interviews the candidates, contacts references, and generally performs all other tasks necessary in the process of assuring the Commission that the broadest possible perspective has been achieved in selecting lawyer candidates for the Panel. Following completion of the process, the Committee submits the names of three candidates to the Commission for its consideration.

b. Need for the Committee.

This Committee has been established to achieve wider participation in the selection process for lawyer members of the Panel. The need for the Committee was described in NRC's report to Congress (NUREG-0548) in April 1979 in response to an Authorization Act requirement.

P.L.95-601 directed the Commission to "undertake a comprehensive review of the existing process for selection and training of members of the Atomic Safety and Licensing Board, including, but not limited to, the selection criteria, including qualifications, the selection procedures, and the training programs for Board members." In its report, the Commission concluded that its needs were best met by bringing into the selection process viewpoints from NRC's legal offices and from outside the NRC and outside the Federal government as well. The Commission continues to believe that active participation by a panel of experts, including non-NRC personnel, is essential.

c. Balance of Membership.

The Commission has appointed members to this Committee who have diverse legal backgrounds and careers. The non-NRC members are chosen from other government agencies, from those in private law practice, and from law professors acquainted with the adjudicative process. The present 2

membership from outside the Commission represents the viewpoints of the regulated utilities and the intervenors as well as those who have no association with the nuclear bar. The four NRC members represent the Office of the General Counsel, the Office of the Exec~tive Legal Director, the Atomic Safety ~nd Licensing Board Panel and the Atomic Safety and Licensing Appeal Board.

d. Frequency of Meetings.

This Committee is utilized by the Commission as needed to fill Licensing Board Panel vacancies. The frequency of meetings varies directly with the number of lawyer vacancies to be filled during the course of a year and does not have a direct bearing on the question of whether the Committee should be continued. It is anticipated that vacancies will continue to occur at a rate which would result in about 4-6 meetings per year.

e. Effect of Committee Advice on Agency Operations.

The Committee's primary purpose is to screen lawyer candidates and to submit names to the Commission for consideration and final selection. The Commission utilizes the results of the Committee's screening activity in a direct way, filling its vacancies from among those names submitted by the Committee.

f. Why Recommendations and Information Cannot be Obtained from Other Sources.

Prior to establishment of this Committee in 1980, the Chairman and other officials of the Licensing Board Panel performed all functions relating to screening and selection of lawyer members of the Panel. The Commission, however, believed that there should be wider involvement in the screening process, particularly by others outside the Panel itself with experience in the adjudicative process. By expanding the selection process to include both intra-agency and non-governmental participation 1 the Commission could thereby obtain the viewpoints of those having more diverse legal backgrounds and careers.

There are no sources other than the Committee which could be utilized in this fashion with the combination of viewpoints and experience needed to ensure that the broadest possible perspective has been achieved in selecting candidates for the Licensing Board Panel.

3

g. Degree of Duplication of Effort.

The efforts of this Committee are not duplicated by other committees or agencies within the government.

h. Relationship of Annual Costs to the Advice Provided.

The cost of this Committee is approximately $6,000 per year. This cost is quite small compared to the services rendered to the agency by the Committee members in this critic al screening proces *s.

INTERAGENCY REPOfffS CONTROL ANNUAL COM..-rlEHENSIVE REVIEW NUMBER

OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN

INSTRUCT 10 NS: Complete one form for each committee in existence at* the *e-nd of -t-he c a iendar year being reported.- ft additional space is*

required, attach a separate sheet of paper and cite approp _riate item numbe r._ls).

1. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U.S. Nuclear Regulatory Conunission 1980
3. NAME OF COMMITTEE (and 1ubcommittee, if appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHED OR RENEWED Screening Comrni ttee for Technical Vacancies on the <m 0
  • t recent) Licensin Board Panel February 21, 1980
  • 5. MEETING EXEMPTIONS *_ For closed or partially closed meetings, list for each - meeting the.*date and number(s) ofalfGo vern*me *nTm the Sunshine Act (5 U.S.C. 552b) exemptions used. ---- - -.. ---* -

DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED

a. May 30, 1980 6 e.

b. June 26-27, 1980 6 f.

c. August 26, 1980 6 g.

d. Nov. 13-14, 1980 6 h.

