Focused Engineering Inspection: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page with "'''Focused Engineering Inspection (has acronym::FEI)''' * letter::VR-SECY-22-0053, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections Periodicity (Baran) * URL::https://www.nrc.gov/docs/ML2132/ML21323A049.pdf ==List of FEI== * inspection procedure::IP 7111.21N.02, Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements * inspection procedure::IP 7111.21N.03, Commercial Grade Dedication * i...") |
StriderTol (talk | contribs) mNo edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 5: | Line 5: | ||
==List of FEI== | ==List of FEI== | ||
* [[inspection procedure::IP | * [[inspection procedure::IP 71111.21N.02]], Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements | ||
* [[inspection procedure::IP | * [[inspection procedure::IP 71111.21N.03]], Commercial Grade Dedication | ||
* [[inspection procedure::IP | * [[inspection procedure::IP 71111.21N.04]], Age-Related Degradation | ||
* [[inspection procedure::IP | * [[inspection procedure::IP 71111.21N.05]], Fire Protection Team Inspection (FPTI) | ||
== See also == | == See also == | ||
* [[Comprehensive Engineering Team Inspection]] (CETI) | * [[Comprehensive Engineering Team Inspection]] (CETI) | ||
* [[NRC Inspection]] | * [[NRC Inspection]] | ||
Latest revision as of 08:26, 13 November 2023
Focused Engineering Inspection (FEI)
- VR-SECY-22-0053, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections Periodicity (Baran)
- https://www.nrc.gov/docs/ML2132/ML21323A049.pdf
List of FEI
- IP 71111.21N.02, Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
- IP 71111.21N.03, Commercial Grade Dedication
- IP 71111.21N.04, Age-Related Degradation
- IP 71111.21N.05, Fire Protection Team Inspection (FPTI)