ENS 57191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 22: Line 22:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
No fission products were detected in the primary, pool, or on an air particulate detector. The damaged element remains in its storage location in the pool with no other mitigating measures planned in the near term.
No fission products were detected in the primary, pool, or on an air particulate detector. The damaged element remains in its storage location in the pool with no other mitigating measures planned in the near term.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240626en.html#en57191
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240627en.html#en57191
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Revision as of 06:20, 27 June 2024

ENS 57191 +/-
Where
U. S. Geological Survey (Usgs)
Denver, Colorado (NRC Region 0)
License number: R-113
Reporting
Non
Time - Person (Reporting Time:+1.95 h0.0813 days <br />0.0116 weeks <br />0.00267 months <br />)
Opened: Johnathan Wallick
16:57 Jun 25, 2024
NRC Officer: Sam Colvard
Last Updated: Jun 25, 2024
57191 - NRC Website