6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark "X" in appropriate bo.x)

D a. Specifically di~ected by law GJ c. Agency authority D b. Authorized by law D d. Presidential directive

7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" in appropriate bo.x)

D a. Terminate ~ b. Continue

8. IF ITEMS 6(a) AND 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS :

YES NO YES NO

a. Is legislation required to terminate?................................. t-----+---i c. Is such legislation pending?.................................... t----+---1
b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................
9. IF ANY ANSWER IN ITEM 8(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION
10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION
a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE

- 11. IF ITEM 6(b) OR l;1c)AND i{a) 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE

13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS 1, 2, AND 3 ON EACH SHEET. THE JUSTIFICATION SHOULD:

a. Describe how the committee accomplishes its purpose.

b. State wh y there is a compelling need for the committee.
c. Describe the balance of membership in terms of points of view represented and functions performed.

d. Describe the frequency of meetings and the relevance to continuing the committee.

e. Describe the effect of committee reports, advice, or recommendations on agency operations..
f. Explain why the advice or information cannot be obtained from other sources.
g. Explain any duplication of effort with other committees, within the agency, or with other agencies.

h. Describe the relationship of the cost of the committee to the advice or information provided.

GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Prescribed by GSA

,FPM R 101-6.10 USNRC - Screening Committee for Technical Vacancies on the Licensing Board Panel

a. How the Committee Accomplishes its Purpose.

This Committee performs its mission by assisting the Nuclear Regulatory Commission in the selection of candidates to fill technical member vacancies on the Atomic Safety and Licensing Board Panel. The Committee evaluates the information submitted by or on behalf of each candidate, seeks further information as necessary, interviews the candidates, contacts references, and generally performs all other tasks necessary in the process of assuring the Commission that the broadest possible perspective has been achieved in selecting technical candidates for the Panel. Following completion of the process, the Committee submits the names of three candidates to the Commission for its consideration.

b. Need for the Committee.

This Committee has been established to achieve wider participation in the selection process for technical members of the Panel. The need for the Committee was described in NRC's report to Congress (NUREG-0548) in April 1979 in response to an Authorization Act requirement.

P.L.95-601 directed the Commission to "undertake a comprehensive review of the existing process for selection and training of members of the Atomic Safety and Licensing Board, including, but not limited to, the selection criteria, including qualifications, the selection procedures, and the training programs for Board members." In its report, the Commission concluded that its needs were best met by bringing into the selection process viewpoints from NRC's technical staff and from outside the NRC and outside the Federal government as well. The Commission continues to believe that active participation by a panel of experts, including non-NRC personnel, is essential.

c. Balance of Membership.

The Commission has appointed members to this Committee who have diverse scientific backgrounds and careers.

The non-NRC members are chosen from among those whose expertise covers a variety of scientific and engineering disciplines. The present membership from outside the Commission includes a person associated with the nuclear 2

industry, a person associated with intervenors, and a third person, who is not affiliated with the NRC, nuclear industry or intervenors. The NRC members are technical representatives of the Atomic Safety and Licensing Board Panel, the Atomic Safety and Licensing Appeal Board, and the Office of Nuclear Reactor Regulation.

d. Frequency of Meetings.

This Committee is utilized by the Commission as needed to fill Licensing Board Panel vacancies. The frequency of meetings varies directly with the number of technical member vacancies to be filled during the course of a year and does not have a direct bearing on the question of whether the whether the Committee should be continued.

It is anticipated that vacancies will continue to occur at a rate which would result in about 4-6 meetings per year.

e. Effect of Committee Advice on Agency Operations.

