Focused Engineering Inspection: Difference between revisions

From kanterella
Jump to navigation Jump to search
No edit summary
mNo edit summary
 
Line 5: Line 5:


==List of FEI==
==List of FEI==
* [[inspection procedure::IP 7111.21N.02]], Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
* [[inspection procedure::IP 71111.21N.02]], Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
* [[inspection procedure::IP 7111.21N.03]], Commercial Grade Dedication
* [[inspection procedure::IP 71111.21N.03]], Commercial Grade Dedication
* [[inspection procedure::IP 7111.21N.04]], Age-Related Degradation
* [[inspection procedure::IP 71111.21N.04]], Age-Related Degradation
* [[inspection procedure::IP 7111.21N.05]], Fire Protection Team Inspection (FPTI)
* [[inspection procedure::IP 71111.21N.05]], Fire Protection Team Inspection (FPTI)


== See also ==  
== See also ==  
* [[Comprehensive Engineering Team Inspection]] (CETI)
* [[Comprehensive Engineering Team Inspection]] (CETI)
* [[NRC Inspection]]
* [[NRC Inspection]]

Latest revision as of 08:26, 13 November 2023

Focused Engineering Inspection (FEI)

List of FEI

See also