The Committee's primary purpose is to screen technical candidates and to submit names to the Commission for consideration and final selection. The Commission utilizes the results of the Committee's screening activity in a direct way, filling its vacancies from among those names submitted by the Committee.

f. Why Recommendations and Information Cannot be Obtained from Other Sources.

Prior to establishment of this Committee in 1980, the Chairman and other officials of the Licensing Board Panel performed all functions relating to screening and selection of technical members of the Panel. The Commission, however, believed that there should be wider involvement in the screening process, particularly by others outside the Panel itself who may be drawn from private scientific or engineering firms and from university faculties. By expanding the selection process to include both intra-agency anc non-governmental participation, the Commission could thereby obtain the viewpoints of those having more diverse backgrounds and careers. There are no sources other than the Committee which could be utilized in this fashion with the combination of viewpoints and experience needed to ensure that the broadest possible perspective has been achieved in selecting candidates for the Licensing Board Panel.

3

g. Degree of Duplication of Effort.

The efforts of this Committee are not duplicated by other committees or agencies within the government.

h. Relationship of Annual Costs to the Advice Provided.

The cost of this Committee is approximately $6,000 per year. This cost is quite small compared to the services rendered to the agency by _the Committee members in this critical screening process.

NUMBER INTERAGENCY REPORTS CONTROL ANNUAL COIVl r rlEHENSIVE REVIEW OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN

INSTRUCTIONS : Complete one form for each committee in existence at the end -of the ca -lendar year being reportea ~ ff iiad1ti6nalspace is*

required, attach a separate sheet of paper and cite appropriate item number _ls_). _ _ _ _. __ _

l. DEPARTMENT OR AGENCY 2. CALENDAR YEAR U.S. Nuclear Regulatory Commission 1980
3. NAME OF COMMITTEE (and 1ubcommittee, if appropriate) 4. DATE ESTABLISHED OR LAST REESTABLISHED OR RENEWED Advisory Committee on the Medical Uses of Isotopes January 30, 1981 (most recent)

5. MEET I NG EX EMPT fO NS - For closed or partially closed meetings, I ist for each

  • meeting* the-*date and numbei'(sl o r a 1ffiovernme *nnn the Sunsh ine Act (5 U.S.C. 552b) exemptions used. __ ____ __ _ ----. --*-

DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED

a. None e.

b. f.

C. g.

d. h.

6. ESTABLISHMENT AUTHORITY FOR COMMITTEE (Mark "X " in appropriate box)

D a. Specifically directed by law ~ c. Agency authority D b. Authorized by law D d. Presidential directive

7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X" In appropriate box)

D a. Terminate ~ b. Continue

8. IF ITEMS 6(a) AND 7(a) ARE MARKED, ANSWER THE FOLLOWING QUESTIONS:

YES NO YES NO

a. Is legislation required to terminate?................................. 1--------i c. Is such legislation pending ?.................................... t-----+---t b. Is such legislat ion contemplated?................................... d. Has such legislation been enacted ?.........................
9. IF ANY ANSWER IN ITEM S(a) THROUGH (d) IS MARKED " NO", PROVIDE A BRIEF EXPLANATION

10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION

a. BILL OR PUBLIC LAW NUMBER b. PROPOSED OR EFFECTIVE DATE

- 11. IF ITEM 6(bf O/[ !,{c)A""ND T(af 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE

13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS l, 2, AND 3 ON EACH SHEET. THE JUSTIFICATION SHOULD:
a. Describe how the committee accomplishes its purpose.

b. State wh y there is a compelling need for the committee.

c. Describe the balance of membership in terms of points of view represented and functions performed.

d. Describe the frequency of meetings and the relevance to continuing the committee.
e. Describe the effect of committee reports, advice, or recommendations on agency operations.
f. Explain why the advice or information cannot be obtained from other sources.
g. Explain any duplication of effort with other committees, within the agency, or with other agencies.
h. Describe the relationship of the cost of the committee to the advice or information provided.

GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Prescribed by GSA

, FPMR 101*6,10 INTERAGENCY REPORTS CONTROL.

NUMBER ANNUAL COW EHENSIVE REVIEW OF FEDERAL ADVISORY COMMITTEE 0264-GSA-AN

INSTRUCTIONS: Complete one form for each committee in existence at tt-ieend of the ca -lendar year being reported. Tfacfditi6nal spaca is required, attach a separate sheet of paper and cite appro _pr_iate_ it_em number0)..

l. DEPARTMENT OR AGENCY 2. CAL.ENOAR YEAR U.S. Nuclear Regulatory Commission 1980
3. NAME OF COMMITTEE (and 1ubcommittee, If appropriate) 4. DATE ESTABL.ISHED OR L.AST REESTABL.ISHED OR RENEWED Advisory Panel for the Decontamination of Three Mile <mo, t recentJ Island Unit 2 November 10, 1980
5. MEETING EXEMPTiONS - For closed or partially closed meetings, list for each - meetrng* the.*date and numberrsJ oral I Government in the Sunshine Act (5 U.S.C. 552b) exemptions used. _ - * -**. *- * ----
  • __.

DATE OF MEETING NUMBER(S) OF EXEMPTIONS USED DATE OF MEETING NUMBEA(S) OF EXEMPTIONS USED

a. None e.
b. f.

C. g.

d. h.

0 'X"' In appropriate bo:c)

6. ESTABL.ISHMENT AUTHORITY FOR COMMITTEE (Mark D a. SPecifically directed by law ~ c. Agency authority D b. Authorized by law D d. Presidential directive
7. AGENCY RECOMMENDATION FOR COMMITTEE (Mark "X"' in appropriate bo:c)

D a. Terminate ~ b. Continue

8. IF ITEMS 6(a) ~ 7(a) ARE MARKED, ANSWER THE FOLL.OWING QUESTIONS:

YES NO YES NO a. Is legislation required to terminate?................................. 1------1,------i c. Is such legislation pending ?.................................... 1-----+---1 b. Is such legislation contemplated?................................... d. Has such legislation been enacted?.........................

9. IF~ ANSWER IN ITEM 8(a) THROUGH (d) IS MARKED "NO", PROVIDE A BRIEF EXPLANATION

10. IF THE ANSWER TO ITEM 8(c) OR (d) IS MARKED "YES", PROVIDE THE FOLLOWING INFORMATION

a. BILL OR PUBLIC LAW NUMBER b, PROPOSED OR EFFECTIVE DATE

- 11, IF ITEM 6(bfOR 6TcJA"NO 71a) 12. IF ITEMS 6(d) AND 7(a) ARE MARKED, PROVIDE A BRIEF EXPLANATION ARE MARKED, PROVIDE THE PROPOSED OR EFFECTIVE DATE

13. IF ITEM 7(b) IS MARKED, ATTACH A JUSTIFICATION STATEMENT TO THIS FORM USING NUMBERED BOND SHEETS WITH ITEMS l, ON EACH SHEET. THE JUSTIFICATION SHOULD: 2, ANO 3

a. Describe how the committee accomplishes its-purpose.- -

b. State wh y there is a compelling need for the committee.

c. Describe the balance of membership in terms of points of view represented and functions performed.

d. Describe the frequency of meetings and the relevance to continuing the committee.
e. Describe the effect of committee reports, advice, or recommendations on agency operations.
f. Explain why the advice or information cannot be obtained from other sources.
g. Explain any duplication of effort with other committees, within the agency, or with other agencies.
h. Describe the relationship of the cost of the committee to the advice or information provided.

GENERAL SERVICES ADMINISTRATION STANDARD FORM 292 (12-80) Pre~crlbed bY GSA

  • ,FPMR 101~.lO